Q1. How do work step up transformer

Ans.

A step-up transformer is used to increase the voltage in an electrical circuit.

  • Step-up transformers have more turns in the secondary coil than in the primary coil.

  • They work based on the principle of electromagnetic induction.

  • The primary coil is connected to a power source with a lower voltage, while the secondary coil is connected to the load.

  • The increased voltage in the secondary coil is proportional to the ratio of the number of turns in the secondary coil to the number of ...read more

View 2 more answers
right arrow

Q2. What is the difference between msp and primavera

Ans.

MSP (Microsoft Project) is a project management software developed by Microsoft, while Primavera is a project management software developed by Oracle.

  • MSP is developed by Microsoft, while Primavera is developed by Oracle.

  • MSP is more commonly used for smaller projects, while Primavera is preferred for larger and more complex projects.

  • MSP is known for its user-friendly interface and ease of use, while Primavera is known for its robust features and advanced capabilities.

  • MSP is of...read more

Add your answer
right arrow

Q3. How will you plan a 50 Mwp project

Ans.

I will plan a 50 Mwp project by conducting feasibility studies, creating a detailed project timeline, securing necessary permits, sourcing materials and contractors, and implementing a quality control plan.

  • Conduct feasibility studies to assess site suitability and potential challenges

  • Create a detailed project timeline outlining key milestones and deadlines

  • Secure necessary permits and approvals from local authorities

  • Source materials and contractors through a competitive biddin...read more

Add your answer
right arrow

Q4. What is a critical path

Ans.

The critical path is the longest sequence of tasks in a project that must be completed on time in order for the project to finish on schedule.

  • Identifying the critical path helps in determining the minimum time needed to complete a project.

  • It consists of tasks that have zero slack or float, meaning any delay in these tasks will delay the entire project.

  • Activities on the critical path are often marked with a double line in project management diagrams.

  • By focusing on tasks on the...read more

Add your answer
right arrow
Discover Rays Power Infra interview dos and don'ts from real experiences

Q5. Pv Solar plant Commissioning process

Ans.

The commissioning process of a PV solar plant involves testing, adjusting, and optimizing the system to ensure it is functioning properly.

  • Testing the electrical components and connections to ensure they are working correctly

  • Adjusting the system settings to maximize efficiency and output

  • Optimizing the performance of the solar panels to achieve the desired energy production

  • Checking for any potential issues or malfunctions that may affect the operation of the plant

Add your answer
right arrow

Q6. Transformer types of testing

Ans.

Transformer types of testing include routine tests, type tests, and special tests to ensure proper functioning and safety.

  • Routine tests include insulation resistance, turns ratio, and polarity tests.

  • Type tests are conducted on a prototype to verify design parameters like temperature rise and short-circuit withstand.

  • Special tests may include impulse voltage, partial discharge, and noise level tests.

  • Testing ensures transformers meet performance standards and safety regulations.

Add your answer
right arrow

Q7. What is your knowledge base?

Ans.

I possess a diverse knowledge base in management, operations, and team leadership, complemented by industry-specific insights.

  • Strong understanding of project management principles, demonstrated by successfully leading a cross-functional team to complete a project ahead of schedule.

  • Proficient in data analysis and reporting, utilizing tools like Excel and Tableau to drive informed decision-making.

  • Experience in budget management, having overseen departmental budgets and achieved...read more

Add your answer
right arrow
Contribute & help others!
Write a review
Write a review
Share interview
Share interview
Contribute salary
Contribute salary
Add office photos
Add office photos

Interview Process at Rays Power Infra

based on 17 interviews
Interview experience
4.2
Good
View more
interview tips and stories logo
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

Hexaware Technologies Logo
3.5
 • 383 Interview Questions
Deutsche Bank Logo
3.9
 • 304 Interview Questions
Morgan Stanley Logo
3.7
 • 262 Interview Questions
Startek Logo
3.1
 • 180 Interview Questions
Zomato Logo
3.8
 • 150 Interview Questions
Yes Bank Logo
3.7
 • 143 Interview Questions
View all
Recently Viewed
JOBS
Best Choice Consultant
No Jobs
SALARIES
Ganges Internationale
SALARIES
Elite Powertech
SALARIES
Elite Powertech
SALARIES
Elite Powertech
SALARIES
Manikaran Power Limited
No Salaries
JOBS
Ganges Internationale
No Jobs
SALARIES
Elite Powertech
SALARIES
Manikaran Power Limited
JOBS
Rays Power Infra
No Jobs
Top Rays Power Infra Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
play-icon
play-icon
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
75 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter