Filter interviews by
I was interviewed before Aug 2020.
A project execution plan outlines the steps and resources needed to complete a project.
Define project scope and objectives
Identify project stakeholders and their roles
Create a project schedule and timeline
Allocate resources and budget
Establish communication and reporting protocols
Monitor and evaluate project progress
Adjust plan as needed
Example: Building a new office building
Top trending discussions
posted on 16 May 2024
The Vogele Super-1800 and SP-1600 pavers are equipped with a Deutz engine.
Both pavers are powered by Deutz engines.
The Deutz engine provides reliable performance and efficiency.
Regular maintenance and servicing of the Deutz engine is essential for optimal operation.
Volvo Excavator 480 is a heavy-duty machine used for excavation work, with the numeric representing its model number and diesel consumption rate being an important factor for operational costs.
The numeric '480' in Volvo Excavator 480 represents the model number of the machine.
The diesel consumption rate of Volvo Excavator 480 can vary depending on factors such as load, operating conditions, and maintenance.
Monitoring a...
posted on 18 Apr 2024
I applied via Recruitment Consulltant and was interviewed in Oct 2023. There was 1 interview round.
The type of industry I have experience in includes construction, manufacturing, and technology.
Experience in negotiating contracts in construction industry for building projects
Familiarity with manufacturing industry contracts for production and supply agreements
Knowledge of technology industry contracts for software licensing and service agreements
Budget delegation of approval refers to the process of assigning authority to approve budgets to specific individuals or positions.
Budget delegation of approval helps streamline decision-making processes within an organization.
It ensures that budgets are approved by individuals with the appropriate level of authority and expertise.
Examples of budget delegation of approval include assigning budget approval authority to ...
I applied via campus placement at Annasaheb Dange College of Engineering and Technology, Ashta and was interviewed in Aug 2023. There were 4 interview rounds.
Normal level questions
Designed a solar-powered irrigation system for a rural community
Researched solar panel efficiency and water pump technology
Created CAD models for the system layout
Tested prototype in field conditions
Collaborated with local community for feedback and adjustments
I applied via Approached by Company and was interviewed in Feb 2023. There were 3 interview rounds.
posted on 5 Oct 2022
I applied via Walk-in and was interviewed in Sep 2022. There were 2 interview rounds.
posted on 29 Aug 2022
I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.
based on 17 reviews
Rating in categories
Assistant Manager
5
salaries
| ₹5 L/yr - ₹6.6 L/yr |
School Principal
5
salaries
| ₹9.6 L/yr - ₹12 L/yr |
Project Manager
4
salaries
| ₹11 L/yr - ₹16 L/yr |
Accounts Manager
4
salaries
| ₹5 L/yr - ₹5.4 L/yr |
Senior Production Manager
4
salaries
| ₹8.1 L/yr - ₹12.3 L/yr |
J K Fenner
Saudi Binladin Group
Bahwan Engineering
Descon Engineering