Upload Button Icon Add office photos

Filter interviews by

Rajdeep Buildcon Billing Engineer Interview Questions and Answers

Updated 17 May 2024

Rajdeep Buildcon Billing Engineer Interview Experiences

1 interview found

Billing Engineer Interview Questions & Answers

user image Nilesh Chaudhari

posted on 17 May 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. What is density of Bitumen VG30
  • Ans. 

    Density of Bitumen VG30 is typically around 1.03 g/cm3.

    • Density of Bitumen VG30 is usually around 1.03 g/cm3.

    • The density can vary slightly depending on the specific formulation and temperature.

    • Density is an important factor in determining the quality and performance of bitumen in construction projects.

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Rajdeep Buildcon Billing Engineer interview:
  • AutoCAD
  • Estimation
  • Excel
  • Road Estimator

Interview questions from similar companies

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Can you explain Man day
  • Q2. Can you explain manpower mobilization.
  • Ans. 

    Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.

    • Identifying the required personnel for a project

    • Recruiting and hiring personnel

    • Training and orienting personnel to the project

    • Assigning roles and responsibilities to personnel

    • Managing personnel performance and productivity

    • Ensuring compliance with labor laws and regulations

    • Examples include mobilizing a construc...

  • Answered by AI
  • Q3. How to cost control in project
  • Ans. 

    Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.

    • Create a detailed project budget and stick to it

    • Track expenses regularly and adjust budget as needed

    • Identify and eliminate unnecessary expenses

    • Negotiate with vendors for better pricing

    • Implement cost-saving measures without compromising quality

    • Use project management tools to monitor expenses and progress

    • Reg...

  • Answered by AI
  • Q4. Can you explain how to handle clinent
  • Ans. 

    Handling clients requires effective communication, understanding their needs, and providing timely solutions.

    • Listen actively to their concerns and requirements

    • Communicate clearly and professionally

    • Provide timely updates and solutions

    • Build a strong relationship based on trust and respect

    • Be proactive in identifying and addressing potential issues

    • Ensure customer satisfaction by going above and beyond expectations

  • Answered by AI
  • Q5. Flow chart for manpower mobilization
  • Ans. 

    Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.

    • Identify the need for manpower

    • Plan the recruitment process

    • Source and screen candidates

    • Conduct interviews and assessments

    • Select and hire candidates

    • Provide training and orientation

    • Deploy manpower to required locations

  • Answered by AI
  • Q6. Prepared organisation chat for project handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Please see all questions

I applied via Company Website and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. They asked for previous company work management, work culture, work timing & some technical questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Its not so difficult
Just share your work experience

I applied via Company Website and was interviewed before Jun 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Rates of sub-contractors . Billing process. Reconciliation means and how it is done. Rate Analysis. Key points of your last project. Type of structure that you had seen in your last company. And their deta...
  • Ans. 

    The interview covered topics such as rates of sub-contractors, billing process, reconciliation, rate analysis, previous project experience, and types of structures encountered.

    • Explained the process of obtaining rates from sub-contractors and how they are incorporated into the billing process

    • Discussed the importance of reconciliation in ensuring accurate billing and payment

    • Described the process of rate analysis and how ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Confident and never ever show that u r nervous even if u don't know the answer.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed before Dec 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Control valves on-off valves
Round 3 - Technical 

(1 Question)

  • Q1. PSV pressure regulators

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical study is important . Basics to be perfect

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Dec 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is the IS Code of Concrete
  • Ans. 

    IS Code of Concrete is IS 456:2000

    • IS 456:2000 is the Indian Standard code for Plain and Reinforced Concrete

    • It provides guidelines for the design and construction of concrete structures

    • The code covers various aspects such as materials, mix design, workmanship, and testing

    • It ensures the quality and durability of concrete structures

    • For example, IS 456:2000 specifies the minimum grade of concrete for different types of str

  • Answered by AI
  • Q2. Concrete IS code is IS 456
  • Ans. 

    IS 456 is the Indian Standard code for the design and construction of reinforced concrete structures.

    • IS 456 provides guidelines for the use of reinforced concrete in construction.

    • It covers the general requirements for the design and construction of reinforced concrete structures.

    • The code includes provisions for materials, structural design, durability, and safety.

    • It also provides guidelines for testing and quality cont...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Billing engineer interview is maximum technical questions.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Feb 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What is material reconciliation
  • Ans. 

    Material reconciliation is the process of comparing the actual materials used in a project with the estimated materials to ensure accuracy.

    • Involves comparing the actual quantity of materials used in a project with the estimated quantity

    • Helps in identifying any discrepancies or variances in material usage

    • Ensures that the project stays within budget and timelines

    • Can involve physical counting of materials on site or compa...

  • Answered by AI
  • Q2. What is rolling margin?
  • Ans. 

    Rolling margin is the difference between the selling price and the cost of goods sold, expressed as a percentage.

    • Rolling margin helps in determining the profitability of a product or service.

    • It is calculated by subtracting the cost of goods sold from the selling price, dividing the result by the selling price, and then multiplying by 100.

    • For example, if a product is sold for $100 and the cost of goods sold is $60, the ...

  • Answered by AI
  • Q3. How to calculate bend deduction of ring in BBS?
  • Ans. 

    Bend deduction of a ring in BBS is calculated by subtracting the sum of two bend allowances from the total length of the ring.

    • Calculate the bend allowance for each bend in the ring.

    • Add the bend allowances together to get the total bend allowance.

    • Subtract the total bend allowance from the total length of the ring to get the bend deduction.

  • Answered by AI
Round 3 - Technical 

(1 Question)

  • Q1. What is bend deduction for ring hook
  • Ans. 

    Bend deduction for ring hook is the amount of material that is removed when bending a ring hook.

    • Bend deduction is calculated based on the material thickness and bend radius.

    • It is used to determine the flat pattern length of the material before bending.

    • For ring hooks, the bend deduction is typically around 1.5 times the material thickness.

    • The formula for calculating bend deduction is: Bend Deduction = (π/2) x Bend Radiu

  • Answered by AI
Interview experience
4
Good
Difficulty level
Easy
Process Duration
-
Result
Not Selected

I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Civil engineering related Questions
Round 2 - HR 

(1 Question)

  • Q1. Salary related discussion
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Nov 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Basics of what ur past experience
  • Q2. Basic of shuttering and concreting
Round 3 - Technical 

(1 Question)

  • Q1. What u r past experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Cheapest HRs team in entire Ahemdabad have worked with no. Of company but this company HRs is the worst of them all..
No fixed timing of work. Only top management is supportive down the line everyone is of cheap mentality. Not recommend to join the company as u will regret later. Not even cable to achieve 1 star

Rajdeep Buildcon Interview FAQs

How many rounds are there in Rajdeep Buildcon Billing Engineer interview?
Rajdeep Buildcon interview process usually has 1 rounds. The most common rounds in the Rajdeep Buildcon interview process are Technical.

Tell us how to improve this page.

Rajdeep Buildcon Billing Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Rajdeep Buildcon Billing Engineer Salary
based on 4 salaries
₹4.3 L/yr - ₹7.8 L/yr
11% more than the average Billing Engineer Salary in India
View more details

Rajdeep Buildcon Billing Engineer Reviews and Ratings

based on 3 reviews

4.9/5

Rating in categories

4.9

Skill development

4.9

Work-life balance

4.0

Salary

4.9

Job security

4.9

Company culture

4.9

Promotions

4.9

Work satisfaction

Explore 3 Reviews and Ratings
Junior Engineer Civil
12 salaries
unlock blur

₹2.9 L/yr - ₹4.5 L/yr

Senior Project Manager
9 salaries
unlock blur

₹10 L/yr - ₹14 L/yr

Senior Engineer
8 salaries
unlock blur

₹5.1 L/yr - ₹7.2 L/yr

Junior Quantity Surveyor
7 salaries
unlock blur

₹2.2 L/yr - ₹5 L/yr

Civil Engineer
7 salaries
unlock blur

₹2.4 L/yr - ₹4 L/yr

Explore more salaries
Compare Rajdeep Buildcon with

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.8
Compare

Apco Infratech

3.7
Compare

Saipem

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview