Upload Button Icon Add office photos

Filter interviews by

Panoli Intermediates India Manager Electrical & Instrumentation Interview Questions and Answers

Updated 11 Aug 2021

Panoli Intermediates India Manager Electrical & Instrumentation Interview Experiences

1 interview found

I applied via Company Website and was interviewed in Feb 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About 11kv electrical setup , 11kv medium voltage operated vfds, DCS experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident on whatever you know and the thing which you don't know, clearly say no to them instead of jumbeling

Interview questions from similar companies

Round 1 - Aptitude Test 

Dear Godrej group
Plz proceds my interview stap and forward advice to company and joined this month

Round 2 - Technical 

(5 Questions)

  • Q1. Instrumental related technical support engineer at Godrej groop thanks
  • Q2. Technical field is very good for me because this profile is related studies
  • Q3. About Godrej is brond to himself
  • Q4. Godrej group export import both
  • Q5. Plz forward to finl thanks for
Round 3 - One-on-one 

(3 Questions)

  • Q1. I am interested for one on one many times thanks if company selected profile
  • Q2. Instrumental technical
  • Q3. Thanks for godarej groop

Interview Preparation Tips

Interview preparation tips for other job seekers - Thanks for godarej groop for opportunities

Interview Questionnaire 

3 Questions

  • Q1. Many type of instrument calibration or maintenance or furnace operating by DCS or plc
  • Ans. 

    As an Instrument Technician, I have experience in calibrating and maintaining various instruments such as furnaces, operated by DCS or PLC.

    • I have experience in calibrating and maintaining instruments such as pressure gauges, temperature sensors, flow meters, and level transmitters.

    • I am familiar with DCS and PLC systems and can troubleshoot any issues that may arise.

    • I have worked with furnaces and have experience in mai...

  • Answered by AI
  • Q2. Ccalibdation of all jnstrument inside furnace
  • Ans. 

    Calibration of instruments inside furnace is crucial for accurate readings and safe operation.

    • Calibration should be done regularly to ensure accuracy

    • Instruments should be calibrated according to manufacturer's instructions

    • Calibration should be done in a controlled environment to minimize errors

    • Examples of instruments inside furnace that need calibration include temperature sensors, pressure gauges, and flow meters

  • Answered by AI
  • Q3. Plc wiring diagram or DCS loop checking

Skills evaluated in this interview

Tell us how to improve this page.

Interview Questions from Similar Companies

Aarti Industries Interview Questions
4.2
 • 282 Interviews
Berger Paints Interview Questions
3.7
 • 256 Interviews
Atul Interview Questions
3.9
 • 79 Interviews
JSW Paints Interview Questions
3.9
 • 67 Interviews
AkzoNobel Interview Questions
4.1
 • 62 Interviews
Tata Chemicals Interview Questions
4.1
 • 58 Interviews
Hikal Interview Questions
3.9
 • 54 Interviews
View all
Plant Operator
41 salaries
unlock blur

₹1 L/yr - ₹3.5 L/yr

Production Engineer
30 salaries
unlock blur

₹1.6 L/yr - ₹3 L/yr

Maintenance Engineer
22 salaries
unlock blur

₹1.8 L/yr - ₹5 L/yr

DCS Officer
15 salaries
unlock blur

₹1.8 L/yr - ₹2.7 L/yr

Shift Incharge
15 salaries
unlock blur

₹3.2 L/yr - ₹6.3 L/yr

Explore more salaries
Compare Panoli Intermediates India with

Atul

3.9
Compare

Aarti Industries

4.2
Compare

Vinati Organics

4.0
Compare

Navin Fluorine International

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview