posted on 7 Dec 2017
I applied via Company Website and was interviewed in Oct 2017. There were 3 interview rounds.
To control production and manage project time, a planning engineer must focus on effective planning, monitoring progress, resource allocation, and risk management.
Develop a detailed project plan with clear objectives, milestones, and deliverables.
Break down the project into smaller tasks and estimate the time required for each task.
Allocate resources efficiently, considering availability, skills, and dependencies.
Monit...
posted on 22 Aug 2024
I applied via Company Website and was interviewed in Jul 2024. There was 1 interview round.
Project planning process involves defining project scope, creating a schedule, allocating resources, and monitoring progress.
Define project scope and objectives
Create a project schedule with milestones and deadlines
Allocate resources such as budget, manpower, and materials
Monitor progress and make adjustments as needed
Communicate with stakeholders regularly
I applied via Company Website and was interviewed in Dec 2023. There was 1 interview round.
A transformer is an electrical device that transfers electrical energy between two or more circuits through electromagnetic induction.
Transformers work on the principle of electromagnetic induction
They consist of two coils of wire, known as the primary and secondary windings
The primary winding is connected to the input voltage source, while the secondary winding is connected to the output load
The transformer changes th...
A resistor is an electronic component that resists the flow of electrical current.
Resistors are used to control the amount of current flowing in a circuit.
The resistance of a resistor is measured in ohms (Ω).
One way to measure a resistor without a multimeter is by using a simple circuit with a known voltage source and an ammeter to measure the current flowing through the resistor.
Another method is to use a resistor col...
I applied via Company Website and was interviewed before Jan 2023. There were 2 interview rounds.
Free float is the amount of time a task can be delayed without affecting the project's critical path. Total float is the total amount of time a task can be delayed without delaying the project's completion.
Free float is specific to an individual task, while total float is applicable to the entire project.
Free float is calculated by subtracting the early start date of a task from the early finish date of its successor t...
Critical path is the longest sequence of activities in a project that determines the project's overall duration.
Critical path consists of activities that have zero slack or float time.
Any delay in activities on the critical path will directly impact the project's completion time.
Activities on the critical path must be closely monitored and managed to ensure timely project completion.
Critical path analysis helps in iden...
Look ahead is a planning technique to anticipate future activities. In P6, the 1-month look ahead can be found using filters and layouts.
Look ahead is a proactive planning approach to identify and prepare for upcoming activities.
In P6, the 1-month look ahead can be created by applying filters and layouts to the project schedule.
Filters can be set to display activities that are scheduled within the next month.
Layouts ca...
Global change refers to the long-term alterations in the Earth's systems and processes due to human activities and natural factors.
Global change encompasses various interconnected phenomena such as climate change, biodiversity loss, deforestation, and pollution.
It involves both anthropogenic (human-induced) factors like greenhouse gas emissions and natural factors like volcanic eruptions.
Global change has wide-ranging ...
The productivity rate of a welder refers to the amount of work they can complete in a given time period.
Productivity rate is measured in units of work per hour or per day.
Factors that can affect a welder's productivity rate include their skill level, the complexity of the welding task, and the availability of necessary equipment.
For example, an experienced welder may have a higher productivity rate than a novice welder...
Asked to prepare a schedule of a building
posted on 6 Feb 2024
I applied via Referral and was interviewed in Aug 2023. There were 2 interview rounds.
posted on 27 Aug 2023
I applied via Recruitment Consulltant and was interviewed in Jul 2023. There were 3 interview rounds.
As on production planning control
Implementing lean manufacturing principles, optimizing production processes, and reducing material waste can help save company wastage.
Implement lean manufacturing principles to reduce waste in production processes
Optimize production schedules to minimize downtime and maximize efficiency
Reduce material waste by implementing recycling and reusing strategies
Regularly review and analyze production data to identify areas o...
posted on 10 Feb 2023
I applied via Approached by Company and was interviewed in Aug 2022. There were 2 interview rounds.
The code of fabrication and installation involves a sequence of steps from fabrication to dispatch and erection at the site.
The code of fabrication and installation outlines the standards and procedures for the entire process.
The fabrication sequence involves cutting, welding, and assembling the components according to the design specifications.
The final dispatch involves packaging and transportation of the fabricated ...
posted on 5 Apr 2024
posted on 5 Feb 2023
I applied via Referral and was interviewed in Jan 2023. There were 2 interview rounds.
I have a Bachelor's degree in Civil Engineering and a Master's degree in Construction Management.
Bachelor's degree in Civil Engineering
Master's degree in Construction Management
Experience in planning and scheduling
Proficient in using planning software such as Primavera P6
Strong analytical and problem-solving skills
I have 5 years of experience in planning and billing engineering.
I worked for XYZ Company for 3 years as a Planning Engineer.
Then I joined ABC Company as a Billing Engineer and worked there for 2 years.
During my tenure, I gained expertise in project planning, cost estimation, and budgeting.
I also have experience in using various software tools like Primavera, MS Project, and SAP.
I have successfully completed several pr
I have 7.5 years of experience in Planning & Billing Engineering.
During my 7.5 years of experience, I have gained expertise in project planning, scheduling, and cost estimation.
I have worked on various projects, including construction, infrastructure, and industrial projects.
I have experience in using software such as Primavera P6, MS Project, and Excel for project planning and scheduling.
I have also worked on project ...