i
P R Packaging
Filter interviews by
I applied via Approached by Company and was interviewed in Aug 2024. There was 1 interview round.
The printing problem could be due to a variety of issues such as low ink levels, paper jams, or connectivity problems.
Check ink levels and replace cartridges if necessary.
Clear any paper jams in the printer.
Ensure the printer is properly connected to the computer or network.
Restart the printer and try printing again.
Update printer drivers if needed.
I applied via Apna Jobs and was interviewed in Jul 2022. There were 4 interview rounds.
Very basic math
And scales parameters
I applied via Recruitment Consultant and was interviewed in Dec 2019. There were 4 interview rounds.
Top trending discussions
I applied via Referral and was interviewed before Dec 2020. There was 1 interview round.
I applied via Naukri.com and was interviewed before Aug 2021. There were 2 interview rounds.
Costing for different types of BOPP involves various factors such as raw material cost, production cost, and overhead expenses.
Raw material cost includes the cost of polypropylene resin, additives, and other materials used in the production process.
Production cost includes expenses related to labor, energy, and maintenance of machinery.
Overhead expenses include costs related to administration, marketing, and distributi...
I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Nov 2024. There was 1 interview round.
Methods to prevent corrosion of railway tracks include regular inspection, painting, cathodic protection, and using corrosion-resistant materials.
Regular inspection of tracks to identify and address corrosion early
Painting the tracks with corrosion-resistant coatings
Applying cathodic protection to prevent corrosion
Using corrosion-resistant materials in track construction
Implementing proper drainage systems to prevent w
Seeking new challenges and opportunities for growth.
Desire for career advancement
Looking for new challenges
Seeking better work-life balance
Relocation to a new area
Company downsizing or restructuring
Conflict with management or colleagues
I can join within 2 weeks of receiving a formal offer.
I will need to provide a notice period to my current employer.
I may need time to relocate if the job is in a different city.
I will need to finalize any pending commitments before joining.
I can start the onboarding process as soon as possible to expedite the joining date.
I appeared for an interview before Feb 2024.
I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Sep 2022. There were 3 interview rounds.
based on 4 interviews
Interview experience
based on 73 reviews
Rating in categories
Printing Supervisor
9
salaries
| ₹2.4 L/yr - ₹4.2 L/yr |
Production Manager
7
salaries
| ₹5.2 L/yr - ₹7 L/yr |
Production Engineer
7
salaries
| ₹2.2 L/yr - ₹4.5 L/yr |
Quality Engineer
7
salaries
| ₹2 L/yr - ₹3.6 L/yr |
Assistant Manager
6
salaries
| ₹4 L/yr - ₹6.7 L/yr |
Uflex
EPL Limited
Jindal Poly Films
Hindusthan National Glass