Filter interviews by
I applied via Approached by Company and was interviewed before Jun 2023. There was 1 interview round.
ERP implementation process involves planning, customization, testing, training, and deployment.
Planning phase involves defining goals, selecting ERP system, and creating a project plan.
Customization phase includes configuring the ERP system to meet the organization's specific needs.
Testing phase involves testing the system for bugs, errors, and ensuring it meets requirements.
Training phase includes training employees o...
The ERP system will be implemented through a phased approach involving planning, customization, testing, training, and deployment.
Develop a detailed implementation plan outlining key milestones and timelines
Customize the ERP system to meet the specific needs of the organization
Conduct thorough testing to ensure the system functions correctly and meets requirements
Provide comprehensive training to end users to ensure su...
I applied via Referral and was interviewed before Sep 2022. There were 2 interview rounds.
I was interviewed before Apr 2022.
I applied via Walk-in and was interviewed before Jul 2022. There were 3 interview rounds.
Full form of HYSD Density and grade of steel
Related Is code properties of soil and cement RE wall etc
Ram Kripal Singh Construction interview questions for popular designations
I applied via Approached by Company and was interviewed before Jun 2021. There were 3 interview rounds.
Top trending discussions
I applied via Referral and was interviewed before Dec 2021. There were 3 interview rounds.
Seeking new challenges and opportunities for growth.
Looking for new challenges and opportunities to learn and grow.
Desire for career advancement and professional development.
Seeking a better work-life balance or company culture.
Relocation or personal reasons.
Company restructuring or changes in management.
I am responsible for managing the IT infrastructure, overseeing network security, and leading a team of IT professionals.
Managing IT infrastructure
Overseeing network security
Leading a team of IT professionals
Yes, configuring RF devices involves setting up and optimizing radio frequency devices for optimal performance.
Configuring RF devices involves adjusting settings such as frequency, power levels, and modulation to ensure proper communication.
Examples of RF devices include routers, access points, and wireless adapters.
Proper configuration of RF devices is essential for reliable wireless communication and network performa
Materials needed for installing and configuring CCTV include cameras, cables, DVR/NVR, monitor, power supply, and tools.
Cameras (e.g. dome cameras, bullet cameras)
Cables (e.g. coaxial cables, Ethernet cables)
DVR/NVR (Digital Video Recorder/Network Video Recorder)
Monitor (for viewing footage)
Power supply (for cameras and DVR/NVR)
Tools (e.g. drill, screwdriver)
Yes, I have knowledge about firewall devices.
Firewall devices are used to monitor and control incoming and outgoing network traffic based on predetermined security rules.
They can be hardware-based or software-based.
Examples of firewall devices include Cisco ASA, Palo Alto Networks, and Fortinet.
Firewalls can be configured to block certain types of traffic, such as specific websites or protocols.
They are essential for n...
There are two main types of switches used in networking for LAN network and CCTV network: managed switches and unmanaged switches.
Managed switches offer more control and features, such as VLAN support and Quality of Service (QoS) settings.
Unmanaged switches are simpler and easier to set up, but offer less customization and control.
Examples of managed switches include Cisco Catalyst series and HP ProCurve series.
Example...
Basic aptitude questions
posted on 23 Jan 2025
I was interviewed in Dec 2024.
Maintenance procedures involve regular inspections, testing, and repairs to ensure equipment functionality and safety.
Regularly schedule maintenance tasks to prevent breakdowns and ensure equipment longevity
Conduct thorough inspections to identify potential issues before they escalate
Keep detailed records of maintenance activities and equipment history
Train staff on proper maintenance procedures and safety protocols
Uti...
To maintain a battery bank, regular inspections, proper charging, temperature control, and monitoring electrolyte levels are essential.
Perform regular inspections to check for signs of corrosion, leaks, or damage
Ensure proper charging by following manufacturer's guidelines and avoiding overcharging
Control temperature to prevent overheating or freezing, which can reduce battery life
Monitor electrolyte levels and top up ...
posted on 3 Dec 2024
I applied via Campus Placement and was interviewed in Nov 2024. There was 1 interview round.
posted on 13 Jan 2025
based on 7 interviews
Interview experience
based on 114 reviews
Rating in categories
Civil Site Engineer
39
salaries
| ₹1.8 L/yr - ₹5.4 L/yr |
Site Engineer
31
salaries
| ₹2 L/yr - ₹4.8 L/yr |
Civil Engineer
12
salaries
| ₹2.1 L/yr - ₹4.8 L/yr |
Accountant
11
salaries
| ₹1.8 L/yr - ₹3.8 L/yr |
Billing Engineer
10
salaries
| ₹5.4 L/yr - ₹8.4 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GMR Group