I applied via Approached by Company and was interviewed in Jan 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Self introducion
  • Q2. Stages of engineering
  • Ans. 

    Stages of engineering involve research, design, development, testing, and implementation of products or processes.

    • Research: Gathering information and analyzing data to understand the problem or opportunity.

    • Design: Creating a plan or blueprint for the product or process.

    • Development: Building and testing prototypes based on the design.

    • Testing: Evaluating the performance and functionality of the product or process.

    • Impleme...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. All engineering documents
  • Q2. Interdiscipline interaction

Process Engineer Interview Questions asked at other Companies

Q1. What is APQP and where is it used. And how many phases does it have? and fmea which phase are performed?
View answer (2)

Procurement Manager Interview Questions & Answers

user image Bhavesh Bhojak

posted on 15 Jun 2024

Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
Not Selected
Round 1 - HR 

(1 Question)

  • Q1. Are you willing to relocate

Interview Preparation Tips

Interview preparation tips for other job seekers - Try to get the CTC clearly accepted. In the offer letter they write max 10% increments so you'll be bound

Procurement Manager Interview Questions asked at other Companies

Q1. What categories do you handle? Tell briefly about your strategies for sourcing and contracting activities.
View answer (2)

SPPID Design engineer Interview Questions & Answers

user image Anonymous

posted on 16 Jun 2022

I applied via Referral and was interviewed in May 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. TECHNICAL QUESTION ABOUT TO SPPID TOOL
  • Q2. OPC'S, GLOBAL VALIDATION, UPTODATE,EDE
Round 3 - HR 

(1 Question)

  • Q1. PACKAGE AND PAST COMPANY DESCCUSSION

Interview Preparation Tips

Topics to prepare for PM Group SPPID Design engineer interview:
  • opc's, Duplications
Interview preparation tips for other job seekers - Need to know basic details of the SPPID, GIVE THE INTERVIEW WITH CONFIDENT

Sales Manager Interview Questions & Answers

user image Anonymous

posted on 20 Apr 2023

Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Psychological questions which relate to commercial business.
  • Q2. Previous company achievements and what you learned from your organization.

Interview Preparation Tips

Interview preparation tips for other job seekers - Search basic knowledge about Poultry Pharmaceutical medicine and Poultry disease.

Sales Manager Interview Questions asked at other Companies

Q1. If you're in Cold areas like Kashmir or Himachal Pradesh. & You have to sell an AC which is having only Cold option. How would you do that?
View answer (15)

PM Group interview questions for popular designations

 Process Engineer

 (1)

 Procurement Manager

 (1)

 Sales Manager

 (1)

Jobs at PM Group

View all

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected
Round 1 - Aptitude Test 

Quantitative reasoning

Round 2 - One-on-one 

(5 Questions)

  • Q1. About yourself and past experiences.
  • Q2. Managerial round
  • Q3. About company information
  • Q4. About yourself and extracurricular activities
  • Q5. See yourself in the next 5 yrs

Interview Preparation Tips

Interview preparation tips for other job seekers - be prepared for questions.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Not Selected
Round 1 - Technical 

(2 Questions)

  • Q1. What is the output voltage of an AAAC Rabbit conductor?
  • Ans. 

    The output voltage of an AAAC Rabbit conductor is typically around 600 volts.

    • The output voltage of an AAAC Rabbit conductor is usually around 600 volts.

    • The exact output voltage may vary depending on the specific application and conditions.

    • It is important to consult the manufacturer's specifications for accurate information.

  • Answered by AI
  • Q2. What is your execution work plan?
  • Ans. 

    My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.

    • Set clear goals and objectives for the project

    • Create a detailed timeline with milestones and deadlines

    • Assign tasks to team members based on their strengths and expertise

    • Regularly monitor progress and make adjustments as needed

    • Communicate effectively with team members and stakeholders

    • Ut...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Normal interview the materials and workmanship
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. What is job safety analysis
  • Ans. 

    Job safety analysis is a process of identifying potential hazards in a job task and implementing controls to mitigate risks.

    • Involves breaking down a job task into steps

    • Identifying potential hazards for each step

    • Determining preventive measures to reduce risks

    • Ensures workers are aware of safety procedures

    • Examples: construction site JSA, manufacturing plant JSA

  • Answered by AI
  • Q2. What is hazard identification and risk assessment
  • Ans. 

    Hazard identification is the process of identifying potential sources of harm in the workplace, while risk assessment involves evaluating the likelihood and severity of those hazards.

    • Hazard identification involves identifying potential sources of harm such as chemicals, machinery, or ergonomic factors.

    • Risk assessment involves evaluating the likelihood and severity of harm from these hazards.

    • The goal is to implement con...

  • Answered by AI
  • Q3. What is fire safety
  • Ans. 

    Fire safety refers to measures taken to prevent and protect against the risks of fire.

    • Fire safety includes having working smoke detectors in place.

    • It also involves creating and practicing a fire escape plan.

    • Proper storage and handling of flammable materials is crucial for fire safety.

    • Regular maintenance of fire extinguishers and other fire safety equipment is important.

    • Training employees on fire safety protocols is ess

  • Answered by AI
  • Q4. Accident investigation
  • Q5. What is hazard site
  • Ans. 

