I applied via Campus Placement and was interviewed before May 2021. There were 3 interview rounds.
Aptitude/Technical test are combine and simple easy to crack.
I applied via LinkedIn and was interviewed before Apr 2022. There were 3 interview rounds.
To manage production assembly line, one needs to focus on optimizing workflow, ensuring quality control, and maintaining equipment.
Create a detailed plan for the assembly line process
Ensure all equipment is functioning properly and maintained regularly
Implement quality control measures to catch defects early
Train and manage staff to ensure efficient workflow
Continuously monitor and analyze production data to identify a
The layout of assembly process involves arranging the workstations and equipment in a logical sequence to optimize efficiency.
Identify the sequence of operations required to assemble the product
Arrange the workstations and equipment in a logical order to minimize movement and transportation
Ensure that the layout allows for easy access to tools and materials
Consider the ergonomics of the workstations to minimize worker ...
CTQ refers to Critical to Quality while CTP refers to Critical to Process.
CTQ is a customer-focused metric that measures the quality of a product or service.
CTP is a process-focused metric that measures the critical steps in a process that affect the quality of the final product.
CTQ is used to identify customer requirements and ensure they are met.
CTP is used to identify critical process steps and ensure they are contr...
I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed before Oct 2023. There were 4 interview rounds.
I applied via Walk-in and was interviewed in Jul 2023. There were 3 interview rounds.
Production planning, manpower handling, machine toolset
I appeared for an interview in Aug 2024.
Plasma welding uses a high-temperature ionized gas to melt and join metals together.
Plasma welding involves creating an electrical arc between the workpiece and the electrode, ionizing the gas to form plasma.
The high temperature of the plasma melts the metals being welded together.
Plasma welding is commonly used for precision welding of thin materials or in applications where a high level of control is needed.
Examples ...
Brazing welding is a joining process where a filler metal is melted and distributed between two or more close-fitting parts by capillary action.
Brazing involves heating the base metals to a temperature above 450°C but below their melting point.
The filler metal, usually in the form of a wire or preformed shape, is then melted and flows into the joint by capillary action.
The filler metal must wet the base metals and form...
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Involves distributing work evenly among workstations
Minimizes idle time and bottlenecks
Helps improve productivity and reduce production costs
Example: In an assembly line, tasks like welding, painting, and assembly are balanced to ensure smooth flow
Types of muda in production engineering include overproduction, waiting, transportation, processing, inventory, motion, and defects.
Overproduction: Producing more than needed, leading to waste of resources.
Waiting: Delays in production due to inefficient processes or lack of coordination.
Transportation: Unnecessary movement of materials or products, increasing lead time.
Processing: Unnecessary steps or complex processe...
I applied via Walk-in and was interviewed in Jan 2024. There were 2 interview rounds.
The full repair breakdown rms refers to the detailed analysis of the repair process in a production environment.
The full repair breakdown includes a step-by-step breakdown of the repair process.
It provides information on the time taken for each step, the resources used, and any issues encountered.
The breakdown helps identify bottlenecks, inefficiencies, and areas for improvement in the repair process.
Examples of data c...
1.ac.2 repair.3demo.intalltiob
I applied via Recruitment Consulltant and was interviewed before Aug 2022. There were 3 interview rounds.
Financial Analyst
138
salaries
| ₹3.2 L/yr - ₹11.1 L/yr |
Finance Executive
135
salaries
| ₹2.5 L/yr - ₹7.5 L/yr |
Assistant Manager
93
salaries
| ₹7.9 L/yr - ₹16.5 L/yr |
Design Engineer
78
salaries
| ₹3 L/yr - ₹8 L/yr |
Senior Financial Analyst
76
salaries
| ₹6.2 L/yr - ₹11.6 L/yr |
OPPO
LG Electronics
Cargill
AECOM