Filter interviews by
I applied via Walk-in and was interviewed in Sep 2021. There were 3 interview rounds.
3 lvl IGBT has 3 layers of n-type and p-type semiconductors sandwiched between metal plates.
IGBT stands for Insulated Gate Bipolar Transistor.
It is a three-terminal power semiconductor device.
The internal structure of 3 lvl IGBT consists of 3 layers of n-type and p-type semiconductors sandwiched between metal plates.
The n-type and p-type layers are alternately stacked to form a p-n-p-n structure.
The metal plates act as...
Top trending discussions
posted on 7 Apr 2022
5S is a methodology for workplace organization and VSM is a tool for process improvement.
5S stands for Sort, Set in Order, Shine, Standardize, and Sustain
5S helps to improve efficiency, safety, and quality in the workplace
VSM stands for Value Stream Mapping
VSM is used to identify and eliminate waste in a process
VSM helps to improve lead time, quality, and cost
Both 5S and VSM are commonly used in Lean manufacturing
posted on 26 Sep 2024
Overall equipment effectiveness (OEE) is a measure of how well a manufacturing process is performing.
OEE is calculated by multiplying availability, performance, and quality rates.
It helps identify areas for improvement in production processes.
Example: If a machine has an availability of 90%, performance of 95%, and quality of 98%, the OEE would be 83.7%.
posted on 21 Aug 2023
What is productivity
I applied via Indeed and was interviewed before Jun 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Nov 2022. There were 2 interview rounds.
I applied via Company Website and was interviewed in Jan 2022. There were 2 interview rounds.
posted on 15 Sep 2023
I applied via Referral and was interviewed before Sep 2022. There were 3 interview rounds.
Related basic knowledge
I applied via Naukri.com and was interviewed in Oct 2021. There were 3 interview rounds.
posted on 16 May 2021
I applied via Company Website and was interviewed in Nov 2020. There were 4 interview rounds.
Kaizen and 3M,7QC are continuous improvement methodologies used in production. Here are some examples.
Kaizen: 5S, Poka-Yoke, Kanban, Andon, Gemba Walk
3M: Muda, Mura, Muri
7QC: Pareto Chart, Fishbone Diagram, Control Chart
Associate Engineer
22
salaries
| ₹2 L/yr - ₹4.3 L/yr |
Purchase Associate
7
salaries
| ₹3 L/yr - ₹5.5 L/yr |
Assistant Manager
6
salaries
| ₹4.8 L/yr - ₹5.8 L/yr |
Assistant Manager- Purchase
5
salaries
| ₹3.6 L/yr - ₹5 L/yr |
Production Engineer
5
salaries
| ₹3.5 L/yr - ₹7.3 L/yr |
Escon Elevators
Europa Locks
Trelleborg
Case New-Holland Construction Equipment India