Wind calculation as per IS875 involves determining wind loads on structures based on specified parameters.
IS875 provides guidelines for calculating wind loads on structures in India
Factors such as wind speed, terrain category, and building height are considered
Wind loads are calculated using formulas provided in the code
Example: Wind load calculation for a tall building in a coastal area would be different from a build
Base shear calculation as per IS1893 involves determining the seismic force acting on a structure.
Base shear is calculated using the formula V = AhW, where V is the base shear, A is the seismic coefficient, h is the height of the structure, and W is the total seismic weight of the structure.
Seismic coefficient A is determined based on the seismic zone and the importance factor of the structure as per IS1893.
The total s...
3D STAAD design and analysis.
I applied via Referral and was interviewed before Apr 2023. There was 1 interview round.
posted on 25 May 2024
I applied via Naukri.com and was interviewed before Mar 2023. There was 1 interview round.
Planning for production involves creating a detailed schedule, coordinating resources, and optimizing efficiency.
Develop a production schedule to ensure timely delivery of products
Coordinate with different departments to allocate resources effectively
Optimize production processes to increase efficiency and reduce costs
I applied via Referral and was interviewed before Sep 2020. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Aug 2023. There were 4 interview rounds.
A chiller is a machine that removes heat from a liquid via a vapor-compression or absorption refrigeration cycle.
Chillers are commonly used in air conditioning systems to cool buildings or industrial processes.
They work by transferring heat from the liquid being chilled to a separate fluid, which is then circulated through a heat exchanger to cool it down.
Chillers can be water-cooled or air-cooled, depending on the app
Salary and job responsibilities
posted on 18 May 2020
I applied via Naukri.com and was interviewed in Nov 2019. There were 3 interview rounds.
Control valve calibration involves adjusting the valve to ensure it operates within specified parameters.
Determine the valve's operating range and desired set points
Use a calibration bench or in-line calibration equipment to adjust the valve's position and response time
Verify the valve's performance using a flow meter or pressure gauge
Document the calibration process and results for future reference
posted on 23 Dec 2024
I applied via Naukri.com and was interviewed in Jun 2024. There were 2 interview rounds.
I have 8 years of experience in field surveying.
I have 8 years of experience in conducting field surveys for various projects.
I am proficient in using surveying equipment such as total stations and GPS devices.
I have experience in analyzing survey data and creating detailed reports.
I have worked on projects ranging from land development to infrastructure construction.
Yes, I have knowledge in DGPS and Total Station.
I have experience using DGPS for precise positioning in surveying and mapping.
I am familiar with Total Station equipment for measuring angles and distances in surveying.
I have used both DGPS and Total Station in various engineering projects.
I am proficient in data collection and analysis using DGPS and Total Station technology.
My current CTC per month is $10,000 and per year is $120,000.
Current CTC per month: $10,000
Current CTC per year: $120,000
Topography survey is a detailed mapping of the natural and man-made features of a piece of land.
Topography survey involves measuring and mapping the elevation, contours, and features of a land area.
It helps in understanding the terrain, drainage patterns, and existing structures on the land.
Topography surveys are essential for construction projects, land development, and environmental assessments.
Surveyors use speciali...
RL stands for Reinforcement Learning, a type of machine learning where an agent learns to make decisions by interacting with an environment.
RL involves an agent learning to take actions in an environment to maximize some notion of cumulative reward.
It is based on the idea of trial and error learning, where the agent learns from the consequences of its actions.
Examples of RL algorithms include Q-Learning, Deep Q Network
A KMZ file is a compressed version of a KML file used for displaying geographic data in Google Earth.
Create or download a KML file with geographic data
Compress the KML file using a tool like 7-Zip or WinZip
Change the file extension from .zip to .kmz
Open the KMZ file in Google Earth to view the geographic data
The Traverse is a method used in surveying and navigation to move through an area by taking a series of connected measurements and directions.
Traverse involves measuring distances and angles between points to create a connected path.
It is commonly used in land surveying, construction, and navigation.
Traverse can be closed or open depending on whether it returns to the starting point.
Example: A land surveyor uses a trav
Error distribution in a point can be achieved by considering the uncertainty in measurements and applying statistical methods.
Consider the uncertainty in measurements to determine the range of possible values for the point.
Apply statistical methods such as standard deviation to distribute the error around the point.
Use error propagation techniques to calculate the overall error in the point based on the errors in indiv
Total Station is a surveying instrument used for measuring angles and distances to accurately layout areas.
Set up the Total Station at a known point with a clear line of sight to the area to be surveyed.
Calibrate the instrument by leveling it and inputting the necessary parameters such as height and angle.
Measure distances and angles to various points in the area to create a detailed map or layout.
Use the data collecte...
I have 8 years of experience in Total Station, Auto level, Digital level, Theodolite, and Digital Theodolite.
8 years experience in Total Station, Auto level, Digital level, Theodolite, and Digital Theodolite.
Proficient in using all mentioned surveying instruments.
Experience in conducting precise measurements for various projects.
Skilled in data collection and analysis using these instruments.
Dumpy level, auto level, and digital level are all types of surveying instruments used for measuring horizontal and vertical levels.
Dumpy level is a basic surveying instrument with a telescope and bubble level for measuring horizontal and vertical angles.
Auto level is a more advanced version of a dumpy level that automatically adjusts the line of sight to be horizontal.
Digital level is a modern surveying instrument tha...
based on 12 reviews
Rating in categories
Detailing Engineer
84
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Detailing Engineer
22
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
22
salaries
| ₹0 L/yr - ₹0 L/yr |
Design Engineer
19
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
12
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata BlueScope Steel
Jindal Steel and Power
Kirby Building Systems
Interarch Building Product