Filter interviews by
I applied via Approached by Company and was interviewed before Apr 2022. There was 1 interview round.
Technical causes of defects in fabric include yarn defects, weaving defects, and finishing defects.
Yarn defects such as knots, slubs, and uneven thickness can cause defects in the fabric.
Weaving defects such as broken warp or weft threads, skipped threads, or incorrect tension can cause defects.
Finishing defects such as uneven dyeing, improper washing, or incorrect pressing can also cause defects.
Other technical causes...
Top trending discussions
I applied via Naukri.com and was interviewed before Aug 2021. There were 3 interview rounds.
The gate is an OR gate.
An OR gate produces a high output if any of its inputs are high.
It follows the logic of 'if A or B or C is high, then the output is high'.
Examples of OR gates include the 7402 IC and the OR gate symbol in digital circuit diagrams.
A multimeter can be used in digital circuits to measure voltage, current, and resistance.
Set the multimeter to the appropriate mode (voltage, current, or resistance)
Connect the multimeter probes to the circuit
Read the measurement value on the multimeter display
Example: To measure voltage, set the multimeter to voltage mode, connect the probes across the component or circuit, and read the voltage value on the display
The gate that has a more complex input than output is the NAND gate.
NAND gate has an output that is high only when both inputs are low.
It is considered more complex because it combines the functions of an AND gate and a NOT gate.
Other gates like AND, OR, and XOR have simpler input-output relationships.
High currents will flow in conductive materials.
High currents flow through materials with low resistance.
Conductive materials such as metals allow high currents to pass through them.
Examples of conductive materials include copper, aluminum, and silver.
High currents are commonly found in electrical circuits and power transmission systems.
An ammeter is connected in series with the circuit to measure the current flowing through it.
Connect the positive terminal of the ammeter to the positive terminal of the power source.
Connect the negative terminal of the ammeter to the load or component where you want to measure the current.
Ensure that the ammeter is capable of measuring the expected current range to avoid damaging it.
Avoid connecting the ammeter direct...
posted on 13 Jul 2025
I appeared for an interview before Jul 2024, where I was asked the following questions.
Effective tools for project escalation include communication platforms, project management software, and structured reporting methods.
Utilize project management software like Asana or Trello to track progress and identify delays.
Implement regular status meetings to discuss project timelines and address issues promptly.
Use escalation matrices to define clear pathways for raising concerns to higher management.
Leverage co...
I appeared for an interview in Jun 2025, where I was asked the following questions.
I appeared for an interview before Feb 2023.
PPAP stands for Production Part Approval Process. It is a standardized process in the automotive industry to ensure suppliers meet quality requirements.
PPAP is a set of documents and requirements that must be submitted by suppliers to demonstrate their ability to meet customer specifications.
Elements in PPAP checklist include: design records, engineering change documents, process flow diagram, control plan, measurement...
posted on 16 Sep 2022
I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Aug 2021. There was 1 interview round.
I appeared for an interview before Jul 2024, where I was asked the following questions.
I am a dedicated professional with a strong background in management and a passion for team development and operational excellence.
Over 5 years of experience in team leadership, successfully managing a team of 10 in a retail environment.
Implemented a new inventory management system that reduced stock discrepancies by 30%.
Strong communication skills, demonstrated by leading weekly team meetings to foster collaboration.
P...
I have over five years of experience in management, focusing on team leadership and project execution in various industries.
Led a team of 10 in a retail environment, improving sales by 20% through effective training and motivation.
Managed a project that streamlined operations, reducing costs by 15% and increasing efficiency.
Implemented a new customer feedback system that enhanced service quality and increased customer ...
Dynamic professional with 5 years of experience in management, skilled in team leadership and project execution.
Led a team of 10 in a successful project that increased sales by 20% over six months.
Implemented a new training program that improved employee performance metrics by 15%.
Managed cross-departmental collaboration, resulting in a 30% reduction in project turnaround time.
Conducted regular performance reviews and ...
based on 1 interview experience
Difficulty level
Duration
based on 7 reviews
Rating in categories
Assistant Manager
16
salaries
| ₹4.2 L/yr - ₹8.6 L/yr |
Senior Officer
8
salaries
| ₹3 L/yr - ₹6.2 L/yr |
Officer
6
salaries
| ₹2 L/yr - ₹5 L/yr |
Deputy General Manager
5
salaries
| ₹10.1 L/yr - ₹22.3 L/yr |
General Manager
4
salaries
| ₹19.8 L/yr - ₹25.3 L/yr |
Hero Motors Company
Bajaj Motors
Knorr-Bremse
Astral Adhesives