i
Rockman Industries
Filter interviews by
I applied via Referral and was interviewed in May 2024. There was 1 interview round.
Top trending discussions
I applied via Naukri.com and was interviewed before Nov 2021. There were 3 interview rounds.
I applied via Referral and was interviewed in Jun 2020. There were 4 interview rounds.
I applied via Recruitment Consultant and was interviewed before Jan 2021. There was 1 interview round.
There are 5 levels in PPAP (Production Part Approval Process).
PPAP has 5 levels: Level 1, Level 2, Level 3, Level 4, and Level 5.
Each level represents a different stage of the PPAP process.
Level 1 includes documentation submission, while Level 5 involves customer approval.
The higher the level, the more comprehensive the PPAP requirements become.
PPAP is used to ensure that suppliers meet the quality standards of their c
Cp measures the capability of a process to meet specifications, while Cpk measures the capability of a process to meet specifications considering centering.
Cp is a short-term capability index, while Cpk is a long-term capability index.
Cp considers only the spread of the process, while Cpk considers both the spread and the centering of the process.
Cp is calculated using the formula Cp = (USL - LSL) / (6 * standard devia...
CAPA stands for Corrective and Preventive Action. It is a systematic approach to identify, investigate, and resolve quality issues.
CAPA is a key component of quality management systems.
It involves identifying the root cause of a problem, implementing corrective actions to address the immediate issue, and preventive actions to prevent recurrence.
CAPA processes typically include steps like problem identification, investi...
I applied via Company Website and was interviewed in Feb 2023. There were 3 interview rounds.
Different types of moulds used in engineering
1k moulds are single-shot moulds used for simple parts
2k moulds are two-shot moulds used for complex parts with multiple materials
Mechatronics moulds are used for high-precision parts with electronic components
Mechatronics moulds require specialized knowledge in both mechanical and electrical engineering
I appeared for an interview in Jan 2025.
Core tools and techniques used in quality engineering include 5 core tools, 7 QC tools, 8D methodology, and the Why-Why analysis.
5 Core Tools: APQP, PPAP, FMEA, MSA, SPC
7 QC Tools: Check sheets, Pareto charts, Cause-and-effect diagrams, Histograms, Scatter diagrams, Control charts, Flowcharts
8D Methodology: Eight disciplines problem solving approach used to identify, correct, and prevent recurring problems
Why-Why Analy...
The role of a company in Design for Manufacturability (DWM) is to ensure that products are designed in a way that makes them easy and cost-effective to manufacture.
Ensuring that product designs are optimized for efficient manufacturing processes
Collaborating with design and manufacturing teams to identify and address potential manufacturing challenges early in the design phase
Implementing design guidelines and best pra...
MSA stands for Measurement System Analysis and SPC stands for Statistical Process Control.
MSA is a method used to assess the measurement system variation to ensure data accuracy.
SPC is a method used to monitor and control a process through statistical analysis.
MSA includes Gage R&R studies to evaluate the measurement system's repeatability and reproducibility.
SPC involves using control charts to detect any variatio...
Process quality refers to the level of consistency, accuracy, and effectiveness in the execution of a particular process.
Process quality is about ensuring that a specific process consistently meets the desired standards and requirements.
It involves identifying and eliminating defects, errors, and variations in the process to improve overall quality.
Process quality can be measured using metrics such as defect rates, cyc...
8D is a problem-solving methodology used in quality management to identify, correct, and prevent recurring problems.
8D stands for 8 disciplines, each representing a step in the problem-solving process
Steps include defining the problem, forming a team, identifying root causes, implementing corrective actions, and preventing recurrence
Example: A manufacturing company uses 8D to address a recurring defect in their product
based on 1 interview
Interview experience
based on 21 reviews
Rating in categories
Assistant Engineer
212
salaries
| ₹2 L/yr - ₹4.6 L/yr |
Senior Engineer
210
salaries
| ₹3.4 L/yr - ₹8.4 L/yr |
Engineer
206
salaries
| ₹2.8 L/yr - ₹5.9 L/yr |
Assistant Manager
166
salaries
| ₹4 L/yr - ₹12.5 L/yr |
Production Engineer
153
salaries
| ₹2.2 L/yr - ₹5.6 L/yr |
Bosch
Ceat Tyres
UNO Minda
Apollo Tyres