Maintaining aeration health involves proper monitoring, equipment maintenance, and ensuring adequate oxygen levels.
Regularly monitor oxygen levels in water bodies
Maintain aeration equipment to ensure proper functioning
Avoid overstocking fish in aquaculture systems to prevent oxygen depletion
Implement proper water circulation techniques to enhance aeration
Consider using aerators or diffusers in stagnant water bodies
Top trending discussions
I applied via Referral and was interviewed in Mar 2021. There were 3 interview rounds.
posted on 13 Oct 2021
I applied via Referral and was interviewed before Oct 2020. There were 4 interview rounds.
I applied via Recruitment Consultant and was interviewed before Oct 2020. There was 1 interview round.
I have extensive experience in using various piping design tools.
Proficient in using AutoCAD for piping design
Familiar with 3D modeling software like SolidWorks for creating detailed piping layouts
Skilled in using piping design software such as Caesar II for stress analysis
Experience in using PDMS (Plant Design Management System) for piping design and layout
Knowledge of industry standards and codes related to piping de
I applied via Recruitment Consulltant and was interviewed before Dec 2021. There were 4 interview rounds.
I applied via LinkedIn and was interviewed before Sep 2022. There were 3 interview rounds.
Pipe sizing calculation involves determining the appropriate diameter of a pipe based on flow rate, pressure drop, and material properties.
Calculate the required flow rate for the system
Determine the pressure drop allowed in the system
Consider the material properties of the pipe such as friction factor and roughness
Use pipe sizing charts or formulas to find the appropriate diameter
Ensure the selected pipe size meets th
I appeared for an interview before Mar 2024.
Basic aptitude question of gate and in technical go through gate 1 mark question
Shell and tube heat exchanger design involves selecting appropriate materials, determining tube layout, and calculating heat transfer coefficients.
Select appropriate materials based on fluid properties and operating conditions
Determine tube layout to optimize heat transfer efficiency
Calculate heat transfer coefficients to ensure proper heat exchange
Consider factors like fouling, pressure drop, and thermal expansion in ...
To find the difference in Air and N2 in a plant, analyze the composition and properties of each gas.
Analyze the composition of Air (mainly nitrogen and oxygen) and N2 (pure nitrogen)
Measure the concentration of each gas in the plant
Consider the properties of each gas such as density, boiling point, and reactivity
Use gas detection equipment to identify and quantify the presence of Air and N2
Our plant generates approximately 100 tons of waste per month.
We have implemented waste reduction strategies to minimize our environmental impact.
We segregate waste into different categories for proper disposal and recycling.
Regular waste audits are conducted to track and analyze our waste generation.
Examples: paper waste, plastic waste, organic waste, hazardous waste
HAZOP focuses on identifying potential hazards in a process, while HIRA assesses risks associated with those hazards.
HAZOP stands for Hazard and Operability Study, which is a structured technique used to identify potential hazards in a process plant.
HIRA stands for Hazard Identification and Risk Assessment, which involves assessing the risks associated with identified hazards.
HAZOP is more focused on identifying specif...
based on 1 interview
Interview experience
Junior Officer
110
salaries
| ₹1.5 L/yr - ₹4 L/yr |
Junior Production Officer
41
salaries
| ₹1.6 L/yr - ₹3.8 L/yr |
Research Associate
25
salaries
| ₹3 L/yr - ₹8.1 L/yr |
Shift Engineer
24
salaries
| ₹2 L/yr - ₹5 L/yr |
Production Engineer
21
salaries
| ₹3 L/yr - ₹4.8 L/yr |
Berger Paints
Kansai Nerolac Paints
AkzoNobel
Godrej Industries Group