IS codes are standards set by the Bureau of Indian Standards for construction materials, methods, and practices.
IS codes ensure quality and safety in construction.
They provide guidelines for the use of materials like cement, steel, and concrete.
They also cover construction practices like plumbing, electrical work, and fire safety.
Examples of IS codes include IS 456 for reinforced concrete design and IS 800 for steel de...
Yes, code for billing work.
Billing code is essential for any business that sells products or services.
It ensures accurate and timely invoicing, payment processing, and financial reporting.
Examples of billing code include calculating taxes, discounts, and shipping costs.
It also involves integrating with payment gateways and accounting software.
Good billing code is scalable, secure, and easy to maintain.
7QC tools are a set of quality control tools used to identify and solve quality problems in manufacturing processes.
7QC tools include Pareto chart, cause-and-effect diagram, control chart, histogram, scatter diagram, flowchart, and check sheet.
They help in identifying and analyzing quality problems, determining root causes, and implementing corrective actions.
They are used to improve product quality, reduce defects, an...
PPAP and APQP are quality management systems used in manufacturing.
PPAP stands for Production Part Approval Process and is used to ensure that manufactured parts meet customer requirements.
APQP stands for Advanced Product Quality Planning and is used to plan and manage the design and development of new products.
Both systems are commonly used in the automotive industry but can be applied to other manufacturing industrie...
Pareto is a principle that states 80% of effects come from 20% of causes.
Also known as the 80/20 rule
Used in business to identify the most important factors
Can be applied to various fields such as economics, engineering, and social sciences
Example: 80% of a company's profits come from 20% of its customers
OEE can be calculated by multiplying Availability, Performance, and Quality percentages.
Calculate Availability by dividing Operating Time by Planned Production Time.
Calculate Performance by dividing Actual Production by Maximum Production.
Calculate Quality by dividing Good Units by Total Units Produced.
Multiply Availability, Performance, and Quality percentages to get OEE.
I applied via Naukri.com and was interviewed in Aug 2023. There were 4 interview rounds.
Core tools of AIAG include FMEA, PPAP, MSA, SPC, and APQP.
FMEA (Failure Mode and Effects Analysis) is used to identify and prioritize potential failure modes in a process.
PPAP (Production Part Approval Process) is used to ensure that suppliers meet customer requirements.
MSA (Measurement Systems Analysis) is used to assess the quality of measurement systems.
SPC (Statistical Process Control) is used to monitor and contro...
I have experienced failures in project deadlines, communication, and technical solutions.
Missed project deadlines due to underestimating tasks
Miscommunication with team members leading to misunderstandings
Implemented technical solutions that did not meet requirements
Heat treatment process is a method used to alter the physical and sometimes chemical properties of a material through heating and cooling.
Involves heating the material to a specific temperature
Holding it at that temperature for a set amount of time
Then cooling it at a controlled rate
Can be used to increase hardness, improve machinability, or enhance other properties
Common techniques include annealing, quenching, temper
I applied via Walk-in and was interviewed in Dec 2022. There were 3 interview rounds.
Line balancing is the process of evenly distributing workload among workstations in a production line to optimize efficiency.
Line balancing aims to minimize idle time and maximize productivity
It involves assigning tasks to workstations based on their processing times
Example: In a manufacturing plant, line balancing ensures each workstation has a similar amount of work to do
Assembly balancing is the process of optimizing the work distribution among different workstations to improve efficiency and productivity.
Assembly balancing involves assigning tasks to different workstations in a way that minimizes idle time and maximizes throughput.
It helps in achieving a smooth flow of work and prevents bottlenecks in the production process.
Factors considered in assembly balancing include task time, ...
Cycle time is the total time it takes to complete a process, while tact time is the time it takes to produce one unit.
Cycle time includes all the time spent on a process, including wait time and processing time.
Tact time is the rate at which a product must be produced to meet customer demand.
For example, if a process takes 10 minutes to complete and the customer demand is 100 units per hour, the tact time would be 0.6 ...
Production is the process of creating goods or services, while quality refers to the standard of those goods or services.
Production involves the manufacturing or creation of goods or services.
Quality refers to the standard or level of excellence of those goods or services.
Production and quality are closely linked as the goal is to produce high-quality products efficiently.
Examples: In a manufacturing plant, production ...
OLE stands for Overall Equipment Effectiveness and OEE stands for Overall Labor Effectiveness.
OLE measures the overall performance of equipment in a manufacturing plant.
OEE measures the overall performance of labor in a manufacturing plant.
Both metrics are used to identify areas for improvement and optimize efficiency.
Example: OLE can help identify equipment downtime and OEE can help identify labor productivity issues.
I applied via Naukri.com and was interviewed in Dec 2023. There were 2 interview rounds.
I appeared for an interview before Jan 2024.
I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.
I am a Quality Engineer with experience in ensuring product quality and implementing quality control processes.
Experienced in conducting quality audits and inspections
Proficient in using quality tools and techniques such as Six Sigma and Lean
Skilled in analyzing data and identifying areas for improvement
Strong knowledge of quality standards and regulations
Effective communicator and collaborator in cross-functional team
As a Quality Engineer, I have implemented various quality control measures and conducted audits to ensure product compliance.
Implemented quality control processes to monitor and improve product quality
Conducted audits to identify non-conformities and implement corrective actions
Collaborated with cross-functional teams to develop and implement quality standards
Performed root cause analysis and implemented preventive mea...
The least count of a micrometer is the smallest measurement that can be read on the scale.
The least count of a micrometer is determined by the number of divisions on the scale and the pitch of the screw.
For example, a micrometer with 50 divisions on the scale and a pitch of 0.5 mm would have a least count of 0.01 mm.
The least count is important for accurate measurements and should be taken into consideration when using
Quality control function involves monitoring and testing products to ensure they meet the required standards.
Quality control function involves inspecting products to ensure they meet the required specifications
It involves testing products to ensure they function as intended
It involves monitoring the production process to identify and correct any defects
Examples include checking the weight and dimensions of a product, t...
I applied via Job Portal and was interviewed in May 2023. There were 3 interview rounds.
About your qualification and knowledge.
posted on 22 Aug 2023
I applied via Naukri.com and was interviewed before Aug 2022. There were 3 interview rounds.
Sales Executive
4
salaries
| ₹2.9 L/yr - ₹4.5 L/yr |
Sales Manager
4
salaries
| ₹5.4 L/yr - ₹9 L/yr |
Planning Engineer
4
salaries
| ₹8.5 L/yr - ₹12.6 L/yr |
Civil Site Engineer
4
salaries
| ₹2 L/yr - ₹3.2 L/yr |
Assistant General Manager Accounts
4
salaries
| ₹6 L/yr - ₹9 L/yr |
Coca-Cola Company
Dhoot Transmission
Apotex Research
Athena BPO