Filter interviews by
I applied via Recruitment Consulltant and was interviewed before Aug 2021. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.
To close customer complaints, actively listen to their concerns, empathize with their frustrations, offer a solution or compensation, and follow up to ensure satisfaction.
Listen attentively to the customer's complaint
Empathize with their frustrations and acknowledge their feelings
Offer a solution or compensation to resolve the issue
Follow up with the customer to ensure their satisfaction
To resolve the issue, identify the root cause, develop a plan, and implement solutions.
Identify the root cause of the issue
Develop a plan to address the issue
Implement solutions based on the plan
Monitor and evaluate the effectiveness of the solutions
Make necessary adjustments if needed
Part programming for VMC and tool selection
I applied via Walk-in and was interviewed in May 2022. There were 4 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Jul 2024. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Jun 2022. There were 4 interview rounds.
Question abou TPM, OEE, six Sigma, lean manufacturing,kaizen,poka yoke etc
Seeking new challenges and opportunities for growth
Looking for new challenges and opportunities to learn and grow
Seeking a more dynamic work environment
Interested in exploring different industries or sectors
I plan to stay with the company long-term and grow within the organization.
I am committed to building a career with your company
I am excited about the opportunity to learn and grow in this role
I am looking for a stable and supportive work environment
I was responsible for designing and implementing electrical systems for commercial buildings.
Designed electrical systems for commercial buildings
Implemented electrical systems according to specifications
Collaborated with architects and contractors to ensure project success
Limitations and abilities refer to the boundaries and skills of an individual or a system.
Limitations are the restrictions or weaknesses that hinder performance or capabilities.
Abilities are the skills, talents, or strengths that enable an individual or a system to perform certain tasks.
Limitations can be physical, cognitive, or resource-related.
Abilities can be technical, problem-solving, or communication-related.
For ...
I am joining here for both professional growth and financial stability.
I am looking for opportunities to enhance my skills and knowledge in engineering.
Financial stability is also important to me, as it allows me to support myself and my family.
I believe that a good balance of professional growth and financial stability is essential for a successful career.
I applied via Referral and was interviewed before Aug 2020. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Nov 2023. There were 3 interview rounds.
I have experience working in a manufacturing company where I was responsible for managing a team of technicians and overseeing production processes.
Managed a team of technicians to ensure smooth operation of production processes
Assigned tasks and responsibilities to team members based on their skills and expertise
Monitored and evaluated the performance of the team to identify areas for improvement
Implemented training p...
posted on 1 Jul 2021
OEE stands for Overall Equipment Efficiency. It is a measure of how effectively a manufacturing operation is utilized.
OEE is calculated by multiplying Availability, Performance, and Quality.
Availability measures the percentage of time that equipment is available for production.
Performance measures the speed at which the equipment operates compared to its designed speed.
Quality measures the percentage of good-quality pr...
Production planning in shopfloor involves creating a detailed plan for manufacturing processes to ensure efficient and timely production.
Production planning involves determining the sequence of operations, resources required, and estimated time for each task.
It includes creating a production schedule, allocating resources, and coordinating with different departments.
The goal is to optimize production, minimize downtime...
Productivity is the measure of efficiency and output in relation to the resources used.
Productivity is a measure of how efficiently resources are used to produce goods or services.
It is the ratio of output to input, indicating how much is produced per unit of input.
Higher productivity means achieving more output with the same or fewer resources.
For example, in manufacturing, productivity can be measured by the number o...
5S is a methodology used to organize and maintain a clean, efficient, and safe work environment.
5S stands for Sort, Set in Order, Shine, Standardize, and Sustain.
Sort involves removing unnecessary items from the workplace.
Set in Order focuses on arranging necessary items in a logical and efficient manner.
Shine involves cleaning and maintaining the workplace.
Standardize establishes guidelines and procedures for maintain...
Senior Engineer
50
salaries
| ₹4.2 L/yr - ₹7.5 L/yr |
Assistant Engineer
32
salaries
| ₹2.2 L/yr - ₹3.8 L/yr |
Assistant Manager
31
salaries
| ₹6 L/yr - ₹10 L/yr |
Deputy Manager
28
salaries
| ₹7.5 L/yr - ₹11.6 L/yr |
Quality Engineer
26
salaries
| ₹1.2 L/yr - ₹4.5 L/yr |
ZF Steering Gear
Greaves Cotton
Goodyear
Shivam Autotech