Filter interviews by
I applied via Referral and was interviewed before May 2023. There were 4 interview rounds.
Top trending discussions
I applied via Recruitment Consultant and was interviewed in Apr 2020. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Oct 2020. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before May 2021. There was 1 interview round.
Proxy is an intermediary server that acts as a gateway between clients and servers. SMPS is a power supply unit that converts AC to DC. Encoder is a device that converts motion into digital signals. Star delta is a method of starting three-phase motors.
Proxy helps in hiding the identity of clients and servers.
SMPS is commonly used in computers and other electronic devices.
Encoders are used in robotics, automation, and ...
I applied via Naukri.com and was interviewed in Feb 2021. There were 3 interview rounds.
posted on 10 Feb 2022
I applied via Recruitment Consulltant and was interviewed before Feb 2021. There were 2 interview rounds.
posted on 22 Jan 2023
I applied via Company Website and was interviewed in Dec 2022. There were 4 interview rounds.
Preventive maintenance is scheduled maintenance to prevent breakdowns while predictive maintenance uses data to predict failures.
Preventive maintenance involves regularly scheduled maintenance to prevent equipment breakdowns and prolong the lifespan of equipment.
Predictive maintenance uses data analysis to predict when equipment failure is likely to occur, allowing for maintenance to be scheduled before a breakdown occ...
PLC stands for Programmable Logic Controller and HMI stands for Human Machine Interface.
PLC is a digital computer used for automation of electromechanical processes.
It is used to control machinery on factory assembly lines, amusement rides, or light fixtures.
HMI is a graphical interface that allows humans to interact with machines.
It provides a visual representation of the process being controlled by the PLC.
Examples o...
Power factor can be managed by using capacitors, improving equipment efficiency, and reducing reactive power.
Install capacitors to offset reactive power and improve power factor
Upgrade equipment to more efficient models
Reduce the amount of reactive power by optimizing operations
Implement power factor correction techniques
Regularly monitor and maintain power factor levels
Pressure relief valve releases excess pressure to prevent damage, while pressure reducing valve reduces pressure to a desired level.
Pressure relief valve is used to protect equipment from overpressure by releasing excess pressure to the atmosphere.
Pressure reducing valve is used to reduce the pressure of a fluid to a desired level in a system.
Pressure relief valves are typically found in systems where pressure buildup ...
Hydraulic piston pumps offer higher efficiency, variable flow rates, and better control compared to fixed displacement vane pumps.
Hydraulic piston pumps have higher efficiency due to their ability to vary flow rates based on demand, reducing energy consumption.
Piston pumps provide better control over fluid flow and pressure, making them suitable for applications requiring precise operation.
Piston pumps are more durable...
based on 1 interview
Interview experience
Engineer
50
salaries
| ₹2.3 L/yr - ₹4.9 L/yr |
Senior Engineer
50
salaries
| ₹3.8 L/yr - ₹7.3 L/yr |
Assistant Manager
46
salaries
| ₹6 L/yr - ₹11 L/yr |
Assistant Engineer
41
salaries
| ₹1.7 L/yr - ₹3.5 L/yr |
Production Engineer
33
salaries
| ₹2.2 L/yr - ₹5.2 L/yr |
ArcelorMittal Nippon Steel
Jindal Stainless
Jindal Saw
SHYAM METALICS AND ENERGY