Filter interviews by
I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.
Top trending discussions
posted on 30 Jun 2023
I applied via Walk-in and was interviewed before Jun 2022. There were 3 interview rounds.
posted on 17 Dec 2024
posted on 28 Dec 2024
I applied via Walk-in and was interviewed in Jun 2024. There was 1 interview round.
OEE stands for Overall Equipment Effectiveness and is a measure of how well a manufacturing process is performing.
OEE is calculated by multiplying Availability, Performance, and Quality.
Availability is the ratio of operating time to planned production time.
Performance is the ratio of actual production to maximum possible production.
Quality is the ratio of good parts to total parts produced.
OEE = Availability x Performa...
G code and M code are machine codes used in CNC programming to control the movements and functions of a machine tool.
G code is used to control the movements of the machine, such as linear or circular interpolation.
M code is used to control auxiliary functions of the machine, such as turning on or off coolant or spindle rotation.
G codes are typically used for positioning and feed rate control, while M codes are used for...
I have used software to create programs.
I have used software like AutoCAD, SolidWorks, and MATLAB to create programs for production engineering.
Using software allows for more precise and efficient programming compared to manual methods.
Software also helps in simulating and testing programs before implementation.
I applied via Referral and was interviewed in May 2024. There were 2 interview rounds.
Assembly BIW production process involves various parameters to ensure weld quality.
Ensure proper fit-up of components before welding
Maintain correct welding parameters such as voltage, current, and travel speed
Use appropriate shielding gas and welding consumables
Regularly inspect and maintain welding equipment
Implement quality control measures such as visual inspection and non-destructive testing
Online test conducted for 1 hour atlest
I applied via Campus Placement and was interviewed in Oct 2023. There were 3 interview rounds.
5S is a workplace organization method that improves efficiency and safety. 3M and 3K refer to the principles of Muda, Mura, and Muri in lean manufacturing. KANBAN is a visual scheduling system used to manage production flow.
5S involves Sort, Set in order, Shine, Standardize, and Sustain to create a clean and organized work environment.
3M (Muda, Mura, Muri) are the three types of waste in lean manufacturing - Muda (wast...
Manpower handling refers to managing and overseeing the workforce in a production setting. Kaizen is a continuous improvement philosophy aimed at making small, incremental changes for efficiency.
Manpower handling involves recruiting, training, scheduling, and supervising employees to ensure smooth production operations.
Kaizen is a Japanese term meaning 'continuous improvement'. It focuses on making small, incremental c...
posted on 28 Aug 2023
I applied via Recruitment Consulltant
Assistant Manager
136
salaries
| ₹4.6 L/yr - ₹9 L/yr |
Senior Engineer
107
salaries
| ₹3 L/yr - ₹6.5 L/yr |
Deputy Manager
78
salaries
| ₹6.2 L/yr - ₹14.3 L/yr |
Quality Inspector
56
salaries
| ₹1.2 L/yr - ₹3 L/yr |
Senior Executive
48
salaries
| ₹3.2 L/yr - ₹7 L/yr |
Sundaram Clayton
Amara Raja Energy & Mobility
Samvardhana Motherson Group
Bharat Forge