    A hazard site is a location where there is a potential risk of harm to people, property, or the environment.

    • Hazard sites can include industrial facilities, chemical plants, nuclear power plants, and construction sites.

    • These sites may contain hazardous materials, dangerous equipment, or unsafe conditions.

    • Proper safety measures and protocols must be followed at hazard sites to prevent accidents and injuries.

    • Examples of h...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Whats is stop work application
  • Ans. 

    Stop work application is a procedure used to halt work activities due to safety concerns or violations.

    • Stop work applications are typically used when there is an imminent danger to workers or the environment.

    • Workers are trained to recognize when a stop work application is necessary and how to properly implement it.

    • Examples of reasons for a stop work application include unsafe working conditions, equipment malfunctions,

  • Answered by AI
  • Q2. What is scaffolding
  • Ans. 

    Scaffolding is a temporary structure used to support workers and materials during construction or maintenance work.

    • Scaffolding provides a safe working platform at height

    • It is typically made of metal or wood

    • Different types include tube and coupler, frame, and system scaffolding

    • Scaffolding must be inspected regularly for safety

  • Answered by AI
  • Q3. Types of scaffolding
  • Ans. 

    Types of scaffolding include supported scaffolding, suspended scaffolding, and aerial lifts.

    • Supported scaffolding is the most common type and is supported by the ground or a building structure.

    • Suspended scaffolding hangs from the roof or top of a building and is commonly used for window washing or painting.

    • Aerial lifts are platforms lifted by cranes or other equipment and are commonly used for tasks at height.

    • Other typ...

  • Answered by AI
  • Q4. Types of accident/incident
  • Ans. 

    Types of accidents/incidents include slips, trips, falls, machinery accidents, chemical exposures, and fires.

    • Slips, trips, and falls are common in workplaces due to wet floors, cluttered walkways, or uneven surfaces.

    • Machinery accidents can occur when proper safety procedures are not followed or equipment malfunctions.

    • Chemical exposures may result from spills, leaks, or improper handling of hazardous substances.

    • Fires ca...

  • Answered by AI
  • Q5. 0% accident incident work

Interview Preparation Tips

Interview preparation tips for other job seekers - Please prepare the conduction all work in safety
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
No response

I applied via LinkedIn and was interviewed in Dec 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Accounting journal entries
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
No response

I applied via Approached by Company and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Whats LEL tell procedures
  • Q2. Tel us the control of confind

PM Group Interview FAQs

How many rounds are there in PM Group interview?
PM Group interview process usually has 2 rounds. The most common rounds in the PM Group interview process are Technical, Resume Shortlist and HR.
How to prepare for PM Group interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at PM Group. The most common topics and skills that interviewers at PM Group expect are Construction Management, HTML, Life Sciences, Business Strategy and ICT.
What are the top questions asked in PM Group interview?

Some of the top questions asked at the PM Group interview -

  1. Stages of engineer...read more
  2. Psychological questions which relate to commercial busine...read more
  3. TECHNICAL QUESTION ABOUT TO SPPID T...read more

Tell us how to improve this page.

People are getting interviews through

based on 3 PM Group interviews
Referral
67%
33% candidates got the interview through other sources.
Moderate Confidence
?
Moderate Confidence means the data is based on a sufficient number of responses received from the candidates

Interview Questions from Similar Companies

Infosys Interview Questions
3.7
 • 7.5k Interviews
Wipro Interview Questions
3.7
 • 5.5k Interviews
Tech Mahindra Interview Questions
3.6
 • 3.8k Interviews
Tata Group Interview Questions
4.2
 • 357 Interviews
Adani Group Interview Questions
3.9
 • 176 Interviews
Bharat Petroleum Interview Questions
4.2
 • 152 Interviews
View all

PM Group Reviews and Ratings

based on 37 reviews

4.2/5

Rating in categories

3.8

Skill development

4.6

Work-Life balance

3.9

Salary & Benefits

4.3

Job Security

4.3

Company culture

3.6

Promotions/Appraisal

3.9

Work Satisfaction

Explore 37 Reviews and Ratings
Senior Piping Design Engineer

Bangalore / Bengaluru

16-18 Yrs

Not Disclosed

Quality Assurance Coordinator & Document Controller

Bangalore / Bengaluru

2-5 Yrs

Not Disclosed

Talent Acquisition Specialist

Bangalore / Bengaluru

7-8 Yrs

Not Disclosed

Explore more jobs
Senior Engineer
8 salaries
unlock blur

₹14.2 L/yr - ₹24 L/yr

Financial Analyst
7 salaries
unlock blur

₹5.2 L/yr - ₹7 L/yr

Process Designer
7 salaries
unlock blur

₹10.4 L/yr - ₹15 L/yr

Senior Instrument Engineer
7 salaries
unlock blur

₹16 L/yr - ₹24 L/yr

Senior Process Engineer
7 salaries
unlock blur

₹19 L/yr - ₹30 L/yr

Explore more salaries
Compare PM Group with

Tata Group

4.2
Compare

Larsen & Toubro Limited

4.0
Compare

Adani Group

3.9
Compare

Mahindra & Mahindra

4.1
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview