Upload Button Icon Add office photos

Filter interviews by

Rahul Construction Interview Questions, Process, and Tips

Updated 26 Jun 2024

Top Rahul Construction Interview Questions and Answers

Rahul Construction Interview Experiences

Popular Designations

3 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Fair and was interviewed in Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Types of paints using site
  • Ans. 

    There are various types of paints used on site, including oil-based, water-based, epoxy, and polyurethane paints.

    • Oil-based paints are durable and provide a glossy finish, but take longer to dry and emit strong fumes.

    • Water-based paints are easy to clean up and dry quickly, but may not be as durable as oil-based paints.

    • Epoxy paints are commonly used for industrial applications and provide a hard, durable finish.

    • Polyureth...

  • Answered by AI
  • Q2. Mixing ratio of paints
  • Ans. 

    Mixing ratio of paints is the proportion of different colors of paint that are mixed together to achieve a desired color.

    • The mixing ratio of paints varies depending on the type of paint being used.

    • It is important to follow the manufacturer's instructions for the correct mixing ratio.

    • For example, a common mixing ratio for latex paint is 8 parts paint to 1 part water.

    • Another example is a mixing ratio of 2:1 for automotiv...

  • Answered by AI
  • Q3. Dft, wft, Relative humidity, dew point temperature, surface temperature, Atmosphere temperature.

Interview Preparation Tips

Interview preparation tips for other job seekers - Study about paints mixing ratio, duties and responsibilities of panting supervisor, procedure blasting . Prepare well

Painting Supervisor Interview Questions asked at other Companies

Q1. What is the blasting nozzle size
View answer (3)
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is Real Number
  • Ans. 

    Real numbers are numbers that can be found on the number line, including integers, fractions, and irrational numbers.

    • Real numbers can be positive, negative, or zero.

    • They include integers like -3, fractions like 1/2, and irrational numbers like √2.

    • Real numbers can be represented on a number line.

    • They can be used in mathematical operations like addition, subtraction, multiplication, and division.

  • Answered by AI
  • Q2. How many Integer
  • Ans. 

    The question is unclear and incomplete, as it is missing context or details.

    • Ask for clarification on what is being asked about integers

    • Request more information on the specific topic or problem related to integers

    • Provide examples of different types of integers to better understand the question

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - IIT engineering

Engineering Student Interview Questions asked at other Companies

Q1. What are the main unit processes involved in water treatment?
View answer (2)

Interview Questions & Answers

user image Anonymous

posted on 19 May 2024

Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Indeed and was interviewed in Nov 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

Easy aptitude basic questions are enough for preparation

Round 2 - Coding Test 

C++ and Data structured and algorithm

Interview Preparation Tips

Interview preparation tips for other job seekers - Stay confident in interview

Interview questions from similar companies

I applied via Recruitment Consultant and was interviewed before Aug 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Machinery maintenance Dpr maintenance,local purchasing,

Interview Preparation Tips

Interview preparation tips for other job seekers - Nice,good and teritical intrew done and completed

Interview Questionnaire 

3 Questions

  • Q1. What is android architecture stack?
  • Q2. What is AIDL?
  • Ans. 

    AIDL stands for Android Interface Definition Language, used for inter-process communication in Android.

    • AIDL is used to define the interface between client and service in Android.

    • It allows communication between different processes in Android.

    • AIDL is used to pass complex data types between processes.

    • AIDL is similar to Remote Procedure Call (RPC) in other programming languages.

    • Example: AIDL is used in Android to implement...

  • Answered by AI
  • Q3. What is hash set and hash map
  • Ans. 

    Hash set and hash map are data structures used to store key-value pairs for efficient retrieval.

    • Hash set stores unique values without any specific order.

    • Hash map stores key-value pairs and allows fast retrieval of values based on keys.

    • Both use hashing to map keys to their corresponding values.

    • In Java, HashSet and HashMap are implementations of these data structures.

  • Answered by AI

Skills evaluated in this interview

I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Load distribution under rigid and flexible footings,water tank design, steel foundation design
  • Q2. Mix design of concrete, btech project
  • Ans. 

