Filter interviews by
I applied via LinkedIn and was interviewed before Oct 2023. There was 1 interview round.
The 7 QC tools are a set of basic statistical tools used for quality control and improvement in manufacturing processes.
Check sheet: Used to collect and organize data in a structured format.
Histogram: A graphical representation of data distribution.
Pareto chart: Shows the frequency of defects or issues in descending order.
Cause-and-effect diagram (Fishbone diagram): Helps identify root causes of problems.
Scatter diagra...
5wh 2h system is a problem-solving technique used to identify the root cause of an issue by asking Who, What, Where, When, Why, How, and How much.
5wh 2h system involves asking Who is involved, What happened, Where did it occur, When did it happen, Why did it happen, How did it happen, and How much did it impact.
It helps in systematically analyzing a problem to determine its root cause and develop effective solutions.
Ex...
Top trending discussions
I applied via Recruitment Consulltant and was interviewed before Apr 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Aug 2023. There was 1 interview round.
The question includes topics such as HPDC process calculation, 5S, Kaizen implementation, reducing process rejection, and plan vs actual.
HPDC process calculation involves determining the parameters for high-pressure die casting.
5S is a methodology for workplace organization and standardization.
Kaizen is a continuous improvement approach that focuses on small incremental changes.
To reduce process rejection, one can impl...
I applied via Company Website and was interviewed before Oct 2022. There were 4 interview rounds.
It was a easy round asked apti only
It was Easy-medium type round
posted on 8 May 2024
I applied via Walk-in and was interviewed in Nov 2023. There were 2 interview rounds.
VA is value analysis, while VE is value engineering. Both are cost-saving techniques used in product development.
VA is a systematic review of a product's components and functions to identify areas where cost can be reduced without affecting performance.
VE is a more comprehensive approach that involves rethinking the entire product design to achieve cost savings while improving performance.
VA is typically used in the ea...
The cost of plastic molding components can be calculated by considering factors such as material cost, tooling cost, labor cost, and overhead cost.
Determine the material cost per unit of the component
Calculate the tooling cost, which includes the cost of the mold and any necessary equipment
Factor in the labor cost, which includes the cost of operating the molding machine and any necessary labor for finishing and assemb...
Polymers are large molecules made up of repeating units called monomers. They have a wide range of applications in various fields.
Polyethylene
Polypropylene
Polyvinyl chloride
Polystyrene
Polyester
Polyurethane
Nylon
Teflon
Silicone
Rubber
I applied via Recruitment Consulltant and was interviewed before Jul 2023. There was 1 interview round.
IATF clauses refer to specific requirements outlined in the International Automotive Task Force standards for automotive quality management systems.
IATF clauses are essential components of the quality management system for automotive companies.
They outline specific requirements that must be met in order to achieve IATF certification.
Examples of IATF clauses include requirements for leadership commitment, risk managemen...
M codes and G codes are commands used in CNC machines to control various functions and operations.
M codes are used for miscellaneous functions like stopping the machine or changing tools.
G codes are used for specific movements and operations like cutting, drilling, or milling.
Examples of M codes: M00 (program stop), M06 (tool change), M30 (end of program)
Examples of G codes: G00 (rapid positioning), G01 (linear interpo
APQP stands for Advanced Product Quality Planning, which is a phase-based approach to product development in the automotive industry.
APQP consists of five phases: Planning, Product Design, Process Design, Product and Process Validation, and Feedback and Continuous Improvement.
Each phase has specific deliverables and activities that must be completed before moving on to the next phase.
For example, in the Product Design ...
IATF (International Automotive Task Force) is a global organization that develops and maintains quality management standards for the automotive industry.
IATF collaborates with automotive manufacturers to create unified quality standards
IATF 16949 is the latest version of the standard, focusing on continuous improvement and defect prevention
Certification to IATF standards is often required for suppliers to automotive OE
HPDC stands for High Pressure Die Casting, a process used to produce complex metal parts by injecting molten metal into a mold under high pressure.
HPDC involves injecting molten metal into a steel mold cavity at high pressure.
The high pressure helps in filling the mold quickly and accurately, resulting in high precision parts.
This process is commonly used in automotive, aerospace, and electronics industries for produci...
based on 4 interviews
Interview experience
based on 30 reviews
Rating in categories
Production Engineer
30
salaries
| ₹2 L/yr - ₹4.7 L/yr |
QMS Engineer
9
salaries
| ₹3.6 L/yr - ₹5.5 L/yr |
Quality Engineer
8
salaries
| ₹1.8 L/yr - ₹3.6 L/yr |
Engineer
6
salaries
| ₹2.6 L/yr - ₹3.8 L/yr |
Shift Engineer
6
salaries
| ₹3.3 L/yr - ₹4.8 L/yr |
Knorr-Bremse
Greaves Cotton
Sanden Vikas
Victora Auto Private Limited