Upload Button Icon Add office photos

Opgs Power Gujarat

Compare button icon Compare button icon Compare

Filter interviews by

Opgs Power Gujarat Accounts Manager Interview Questions and Answers

Updated 11 Apr 2021

Opgs Power Gujarat Accounts Manager Interview Experiences

1 interview found

I applied via Walk-in and was interviewed in Oct 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Based on Resume, SAP and MS Excel skills were enquired upon. Taxation and other skills has also been enquired. Willingness to work hard and face challenges.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Bold and Confident to tell Truth and give Confidence to Interviewer that you will deliver his/her expectations with respect to your job applied/offered for.

Interview questions from similar companies

I applied via Recruitment Consulltant and was interviewed before Aug 2021. There was 1 interview round.

Round 1 - Behavioral 

(2 Questions)

  • Q1. What are your 3 strengths and weaknesses
  • Q2. Why Enercon and why are you leaving your current company

Interview Preparation Tips

Interview preparation tips for other job seekers - Show your genuine interest to work here. Show the long term commitment plans
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jun 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Technical understanding
Round 3 - HR 

(1 Question)

  • Q1. Remuneration package
Round 4 - Behavioral 

(1 Question)

  • Q1. Attitude, personal behavior
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2023. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Ask basic questions about your work profile.
Round 2 - Technical 

(1 Question)

  • Q1. Ask basic questions about your work profile.
Round 3 - HR 

(1 Question)

  • Q1. Salary discussion and working profile details.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(5 Questions)

  • Q1. About work experience and education details.
  • Q2. Preparedness for joining.
  • Q3. Sallary details.
  • Q4. Your expectations
  • Q5. Reason for joining

Interview Preparation Tips

Interview preparation tips for other job seekers - Join this company only if you are ready to learn new things and ready to take responsibility.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Oct 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About Boiler DCS operation
Round 3 - HR 

(1 Question)

  • Q1. Family background and salary discussion
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed before Jun 2023. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. What is your job role
  • Q2. Are you seeking for a new job role if yes why
Round 2 - Technical 

(3 Questions)

  • Q1. What is a critical path
  • Ans. 

    The critical path is the longest sequence of tasks in a project that must be completed on time in order for the project to finish on schedule.

    • Identifying the critical path helps in determining the minimum time needed to complete a project.

    • It consists of tasks that have zero slack or float, meaning any delay in these tasks will delay the entire project.

    • Activities on the critical path are often marked with a double line ...

  • Answered by AI
  • Q2. How will you plan a 50 Mwp project
  • Ans. 

    I will plan a 50 Mwp project by conducting feasibility studies, creating a detailed project timeline, securing necessary permits, sourcing materials and contractors, and implementing a quality control plan.

    • Conduct feasibility studies to assess site suitability and potential challenges

    • Create a detailed project timeline outlining key milestones and deadlines

    • Secure necessary permits and approvals from local authorities

    • Sou...

  • Answered by AI
  • Q3. What is the difference between msp and primavera
  • Ans. 

    MSP (Microsoft Project) is a project management software developed by Microsoft, while Primavera is a project management software developed by Oracle.

    • MSP is developed by Microsoft, while Primavera is developed by Oracle.

    • MSP is more commonly used for smaller projects, while Primavera is preferred for larger and more complex projects.

    • MSP is known for its user-friendly interface and ease of use, while Primavera is known f...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024.

Round 1 - HR 

(2 Questions)

  • Q1. What is your level of experience in the particular department?
  • Q2. What is your knowledge base?
  • Ans. 

    I possess a diverse knowledge base in management, operations, and team leadership, complemented by industry-specific insights.

    • Strong understanding of project management principles, demonstrated by successfully leading a cross-functional team to complete a project ahead of schedule.

    • Proficient in data analysis and reporting, utilizing tools like Excel and Tableau to drive informed decision-making.

    • Experience in budget man...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Do you have knowledge of Microsoft Office?
  • Q2. How do you draft an email to share with a specific person?
  • Ans. 

    Drafting an email involves clarity, professionalism, and a clear purpose to effectively communicate with the recipient.

    • Use a clear subject line, e.g., 'Meeting Request for Project Update'.

    • Start with a polite greeting, e.g., 'Dear [Recipient's Name],'.

    • State the purpose of the email in the opening lines, e.g., 'I hope this message finds you well. I am writing to discuss...'.

    • Be concise and to the point, providing necessar...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - A fantastic work environment that emphasizes job security, opportunities for learning and development, teamwork, and flexible working arrangements.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. What are the key aspects of turbine protection?
  • Ans. 

    Key aspects of turbine protection include overspeed protection, vibration monitoring, temperature monitoring, and lube oil system protection.

    • Overspeed protection is crucial to prevent catastrophic failure in case of excessive turbine speed.

    • Vibration monitoring helps detect any abnormal vibrations that could indicate potential issues with the turbine.

    • Temperature monitoring ensures that the turbine operates within safe t...

  • Answered by AI
  • Q2. Boiler light up?
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. GST REGISTRATION
  • Q2. Process of registration
  • Ans. 

    The process of registration involves filling out forms, providing necessary documentation, and paying any required fees.

    • Fill out registration form with accurate information

    • Provide necessary documentation such as identification, proof of address, etc.

    • Pay any required registration fees

    • Submit completed registration form and documentation to appropriate authority

  • Answered by AI

Tell us how to improve this page.

Assistant Engineer
40 salaries
unlock blur

₹1.8 L/yr - ₹4.3 L/yr

Engineer
24 salaries
unlock blur

₹2.8 L/yr - ₹5.5 L/yr

Electrical Engineer
22 salaries
unlock blur

₹2.5 L/yr - ₹6 L/yr

Assistant Manager
17 salaries
unlock blur

₹6 L/yr - ₹10.4 L/yr

Senior Engineer
17 salaries
unlock blur

₹4.5 L/yr - ₹6.4 L/yr

Explore more salaries
Compare Opgs Power Gujarat with

Dhoot Transmission

3.7
Compare

R.K.M Powergen

4.0
Compare

SHV Energy

3.7
Compare

New Allenberry Works

3.4
Compare
Did you find this page helpful?
Yes No
write
Share an Interview