Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Pride Group Team. If you also belong to the team, you can get access from here

Pride Group Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Pride Group QS Engineer Interview Questions and Answers

Updated 30 Aug 2021

Pride Group QS Engineer Interview Experiences

1 interview found

QS Engineer Interview Questions & Answers

user image Anonymous

posted on 30 Aug 2021

I applied via Naukri.com and was interviewed before Aug 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. 1)What is your present job roles & responsibilities. 2)Objective oriented technical exam conducted. 3) What is your strengths & weakness. 4) Rate analysis 5) Are you capable to handle 2-3 projects.

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic technical questions will be asked.

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Technical Civil Execution engineering with finishing RCC experience
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

Written paper as per site and codes

Round 2 - Group Discussion 

It’s about Quality and execution with VP and audit team

Round 3 - HR 

(2 Questions)

  • Q1. Salary discussion
  • Q2. Joining procedures and company policy
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Aug 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Technical questions
Round 3 - Technical 

(1 Question)

  • Q1. Technical questions
Round 4 - HR 

(1 Question)

  • Q1. Salary discussion

I applied via Walk-in and was interviewed before Dec 2019. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About technical related construction work etc

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was technical related construction work but it's my first interview I face very problem but interview are very well I selected

I applied via Company Website and was interviewed before Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Construction work relativ , Drawing relative, Execution Work ,steel work, shutting work, planning, ke relative questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Official website and HR department share Post office site par and linkdin par

I applied via Naukri.com and was interviewed before Oct 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Deduction in shuttering criteria
  • Ans. 

    Deduction in shuttering criteria refers to the reduction in the amount of shuttering material used in construction.

    • Deduction in shuttering criteria is done to reduce the cost of construction.

    • It is also done to reduce the time taken for construction.

    • The deduction is usually done based on the strength of the concrete being used.

    • For example, if the concrete strength is high, less shuttering material is required.

    • The deduct...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepared yourself for interview to get selection
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jun 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. How is stone/Tile flooring /Cladding is measured
  • Ans. 

    Stone/Tile flooring/Cladding is measured in square meters or square feet depending on the unit of measurement used.

    • Measure the length and width of the area to be covered with stone/tile flooring/cladding

    • Multiply the length by the width to get the total square meters or square feet

    • Account for any cuts or wastage in the calculation

    • Consider the pattern or design of the flooring/cladding when measuring

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't join their Site billing profile.They suck at their system and there is nothing such Client approach towards the project.It's kind of In-house and chosen vendors for their projects are so bad that site billing will suffer and you will be blamed.
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Concrete pouring method
  • Ans. 

    Concrete pouring method involves the process of placing and compacting concrete into a formwork to create a solid structure.

    • Ensure formwork is properly prepared and secured before pouring concrete

    • Use appropriate equipment such as concrete pumps or buckets for pouring

    • Monitor concrete flow and consistency to avoid segregation or honeycombing

    • Properly compact the concrete to remove air voids and ensure strength

    • Allow suffic...

  • Answered by AI
  • Q2. Shuttering of columns
  • Ans. 

    Shuttering of columns is the process of creating temporary formwork to support concrete until it sets.

    • Shuttering is usually made of plywood, timber, or steel.

    • It is important to ensure the shuttering is properly supported and aligned before pouring concrete.

    • The shuttering should be removed after the concrete has set to the required strength.

    • Properly designed and constructed shuttering helps in achieving a smooth and uni

  • Answered by AI
  • Q3. Reinforcement checking checklist points
  • Q4. Tiles placing method
  • Ans. 

    Tiles can be placed using various methods such as grid layout, random pattern, or specific design layout.

    • Tiles can be placed in a grid layout for a uniform and organized look.

    • Random pattern placement can create a more eclectic and unique design.

    • Specific design layout involves placing tiles according to a pre-determined pattern or design.

    • Consider factors like tile size, shape, color, and grout spacing when deciding on t

  • Answered by AI
  • Q5. Flooring method for stone work
  • Ans. 

    The flooring method for stone work typically involves using mortar or adhesive to secure the stones in place.

    • Prepare the subfloor by ensuring it is clean, level, and dry

    • Apply mortar or adhesive to the back of each stone before placing it on the subfloor

    • Use spacers to maintain consistent spacing between stones

    • Allow the mortar or adhesive to dry completely before grouting the joints

    • Seal the finished stone floor to protec

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just jack is required
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Formula for Unit weight of steel rebar
  • Ans. 

    Unit weight of steel rebar is calculated using a specific formula based on the dimensions of the rebar.

    • Unit weight of steel rebar = (D^2/162.2) * L, where D is the diameter of the rebar in inches and L is the length of the rebar in feet.

    • The formula is derived from the weight of a steel bar per foot, which is 3.4 pounds for a rebar with a diameter of one inch.

    • For example, a steel rebar with a diameter of 0.5 inches and ...

  • Answered by AI

Tell us how to improve this page.

Interview Questions from Similar Companies

Pittie Group Interview Questions
2.6
 • 17 Interviews
Ambience Group Interview Questions
3.4
 • 16 Interviews
91springboard Interview Questions
3.7
 • 11 Interviews
Reliable Spaces Interview Questions
2.8
 • 10 Interviews
Ashar group Interview Questions
3.5
 • 9 Interviews
Migsun Group Interview Questions
3.0
 • 7 Interviews
View all
Sales Manager
10 salaries
unlock blur

₹5.6 L/yr - ₹9.6 L/yr

Assistant Manager
9 salaries
unlock blur

₹5.1 L/yr - ₹11.3 L/yr

Technical Facility Manager
7 salaries
unlock blur

₹7 L/yr - ₹7 L/yr

Sales Executive
7 salaries
unlock blur

₹3 L/yr - ₹7 L/yr

Senior Engineer
7 salaries
unlock blur

₹6.5 L/yr - ₹8.5 L/yr

Explore more salaries
Compare Pride Group with

Signature Global

4.0
Compare

Pittie Group

2.6
Compare

Advance India Projects

3.6
Compare

Vestian Global Workplace Services

3.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview