Filter interviews by
I applied via Naukri.com and was interviewed in Jul 2023. There were 2 interview rounds.
PID stands for Proportional-Integral-Derivative, a control loop feedback mechanism used in industrial processes to maintain desired setpoints.
PID is a control algorithm that calculates an error value as the difference between a desired setpoint and a measured process variable.
The PID controller then adjusts the process control inputs to minimize the error and keep the process variable close to the setpoint.
The Proporti...
A thermowell in a tank is a protective device used to shield temperature sensors from the harsh environment inside the tank.
Thermowells are typically made of metal and are inserted into the tank to provide a sealed chamber for the temperature sensor.
They help protect the sensor from corrosion, pressure, and other damaging factors inside the tank.
Thermowells also allow for easy removal and replacement of the temperature...
Top trending discussions
I applied via Recruitment Consultant and was interviewed before Aug 2020. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in Jun 2020. There were 3 interview rounds.
I appeared for an interview in Jul 2023.
I applied via Company Website and was interviewed in Dec 2023. There were 2 interview rounds.
Technically knowledge
The number of labors required in a cum RCC depends on various factors such as project size, complexity, and timeline.
The number of labors required in a cum RCC can vary depending on the size of the project. Larger projects may require more labors.
The complexity of the project also plays a role in determining the number of labors needed. More complex projects may require additional skilled labors.
The timeline of the pro...
I applied via Referral and was interviewed in Jan 2021. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Mar 2021. There was 1 interview round.
I have fabricated X tons of material within Y time span with successful execution.
Amount of material fabricated
Time span for fabrication
Execution success rate
PMO stands for Project Management Office. It is a centralized department that oversees project management across an organization.
PMO provides guidance, support, and standards for project management
It ensures that projects are aligned with the organization's goals and objectives
PMO monitors project progress and provides regular reports to stakeholders
It also manages resources, budgets, and risks associated with projects
...
I applied via Recruitment Consultant and was interviewed in Mar 2021. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 7 reviews
Rating in categories
Production Supervisor
689
salaries
| ₹1.8 L/yr - ₹9 L/yr |
Executive
258
salaries
| ₹3 L/yr - ₹10.6 L/yr |
Supervisor
241
salaries
| ₹2.2 L/yr - ₹8.5 L/yr |
Research Scientist
214
salaries
| ₹4 L/yr - ₹11 L/yr |
Senior Executive
162
salaries
| ₹6.1 L/yr - ₹14.6 L/yr |
Aarti Industries
UPL
Coromandel International
Rallis India