Upload Button Icon Add office photos

Filter interviews by

Phil Group Process Head Interview Questions, Process, and Tips

Updated 5 Jan 2023

Phil Group Process Head Interview Experiences

1 interview found

Process Head Interview Questions & Answers

user image Anonymous

posted on 5 Jan 2023

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Newspaper Ad and was interviewed in Dec 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(9 Questions)

  • Q1. Chemical consumption per ton of coal
  • Ans. 

    Chemical consumption per ton of coal varies depending on the process and type of coal.

    • The chemical consumption can range from 0.5 to 10 kg per ton of coal.

    • The type of coal and the process used can affect the chemical consumption.

    • Common chemicals used include lime, caustic soda, and sulfuric acid.

    • Chemical consumption is typically higher in processes that involve coal washing or desulfurization.

    • Regular monitoring and opt...

  • Answered by AI
  • Q2. Magnetite powder used per ton
  • Ans. 

    The amount of magnetite powder used per ton varies depending on the specific process and application.

    • The amount of magnetite powder used per ton can range from 100 to 1000 kilograms

    • The specific process and application will determine the amount of magnetite powder needed

    • For example, in the production of iron ore pellets, approximately 200 kilograms of magnetite powder is used per ton

  • Answered by AI
  • Q3. Pressure in heavy media pump
  • Ans. 

    Pressure in heavy media pump is crucial for efficient operation.

    • Heavy media pumps require high pressure to move dense fluids like slurries and suspensions.

    • Pressure is created by the pump's impeller, which forces the fluid through the system.

    • The pressure must be carefully monitored and controlled to prevent damage to the pump and ensure optimal performance.

    • Factors that can affect pressure include the viscosity and densi...

  • Answered by AI
  • Q4. Capacity of washery with rotary braker capacity
  • Ans. 

    The capacity of the washery depends on the capacity of the rotary breaker.

    • The capacity of the washery should be equal to or greater than the capacity of the rotary breaker.

    • The rotary breaker breaks the coal into smaller sizes, which are then processed in the washery.

    • The capacity of the rotary breaker can range from 100 to 2000 tons per hour depending on the size of the coal and the requirements of the customer.

  • Answered by AI
  • Q5. Coal matching with ash
  • Ans. 

    Coal and ash should be matched to ensure efficient combustion and minimize environmental impact.

    • Matching coal with ash involves analyzing the chemical composition of both to determine the appropriate ratio for efficient combustion.

    • The ash content of coal can affect its heating value and combustion efficiency.

    • Matching coal with ash can also help minimize environmental impact by reducing emissions of pollutants such as s...

  • Answered by AI
  • Q6. Quality control of coal
  • Ans. 

    Quality control of coal involves various tests and measures to ensure its purity and efficiency.

    • Coal samples are collected and analyzed for their chemical composition, moisture content, and ash content.

    • Various tests are conducted to determine the calorific value of coal, which is a measure of its energy content.

    • Coal is also tested for its sulfur content, which can have environmental implications.

    • Quality control measure...

  • Answered by AI
  • Q7. Reason of drop pressure in pump
  • Ans. 

    Drop in pressure in pump can be caused by various factors.

    • Leakage in the pump or pipeline

    • Clogged suction or discharge lines

    • Air pockets in the pump or pipeline

    • Worn out impeller or casing

    • Incorrectly sized pump or motor

    • Low fluid level in the pump

    • High fluid viscosity

    • Excessive friction losses in the pipeline

  • Answered by AI
  • Q8. Water circuit layout used in washery
  • Ans. 

    The water circuit layout in a washery is designed to efficiently recycle and reuse water for various processes.

    • The layout includes a series of settling ponds and tanks to remove impurities from the water.

    • Water is then treated with chemicals to remove any remaining impurities.

    • The treated water is then reused in various processes such as coal washing and dust suppression.

    • Effluent water is discharged after meeting the req...

  • Answered by AI
  • Q9. How much ash will be down after process in rotary braker
  • Ans. 

    The amount of ash produced in a rotary breaker process depends on various factors.

    • The type and quality of coal being processed

    • The size and capacity of the rotary breaker

    • The speed and angle of the rotary breaker

    • The moisture content of the coal

    • The efficiency of the dust collection system

    • Typically, the ash content in coal ranges from 5-40%, so the amount of ash produced will vary accordingly

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't go in depression with one or two rejection,every interview teach some point that usefull in next interview so keep confidence you are the best

Phil Group Interview FAQs

How many rounds are there in Phil Group Process Head interview?
Phil Group interview process usually has 2 rounds. The most common rounds in the Phil Group interview process are Resume Shortlist and Technical.
What are the top questions asked in Phil Group Process Head interview?

Some of the top questions asked at the Phil Group Process Head interview -

  1. How much ash will be down after process in rotary bra...read more
  2. Capacity of washery with rotary braker capac...read more
  3. Reason of drop pressure in p...read more

Tell us how to improve this page.

Phil Group Process Head Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

AmbitionBox Interview Questions
4.9
 • 152 Interviews
HCL Infosystems Interview Questions
3.9
 • 141 Interviews
Webdew Interview Questions
4.5
 • 106 Interviews
Data Entry Interview Questions
4.1
 • 96 Interviews
HyScaler Interview Questions
4.5
 • 90 Interviews
CapitalOne Interview Questions
3.7
 • 78 Interviews
3 Minds Digital Interview Questions
4.4
 • 64 Interviews
View all

Phil Group Process Head Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

4.0

Skill development

2.0

Work-life balance

4.0

Salary

2.0

Job security

2.0

Company culture

2.0

Promotions

3.0

Work satisfaction

Explore 1 Review and Rating
Compare Phil Group with

Marpu Foundation

4.8
Compare

Huawei Technologies

4.0
Compare

HCL Infosystems

3.9
Compare

Z X Learning

4.5
Compare
Did you find this page helpful?
Yes No
write
Share an Interview