Filter interviews by
I appeared for an interview before Jan 2021.
I am unable to disclose my previous basic salary due to confidentiality agreements.
Confidentiality agreements prevent me from disclosing my previous basic salary.
I am happy to discuss my salary expectations for this role.
My previous salary is not relevant to my qualifications and experience for this position.
I have 10 years of experience in software engineering.
10 years of experience in software engineering
Proficient in various programming languages and technologies
Led multiple successful projects from conception to completion
I have extensive experience with Mivan shuttering work in various construction projects.
Managed Mivan shuttering work for high-rise residential buildings
Coordinated with subcontractors for timely completion of Mivan shuttering
Ensured quality control and adherence to safety standards in Mivan shuttering
Trained junior engineers on Mivan shuttering techniques
I applied via Walk-in and was interviewed before May 2022. There were 2 interview rounds.
To calculate concrete grades, BBS or bar bending schedule is used.
BBS is a list of reinforcement bars with their lengths and sizes.
Based on the design, the required amount of steel is calculated and added to the BBS.
Concrete grades are determined based on the strength required for the structure.
Common concrete grades are M20, M25, M30, etc.
The mix proportion of cement, sand, and aggregate is determined based on the con
Rama group interview questions for popular designations
I applied via Company Website and was interviewed in Dec 2021. There were 4 interview rounds.
Yes, ERP stands for Enterprise Resource Planning.
ERP is a software system that integrates various business processes and functions into a single platform.
It helps organizations streamline their operations, improve efficiency, and make data-driven decisions.
ERP modules can include finance, human resources, supply chain management, customer relationship management, etc.
Examples of popular ERP systems are SAP, Oracle ERP,
I applied via Approached by Company and was interviewed before Mar 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.
A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.
Shunt relay is connected in parallel with the main circuit of the ACB.
It detects overcurrents and activates to divert the excess current through a shunt path.
This helps in protecting the main circuit from damage due to overcurrents.
Shunt relays are commonly used in Air Circuit Breakers (ACBs...
CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.
CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.
It is often required in HVAC projects to ensure quality and compliance.
CoC may include details such as product specifications, testing results, and manufacturer information.
Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.
Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.
Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.
BOD is a ...
A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.
Monitors voltage levels in electrical systems
Triggers alarm or protective action if voltage exceeds or falls below set threshold
Used to protect equipment from damage due to voltage fluctuations
WTP plant works on the principle of physical and chemical processes to remove impurities from water.
Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.
Coagulation involves adding chemicals to water to make impurities clump together.
Flocculation helps in forming larger particles called floc for easier removal.
Sedimentation allows the floc to sett...
I provide daily and monthly reports on project progress, issues, and key metrics to track performance.
Daily reports include updates on tasks completed, challenges faced, and plans for the next day.
Monthly reports summarize overall progress, budget status, and any potential risks or delays.
Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...
based on 9 interviews
Interview experience
based on 98 reviews
Rating in categories
Sales Executive
20
salaries
| ₹3 L/yr - ₹5.2 L/yr |
Senior Engineer
16
salaries
| ₹3.8 L/yr - ₹8.4 L/yr |
Junior Engineer
15
salaries
| ₹2.8 L/yr - ₹4.5 L/yr |
Sales Manager
13
salaries
| ₹6.4 L/yr - ₹12 L/yr |
Assistant Sales Manager
12
salaries
| ₹5.2 L/yr - ₹7.2 L/yr |
JLL
CBRE
NoBroker
Lodha Group