Filter interviews by
Waterproofing methods include membrane waterproofing, cementitious waterproofing, crystalline waterproofing, and bituminous waterproofing.
Membrane waterproofing involves the use of a thin layer of waterproof material, such as rubber or PVC, applied to the surface.
Cementitious waterproofing uses a cement-based mixture that forms a barrier against water penetration.
Crystalline waterproofing involves the application of ch...
SRC concrete contains supplementary cementitious materials that enhance its durability and resistance to chemical attack.
SRC stands for Sulphate Resistant Cement
SRC concrete is specifically designed to resist the damaging effects of sulphate attack
Non-SRC concrete does not contain any additional materials to enhance its resistance to sulphate attack
SRC concrete is commonly used in marine structures, wastewater treatmen...
Fiber concrete is used to enhance the strength, durability, and crack resistance of concrete structures.
Fiber concrete improves the tensile strength of concrete, making it more resistant to cracking and shrinkage.
It enhances the durability of concrete by reducing the permeability and increasing resistance to chemical attack.
Fiber concrete can be used in various applications such as road pavements, industrial floors, pr...
Concrete plasticizer is a chemical admixture used to improve the workability and durability of concrete.
Concrete plasticizers are added to concrete mixtures to reduce water content and increase flowability.
They improve the strength and durability of concrete by reducing the amount of water needed for proper hydration.
Concrete plasticizers can also enhance the workability of concrete, making it easier to pour, place, an...
I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.
To conduct a slump test, fill a metal cone with concrete, compact it, remove the cone, and measure the slump.
Clean the cone and moisten it with water.
Fill the cone with concrete in three layers, compacting each layer with a rod.
Remove the cone and place it next to the slump.
Measure the difference in height between the top of the cone and the highest point of the slump.
Repeat the test at least twice and take the average
Minimum cement content for M25 Grade is 300 kg/m³.
M25 grade concrete has a minimum compressive strength of 25 MPa.
The water-cement ratio should not exceed 0.50.
The cement content can vary based on factors such as aggregate size, shape, and grading.
The cement content should be adjusted based on the results of trial mixes.
I expect a competitive salary based on industry standards and my experience.
I have researched the industry standards for QA QC Engineer salaries
I have taken into account my experience and skills
I am open to negotiation based on the specific job responsibilities and benefits package
I am looking for a fair and competitive salary that reflects my value to the company
I applied via Recruitment Consulltant and was interviewed in Mar 2022. There was 1 interview round.
Compressor troubleshooting involves identifying and resolving issues with the compressor in a system.
Check for leaks in the system
Inspect the compressor for damage or wear
Check the electrical connections and wiring
Monitor the pressure and temperature readings
Clean or replace air filters
Check the oil level and quality
Inspect the belts and pulleys for wear or damage
I applied via Campus Placement and was interviewed in Apr 2024. There was 1 interview round.
I am from a small town in the Midwest and I am passionate about environmental conservation.
I grew up in a close-knit community in the Midwest
I have always been interested in protecting the environment
I enjoy outdoor activities like hiking and gardening
I have a Bachelor's degree in Computer Science from XYZ University.
Bachelor's degree in Computer Science
Graduated from XYZ University
Specialized in software development
posted on 15 Jul 2024
I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.
posted on 9 Apr 2024
I applied via Naukri.com and was interviewed in Oct 2023. There was 1 interview round.
I applied via Approached by Company and was interviewed in Jan 2024. There were 2 interview rounds.
The shape of project progress curve is typically an S-curve.
The project progress curve starts off slow as the project is initiated and planned.
It then accelerates as work is being executed and completed.
Finally, the curve levels off as the project nears completion and final tasks are finished.
The S-curve represents the typical pattern of project progress over time.
The expected salary for a Planning Manager position varies depending on factors such as location, company size, and level of experience.
Research typical salaries for Planning Managers in your area to determine a reasonable range
Consider your level of experience and qualifications when negotiating salary
Factor in benefits, bonuses, and other perks when evaluating a job offer
Yes, I have extensive experience using MS Project for project planning and management.
I have used MS Project to create project schedules, track progress, and allocate resources.
I am proficient in setting up dependencies, milestones, and critical paths in MS Project.
I have experience generating reports and analyzing data in MS Project.
I have used MS Project to collaborate with team members and stakeholders on project ti
posted on 2 Aug 2024
I applied via Company Website
The company is currently in a stable financial position with ongoing projects and a strong reputation in the industry.
Company has a strong financial position
Ongoing projects are in progress
Company has a good reputation in the industry
Employee growth refers to the development and advancement of an individual within their career.
Employee growth involves acquiring new skills and knowledge
It includes taking on more responsibilities and challenges
Career progression and promotions are indicators of employee growth
Action points at site level refer to specific tasks or activities that need to be completed on the construction site.
Action points are typically identified during site inspections or progress meetings.
They can include tasks such as resolving design issues, coordinating with subcontractors, or ensuring compliance with regulations.
Examples of action points could be revising drawings to address conflicts, obtaining necess...
Civil Foreman
6
salaries
| ₹9.6 L/yr - ₹12 L/yr |
Civil Engineer
4
salaries
| ₹15 L/yr - ₹38.4 L/yr |
Electrician
3
salaries
| ₹0.4 L/yr - ₹4 L/yr |
Site Manager
3
salaries
| ₹75 L/yr - ₹97 L/yr |
Lead Mechanical Engineer
3
salaries
| ₹45.6 L/yr - ₹45.6 L/yr |
The Louis Berger Group
Nesma & Partners
El Seif Engineering Contracting
Perkins