Upload Button Icon Add office photos

Filter interviews by

Oil Country Tubular ITI Fitter Interview Questions and Answers

Updated 5 Nov 2019

Oil Country Tubular ITI Fitter Interview Experiences

1 interview found

ITI Fitter Interview Questions & Answers

user image Patelvinod Dajibhai

posted on 5 Nov 2019

Interview Questionnaire 

10 Questions

  • Q1. Experience an job mate Su coolipcastion
  • Q2. Colipcastion job tit mechanical
  • Q3. Expression 2to job
  • Q4. Iti fitter mechanical.his compute
  • Q5. Please my job sir
  • Q6. Mentence
  • Q7. Please my sir
  • Q8. Job
  • Q9. Hi
  • Q10. Hiii

Interview Preparation Tips

Interview preparation tips for other job seekers - Please my plesir job Mate helpmi

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Company Website and was interviewed in Nov 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Questions that are designed to assess your specific knowledge and skills related to the technical aspects of a job.
  • Ans. Experience; I have done Apprenticeship technical in Logging Services in ONGC , Palavasana, Mahesana. (Year-2022-23)
  • Answered Anonymously
  • Q2. 10 th pass,12th , iti Fitter , Apprenticeship ONGC Mehsana

Interview Preparation Tips

Topics to prepare for Oil And Natural Gas Corporation ITI Fitter interview:
  • Technical Skills
Interview preparation tips for other job seekers - Set realistic goals: Aim to apply to three to five jobs per week and connect with at least two people daily, even on LinkedIn. Self-care matters: Don't forget to take care of yourself during the job search. Take breaks, eat well, exercise, and make time for activities you enjoy.
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

What kind of work does the company want to do?

Round 2 - Home detail 

(1 Question)

  • Q1. How many people in home

I applied via Walk-in and was interviewed in Jan 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(5 Questions)

  • Q1. What is the centrifugal pump internal part.
  • Ans. 

    The internal parts of a centrifugal pump include impeller, casing, shaft, bearings, and seals.

    • Impeller is the rotating component that imparts energy to the fluid.

    • Casing is the stationary component that encloses the impeller and directs the flow of fluid.

    • Shaft connects the impeller to the motor and transmits power.

    • Bearings support the shaft and reduce friction.

    • Seals prevent leakage of fluid along the shaft.

    • Other interna...

  • Answered by AI
  • Q2. Why in a centrifugal pump alignment dial gauge using.
  • Ans. 

    Centrifugal pump alignment dial gauge is used to ensure proper alignment of the pump shaft and motor shaft.

    • Dial gauge helps in measuring the misalignment between the pump and motor shafts.

    • It ensures that the pump operates smoothly and efficiently.

    • Misalignment can cause vibration, noise, and premature wear and tear of the pump components.

    • Dial gauge readings are used to adjust the pump and motor positions for proper alig...

  • Answered by AI
  • Q3. What is the safety, In a plant.
  • Ans. 

    Safety in a plant refers to the measures taken to prevent accidents and injuries to workers and damage to equipment.

    • Safety protocols and procedures should be established and followed strictly

    • Workers should be trained on safety measures and provided with appropriate safety gear

    • Regular maintenance and inspection of equipment and machinery

    • Emergency response plans should be in place and practiced

    • Regular safety audits and a...

  • Answered by AI
  • Q4. What is the cooling tower purpose.
  • Ans. 

    Cooling tower is used to remove heat from the water-cooled system and release it into the atmosphere.

    • It is used in industries to cool down the water used in various processes.

    • It works on the principle of evaporation.

    • It helps in conserving water by recycling it.

    • It is commonly used in power plants, chemical plants, and oil refineries.

    • The tower is designed to maximize the contact between air and water to facilitate heat t

  • Answered by AI
  • Q5. What is the centrifugal extranal part name.
  • Ans. 

    The centrifugal external part is called impeller.

    • The impeller is the rotating component of a centrifugal pump.

    • It is responsible for transferring energy from the motor to the fluid being pumped.

    • Examples of centrifugal pumps that use impellers include water pumps, chemical pumps, and sewage pumps.

  • Answered by AI
Round 3 - Group Discussion 

100000

Interview Preparation Tips

Interview preparation tips for other job seekers - Good job in a experience in a subject.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Company Website and was interviewed in Nov 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Questions that are designed to assess your specific knowledge and skills related to the technical aspects of a job.
  • Ans. Experience; I have done Apprenticeship technical in Logging Services in ONGC , Palavasana, Mahesana. (Year-2022-23)
  • Answered Anonymously
  • Q2. 10 th pass,12th , iti Fitter , Apprenticeship ONGC Mehsana

Interview Preparation Tips

Topics to prepare for Oil And Natural Gas Corporation ITI Fitter interview:
  • Technical Skills
Interview preparation tips for other job seekers - Set realistic goals: Aim to apply to three to five jobs per week and connect with at least two people daily, even on LinkedIn. Self-care matters: Don't forget to take care of yourself during the job search. Take breaks, eat well, exercise, and make time for activities you enjoy.

I applied via Naukri.com and was interviewed in Apr 2022. There was 1 interview round.

Round 1 - Diesel engine 

(2 Questions)

  • Q1. Engine technician ke bare me
  • Q2. Remove fitment work checking injector change
  • Ans. 

    To remove fitment work checking injector change in ITI Fitter

    • Identify the injector that needs to be changed

    • Remove the old injector carefully

    • Clean the area around the injector

    • