Filter interviews by
Clear (1)
Top trending discussions
I applied via Referral and was interviewed before Dec 2020. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in May 2024. There were 2 interview rounds.
Analysis , graph , dp , recursion
Array, string, graph
posted on 18 Oct 2023
I applied via Newspaper Ad and was interviewed before Oct 2022. There were 3 interview rounds.
Knowledge of the English language, its vocabulary and comprehension. Ability to solve basic mathematical problem, which shows the capacity to use an analytical approach to everyday puzzles.
I applied via Company Website and was interviewed in Nov 2021. There were 4 interview rounds.
I applied via Naukri.com and was interviewed in Mar 2021. There were 4 interview rounds.
To tackle vibrations in axial fans, proper balancing, alignment, and maintenance are essential.
Perform dynamic balancing of the fan blades to minimize vibrations.
Ensure proper alignment of the fan with the motor and the surrounding structure.
Regularly inspect and maintain the fan components to prevent wear and tear.
Use vibration analysis techniques to identify and address any potential issues.
Consider installing vibrat...
We follow a permit system based on the project requirements and local regulations.
Our permit system ensures compliance with safety standards and legal requirements.
We obtain permits for activities such as construction, electrical work, and hazardous material handling.
The specific permit requirements vary depending on the nature of the project and the location.
We work closely with regulatory authorities to ensure timely...
I applied via Company Website and was interviewed before Sep 2021. There were 2 interview rounds.
To identify if a pump is cavitating while working on a DCS panel, you can look for certain indicators.
Monitor the pump's suction pressure. If it is fluctuating or dropping below the specified range, it may indicate cavitation.
Check the pump's discharge pressure. If it is higher than normal, it could be a sign of cavitation.
Listen for unusual noises such as a rattling or grinding sound coming from the pump.
Inspect the p...
To prepare a hydrocarbon vessel for vessel entry, follow these steps:
Ensure the vessel is properly isolated from the process and all sources of energy
Ventilate the vessel to remove any flammable or toxic gases
Perform a thorough inspection of the vessel for any signs of leaks or damage
Implement proper lockout/tagout procedures to prevent accidental activation of equipment
Provide appropriate personal protective equipment...
I applied via Company Website and was interviewed in Jan 2024. There were 3 interview rounds.
My GD topic was renewable energy.
I am a Senior Engineer with 10+ years of experience in designing and implementing complex systems.
10+ years of experience in engineering
Specialize in designing and implementing complex systems
Strong problem-solving skills
Experience with various programming languages such as Java, Python, and C++
Seeking new challenges and growth opportunities at GAIL.
Desire for new challenges and opportunities for growth
Interested in working in a different industry or with different technologies
Attracted to GAIL's reputation and projects
Seeking a more collaborative and innovative work environment
My parents are both retired now, but my father used to work as a civil engineer and my mother was a teacher.
Father worked as a civil engineer
Mother was a teacher
Both are retired now
Yes, I have visited Delhi earlier for a business trip.
Visited Delhi for a business trip
Explored historical sites like Red Fort and Qutub Minar
Enjoyed local cuisine like butter chicken and chaat
I am staying at a hotel in Sector 18, Noida for the interview process.
Staying at a hotel in Sector 18, Noida
Close to the interview location
Comfortable accommodation for the duration of the process
Decoking process involves removing coke deposits from cracking furnace and naphtha circuit to maintain efficiency.
Decoking process involves burning off coke deposits using controlled combustion.
Mechanical decoking involves using high-pressure water jets to remove coke deposits.
Chemical decoking involves using solvents or acids to dissolve coke deposits.
Regular decoking is essential to prevent blockages and maintain fur
Refrigeration cycles are thermodynamic processes used in refrigerators and air conditioners to transfer heat from a low temperature reservoir to a high temperature reservoir.
Refrigeration cycles typically involve four main components: compressor, condenser, expansion valve, and evaporator.
The refrigerant undergoes a cycle of compression, condensation, expansion, and evaporation to absorb heat from the space being coole...
Safety procedures before starting a hot job include obtaining a hot work permit, conducting a hazard assessment, ensuring proper ventilation, and having fire extinguishing equipment nearby.
Obtain a hot work permit before starting any hot job
Conduct a hazard assessment to identify potential risks
Ensure proper ventilation in the work area to prevent buildup of flammable gases
Have fire extinguishing equipment nearby and r
Operation and maintenance procedures are essential for ensuring the smooth functioning of equipment and systems.
Regular inspections and maintenance checks should be conducted to identify and address any issues before they become major problems.
Procedures should be documented and followed consistently to ensure safety and efficiency.
Training should be provided to all personnel involved in the operation and maintenance o...
based on 1 interview
Interview experience
Network Engineer
309
salaries
| ₹0 L/yr - ₹0 L/yr |
Field Engineer
121
salaries
| ₹0 L/yr - ₹0 L/yr |
Graduate Engineer
87
salaries
| ₹0 L/yr - ₹0 L/yr |
Network Engineer L1
58
salaries
| ₹0 L/yr - ₹0 L/yr |
Marketing Executive
45
salaries
| ₹0 L/yr - ₹0 L/yr |
Power Grid Corporation of India
Bharat Sanchar Nigam
Oil And Natural Gas Corporation
NTPC