I applied via Newspaper Ad and was interviewed before Sep 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Personal, family details, current sallery, total experience, why you change the company
Round 3 - Technical 

(4 Questions)

  • Q1. Project sheduling
  • Q2. Resources allocation
  • Q3. Work breakdown structure
  • Q4. Making of DPR, WPR, MPR presentation
  • Ans. 

    DPR, WPR, MPR presentations are essential for project planning and progress tracking.

    • DPR (Daily Progress Report) should include details of work completed, challenges faced, and plans for the next day.

    • WPR (Weekly Progress Report) should summarize the progress made during the week, highlight any delays or issues, and propose solutions.

    • MPR (Monthly Progress Report) should provide a comprehensive overview of the project st...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - If you have knowledge about msp software then easy to join as a planning engineer and be confident during conducting interview

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Civil engineering
  • Q2. Civil engineering responsibility timely site work .
Round 3 - Technical 

(2 Questions)

  • Q1. Civil engineering
  • Q2. Site relative question
Round 4 - Technical 

(2 Questions)

  • Q1. Site Execution qution
  • Q2. Highway Road Project qution

Interview Preparation Tips

Interview preparation tips for other job seekers - Bridges ,Highway Road Project and Railway Project flyovers
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Nov 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Earth moving Equipment, crusher plant,hotmix plant concrete plant, operation and maintenance
  • Q2. Plant and equipment related
Interview experience
3
Average
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I applied via Job Portal

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. How many year experience ?
  • Q2. How to use bentonite use before pulsing
  • Ans. 

    Bentonite is used as a drilling fluid to stabilize boreholes before pulsing.

    • Bentonite is mixed with water to form a slurry and pumped into the borehole.

    • The slurry fills the borehole and stabilizes the walls, preventing collapse.

    • After the bentonite has set, pulsing can be done without the risk of borehole collapse.

    • Pulsing is a technique used in geophysical exploration to measure the properties of the subsurface.

  • Answered by AI
  • Q3. 1.03 mgl to 1.10 mgl

Interview Preparation Tips

Interview preparation tips for other job seekers - Piling work(550mm,600mm,750mm and 1000mm dia pile),survey,Client bills
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Feb 2023. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Basic Question about your current work and technical question of what they want in me
Round 2 - Technical 

(1 Question)

  • Q1. Case study like what action you take in this particular problem
Round 3 - HR 

(1 Question)

  • Q1. Salary discussion and document sharing

I was interviewed in Jan 2022.

Round 1 - HR 

(2 Questions)

  • Q1. Tell me about yourself.
  • Q2. What about you privious experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Working on WBS and ACE for civil construction

I was interviewed before Sep 2016.

Interview Questionnaire 

1 Question

  • Q1. Ocampo, basic electronics and C

Interview Preparation Tips

Round: Test
Duration: 1 hour
Total Questions: 50

Skills: Embedded Systems, C Programming
College Name: Sahyadri college of engineering

I applied via PLACEMENT

Interview Preparation Tips

Round: Technical Interview
Experience: Good detailed interview in terms of technical knowledge
Tips: Should be thorough with the projects you have done during the course

General Tips: be confident of what you put in your resume
Technical knowledge regarding projects undertaken during engineering should be sound
Be confident
Skills: Communication, Thinking capability, knowledge applying capability
College Name: V.E.S Institute Of Technology
Motivation: Opportunity to work in a renowned and core technical company
Funny Moments: We consider the interview panelists to be as tough as our viva externals. Interviewers are mostly on your side(contrary to viva professors :P)

I applied via Campus Placement and was interviewed before Jun 2021. There were 2 interview rounds.

Round 1 - Aptitude Test 

Aptitude question and reasoning.

Round 2 - interview 

(1 Question)

  • Q1. Design of a building
  • Ans. 

    Design of a building

    • Determine the purpose and function of the building

    • Consider the site and location

    • Create a preliminary design and get feedback

    • Finalize the design and create detailed plans

    • Ensure compliance with building codes and regulations

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - It is good for all freshers. all the facilities and pay scale are quite good.

Interview Questionnaire 

5 Questions

  • Q1. Pertaining to the mentioned roles and responsibilities in your resume
  • Q2. Planning and work order creation
  • Q3. Piling activities
  • Q4. Introduction
  • Q5. Cross checking of documents

Interview Preparation Tips

Round: Resume Shortlist
Experience: On the criteria that I scored atleast 60% overall and had no gap between job/s.

Ratilal Bhagwandas Construction Interview FAQs

How many rounds are there in Ratilal Bhagwandas Construction Planning Engineer interview?
Ratilal Bhagwandas Construction interview process usually has 3 rounds. The most common rounds in the Ratilal Bhagwandas Construction interview process are Resume Shortlist, HR and Technical.
What are the top questions asked in Ratilal Bhagwandas Construction Planning Engineer interview?

Some of the top questions asked at the Ratilal Bhagwandas Construction Planning Engineer interview -

  1. Making of DPR, WPR, MPR presentat...read more
  2. Work breakdown struct...read more
  3. Project shedul...read more

Tell us how to improve this page.

Ratilal Bhagwandas Construction Planning Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more
Accountant
10 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Billing Engineer
7 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Junior Engineer Civil
7 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
6 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

HR Assistant
6 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Ratilal Bhagwandas Construction with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

GMR Group

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview