Filter interviews by
I applied via Referral and was interviewed before Nov 2021. There were 3 interview rounds.
They basically check your general knowledge and way of talking.
I applied via Company Website and was interviewed in Jan 2021. There were 3 interview rounds.
Various documents need to be maintained at the PMC office.
Project proposals and contracts
Budget and financial reports
Meeting minutes and agendas
Employee records and HR documents
Project progress reports
Legal and regulatory documents
Correspondence and communication records
Inventory and asset management records
Project controlling is exercised through monitoring, measuring, and adjusting project activities to ensure they align with project goals.
Project controlling involves setting up a project plan with clear goals and objectives.
Regular monitoring and measurement of project activities against the plan is necessary.
Adjustments are made to the project plan as needed to ensure alignment with project goals.
Project controlling a...
The limits of deviation of BOQ quantities as per CPWD norms depend on the type of work and range from -5% to +10%.
The limits of deviation are specified in the CPWD Manual.
For civil works, the limit of deviation is -5% to +10%.
For electrical and mechanical works, the limit of deviation is -10% to +15%.
For interior works, the limit of deviation is -10% to +20%.
The limits of deviation may vary depending on the type of wor...
Mivan shuttering has limitations in terms of design flexibility and cost-effectiveness.
Mivan shuttering is not suitable for complex designs or irregular shapes.
It requires skilled labor and specialized equipment, which can increase the overall cost.
It may not be suitable for small-scale projects due to the high initial investment.
It may not be suitable for projects with limited space or difficult access.
It may not be s...
CPWD norms for working space area for calculating earthworm quantity in excavation of basement
CPWD recommends a working space area of 1.5 times the depth of excavation for calculating earthworm quantity
For example, if the depth of excavation is 2 meters, the working space area should be 3 meters
This calculation is important for determining the amount of organic matter in the soil and the need for soil improvement
CPWD g...
posted on 31 Mar 2016
I applied via Campus Placement and was interviewed in Mar 2016. There were 2 interview rounds.
posted on 31 May 2022
I applied via Job Fair and was interviewed before May 2021. There were 2 interview rounds.
QUant, aptitude, english all in one hour
It was about the road curves and what kind of material we can use for the long durability of road
posted on 28 Mar 2024
posted on 28 Mar 2024
SDLC stands for Software Development Life Cycle, which is a process used by software development teams to design, develop, and test high-quality software.
SDLC consists of several phases including planning, analysis, design, implementation, testing, and maintenance.
Each phase has its own set of activities and deliverables to ensure the software meets the requirements and quality standards.
Examples of SDLC models include...
CAN protocol is a communication standard used in automotive and industrial applications.
CAN protocol stands for Controller Area Network
It is a message-based protocol used for communication between electronic control units (ECUs)
CAN protocol allows for high-speed communication and real-time data transmission
It is commonly used in automotive applications for functions such as engine control, transmission control, and bod...
posted on 30 May 2024
I was interviewed before Jan 2023.
based on 1 review
Rating in categories
Computer Operator
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Data Entry Operator
4
salaries
| ₹0 L/yr - ₹0 L/yr |
RTO Executive
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Account Assistant
3
salaries
| ₹0 L/yr - ₹0 L/yr |
Typist
3
salaries
| ₹0 L/yr - ₹0 L/yr |
Bombardier Transportation
Indira Gandhi International Airport
Indian Railway Catering and Tourism
Hyva