To row solve sub contractors billing, ensure accurate tracking of work completed, materials used, and hours worked.
Maintain detailed records of work completed by each subcontractor
Verify invoices against work completed and materials used
Track hours worked by subcontractors to ensure accurate billing
Address any discrepancies or issues promptly to avoid delays in payment
posted on 5 Jul 2024
A Single Line Diagram (SLD) of a Substation shows how electrical power is distributed within the substation.
Include main components like transformers, circuit breakers, disconnect switches, etc.
Show the flow of electricity from the incoming transmission lines to the outgoing distribution lines.
Label all components and indicate their ratings and connections.
Use standard symbols and conventions for clarity.
Consider safet
A room lighting fixture with a modern design and energy-efficient LED bulbs.
Consider the size and shape of the room when designing the fixture
Choose energy-efficient lighting options such as LED bulbs
Incorporate modern design elements for a sleek look
The question is asking the candidate to draw a connection diagram for a specific electrical system.
Start by identifying all the components of the electrical system
Draw a clear and organized diagram showing how each component is connected
Label each connection and component for clarity
Ensure the diagram follows standard electrical symbols and conventions
Double-check the diagram for accuracy and completeness
I applied via LinkedIn and was interviewed in May 2023. There were 5 interview rounds.
Technology development based on question
I applied via Company Website and was interviewed in Feb 2023. There were 3 interview rounds.
I have 5 years of experience as a Field Engineer in the telecommunications industry.
Managed and maintained network infrastructure for multiple clients
Performed site surveys and installations of equipment
Troubleshot and resolved network issues
Provided technical support and training to customers
Collaborated with cross-functional teams to ensure project success
posted on 30 Apr 2023
I applied via Naukri.com and was interviewed in Oct 2022. There were 2 interview rounds.
The frequency of cube casting and testing per cubic meter varies depending on the project requirements and specifications.
The frequency of cube casting and testing is determined by the project specifications and quality control requirements.
In general, cube casting and testing may be done at regular intervals during the construction process.
For example, in a large construction project, cube casting and testing may be d...
Rate analysis of each item of construction involves determining the cost of materials, labor, and equipment for each construction activity.
Rate analysis helps in estimating the total cost of a construction project.
It involves breaking down the project into various activities and determining the cost of each activity.
Factors considered in rate analysis include material costs, labor costs, equipment costs, and overhead c...
I applied via Campus Placement and was interviewed before Dec 2023. There were 2 interview rounds.
It was in campus interview. aptitude test difficulty low
I applied via Walk-in and was interviewed in Sep 2022. There were 2 interview rounds.
I applied via Campus Placement and was interviewed before Mar 2022. There were 2 interview rounds.
I applied via Company Website and was interviewed before Feb 2021. There were 2 interview rounds.
Senior Engineer
487
salaries
| ₹3 L/yr - ₹8.4 L/yr |
Assistant Manager
338
salaries
| ₹4 L/yr - ₹11 L/yr |
Engineer
255
salaries
| ₹2 L/yr - ₹6.9 L/yr |
Mechanical Engineer
242
salaries
| ₹2 L/yr - ₹7 L/yr |
Electrical Engineer
213
salaries
| ₹1.7 L/yr - ₹7.5 L/yr |
Thermax Limited
BGR Energy Systems
Larsen & Toubro Limited
Kalpataru Projects International