    Mix design of concrete and BTech project

    • Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete

    • Factors like strength, workability, durability, and cost are considered while designing the mix

    • BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design

    • Examples of BTech projects...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - be well prepared with basics and if you are already experienced, be prepared with site knowledge

Interview Questionnaire 

3 Questions

  • Q1. How many time u take any update shuttering system?
  • Ans. 

    The question is unclear and lacks context.

    • Please provide more information about the 'update shuttering system'.

    • Specify the time frame for the updates.

    • Clarify the purpose or objective of the updates.

    • Provide any relevant examples or scenarios.

  • Answered by AI
  • Q2. Why u want to work as a execution engineer? Why not any special team such as formwork team,or quality team?
  • Ans. 

    I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.

    • As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.

    • I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.

    • While working on a formwork or quality team would be valuable experi...

  • Answered by AI
  • Q3. As contractor farm Engineer in RCC which is most important? 1) Reinforcements 2)Formwork 3)Concrete And why?
  • Ans. 

    Concrete is the most important as it provides the strength and durability to the structure.

    • Concrete is the backbone of any RCC structure.

    • It provides the strength and durability to the structure.

    • Reinforcements and formwork are important too, but without concrete, they are useless.

    • Proper mix design and curing of concrete are crucial for the longevity of the structure.

  • Answered by AI

I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Be clear on salary negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Say confidently what ever it is..

I applied via Recruitment Consultant and was interviewed before Nov 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Three people seat and asked Just simple technical questions frequently from civil engineering in hindi & English and watched the confidence level also. Some difficult questions is also there but they have ...
  • Q2. Forget now because long years ago it has been done.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident & should have technical knowledge.

I applied via Company Website and was interviewed before Feb 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

About experience and scope of work current organization and civil engineering related questions.

Round 3 - HR 

(2 Questions)

  • Q1. What are your salary expectations?
  • Q2. Why are you looking for a change?

Interview Preparation Tips

Interview preparation tips for other job seekers - Deep knowledge of civil engineering field management and quality .

Rahul Construction Interview FAQs

How many rounds are there in Rahul Construction interview?
Rahul Construction interview process usually has 1-2 rounds. The most common rounds in the Rahul Construction interview process are Technical, Resume Shortlist and Aptitude Test.
What are the top questions asked in Rahul Construction interview?

Some of the top questions asked at the Rahul Construction interview -

  1. Types of paints using s...read more
  2. Mixing ratio of pai...read more
  3. What is Real Num...read more

Tell us how to improve this page.

Rahul Construction Interview Process

based on 2 interviews

Interview experience

3
  
Average
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 763 Interviews
Tata Projects Interview Questions
4.2
 • 457 Interviews
KEC International Interview Questions
4.0
 • 316 Interviews
Tata Technologies Interview Questions
3.6
 • 266 Interviews
TCE Interview Questions
3.8
 • 251 Interviews
View all

Rahul Construction Reviews and Ratings

based on 31 reviews

3.9/5

Rating in categories

4.0

Skill development

3.9

Work-life balance

3.7

Salary

3.6

Job security

3.7

Company culture

3.4

Promotions

3.7

Work satisfaction

Explore 31 Reviews and Ratings
Site Engineer
9 salaries
unlock blur

₹1.8 L/yr - ₹3 L/yr

Civil Site Engineer
8 salaries
unlock blur

₹1.5 L/yr - ₹4.8 L/yr

Accountant
7 salaries
unlock blur

₹1.6 L/yr - ₹3.6 L/yr

Junior Engineer Civil
6 salaries
unlock blur

₹2 L/yr - ₹3.1 L/yr

Senior Engineer
5 salaries
unlock blur

₹4.2 L/yr - ₹5.5 L/yr

Explore more salaries
Compare Rahul Construction with

Larsen & Toubro Limited

3.9
Compare

Tata Technologies

3.6
Compare

Tata Projects

4.2
Compare

L&T Construction

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview