I applied via Company Website and was interviewed in Jun 2024. There was 1 interview round.
Martensite formation can be achieved through rapid cooling of austenite.
Martensite formation occurs when austenite is rapidly cooled below the martensite start temperature.
The cooling rate must be fast enough to prevent the diffusion of carbon atoms, allowing them to become trapped in the crystal lattice.
Quenching in water, oil, or air can be used to achieve the necessary cooling rate.
Higher carbon content in the steel...
Carburizing is a cleaner process compared to carbonitriding.
Carburizing involves introducing carbon into the surface of a metal to increase its hardness, while carbonitriding introduces both carbon and nitrogen.
Carburizing typically requires fewer process steps and is more cost-effective.
Carbonitriding can lead to the formation of more complex compounds, which may require additional post-treatment processes.
Carburizing...
Top trending discussions
posted on 20 Nov 2021
I applied via Naukri.com and was interviewed in May 2021. There was 1 interview round.
posted on 3 Feb 2022
I applied via Walk-in and was interviewed before Feb 2021. There was 1 interview round.
I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.
posted on 20 Jan 2024
I applied via Approached by Company and was interviewed before Jan 2023. There was 1 interview round.
I applied via Company Website and was interviewed before May 2021. There was 1 interview round.
posted on 19 Feb 2024
I applied via Referral and was interviewed in Aug 2023. There were 2 interview rounds.
posted on 28 Mar 2024
I applied via Company Website and was interviewed before Mar 2023. There was 1 interview round.
The process of erection of duct involves planning, fabrication, transportation, installation, and testing.
Planning involves determining the layout, size, and material of the ducts.
Fabrication includes cutting, bending, and assembling the ducts according to the design.
Transportation is the movement of fabricated ducts to the installation site.
Installation involves positioning and connecting the ducts to the HVAC system.
...
The code followed for the fabrication of steel structure materials is typically based on industry standards and regulations.
The fabrication of steel structures is typically governed by codes such as the American Institute of Steel Construction (AISC) Code of Standard Practice.
Other codes that may be followed include the American Welding Society (AWS) D1.1 Structural Welding Code - Steel.
Fabrication processes must also ...
The erection sequence of a steel structure involves planning and executing the assembly of components in a specific order to ensure safety and stability.
Start by assembling the foundation and anchor bolts.
Next, erect the columns and connect them to the foundation.
Then, install the beams and trusses to form the framework.
After that, add the bracing and diagonal members for stability.
Finally, complete the structure by ad...
posted on 16 Oct 2024
The erection sequence of ESP involves several steps to ensure proper installation and functioning.
1. Prepare the foundation for the ESP unit.
2. Install the support structure for the ESP.
3. Assemble the ESP components such as the casing, electrodes, and rapping system.
4. Connect the necessary electrical and mechanical components.
5. Test the ESP system for proper functioning before commissioning.
6. Commission the ESP sys...
Various ESP materials suppliers include Schlumberger, Baker Hughes, Halliburton, Weatherford, and National Oilwell Varco.
Schlumberger
Baker Hughes
Halliburton
Weatherford
National Oilwell Varco
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Quality Engineer
24
salaries
| ₹1.3 L/yr - ₹4.6 L/yr |
Production Engineer
22
salaries
| ₹1.5 L/yr - ₹3.6 L/yr |
Executive Accountant
15
salaries
| ₹2.2 L/yr - ₹3.4 L/yr |
Quality Inspector
12
salaries
| ₹1.5 L/yr - ₹4 L/yr |
Production Supervisor
9
salaries
| ₹0.2 L/yr - ₹3.5 L/yr |
Thermax Limited
ABB
Tractors and Farm Equipment
Isgec Heavy Engineering