Filter interviews by
I have 2 years of experience working as an Account Assistant in a medium-sized company.
Managed accounts payable and receivable
Assisted with budgeting and financial reporting
Performed bank reconciliations and financial analysis
The golden rules of accounts are fundamental principles that guide the recording and reporting of financial transactions.
Debit what comes in, credit what goes out
Debit the receiver, credit the giver
Debit all expenses and losses, credit all incomes and gains
Top trending discussions
I applied via Referral and was interviewed before Oct 2020. There was 1 interview round.
I applied via Naukri.com and was interviewed in Mar 2024. There were 3 interview rounds.
Questions on JD and education
posted on 18 May 2024
posted on 12 Jan 2023
I applied via Naukri.com and was interviewed before Jan 2022. There were 4 interview rounds.
posted on 3 Apr 2024
Basic Electrical questions,PlC related questions stabilizer inverter convertor question
I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.
Process engineering involves designing, optimizing, and managing industrial processes to improve efficiency and productivity.
Process engineering focuses on analyzing and improving processes in various industries such as manufacturing, chemical, and pharmaceutical.
It involves identifying bottlenecks, reducing waste, and implementing process improvements to enhance productivity.
Process engineers use tools like process fl...
cp and pp are both commands in Unix-like operating systems, but they have different functionalities.
cp stands for 'copy' and is used to copy files or directories from one location to another.
pp stands for 'print and pause' and is used to print files with pagination, pausing after each page.
cp can be used to create a duplicate of a file or directory, while pp is used for printing files in a controlled manner.
Example: cp...
A control plan is a documented procedure that outlines the steps and measures taken to ensure quality and consistency in a manufacturing process.
Control plans are commonly used in industries such as automotive, aerospace, and electronics.
They include details on the process steps, key characteristics, measurement methods, and acceptable tolerances.
Control plans help identify potential risks, prevent defects, and ensure ...
SMED stands for Single Minute Exchange of Die. It is a lean manufacturing technique used to reduce the time it takes to change over a production process.
SMED is used to minimize downtime during changeovers
It focuses on separating internal and external setup tasks
The goal is to convert as many internal setup tasks to external setup tasks
By reducing setup time, production flexibility and efficiency are improved
Capex stands for capital expenditure, which refers to the funds used by a company to acquire, upgrade, or maintain physical assets.
Capex is an investment made by a company to purchase or improve long-term assets such as buildings, equipment, or technology.
It is different from operational expenses (opex) which are ongoing costs to run the business.
Capex is typically planned and budgeted for in advance.
Examples of capex ...
I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.
posted on 11 Apr 2024
I applied via Naukri.com and was interviewed before Apr 2023. There were 2 interview rounds.
based on 4 reviews
Rating in categories
Junior Engineer
58
salaries
| ₹1.6 L/yr - ₹3.3 L/yr |
Assistant Manager
43
salaries
| ₹4 L/yr - ₹6.2 L/yr |
Quality Engineer
43
salaries
| ₹1.8 L/yr - ₹4.5 L/yr |
Senior Engineer
39
salaries
| ₹2.5 L/yr - ₹5.5 L/yr |
Engineer
29
salaries
| ₹2 L/yr - ₹4.4 L/yr |
Knorr-Bremse
Sanden Vikas
Victora Auto Private Limited
India Japan Lighting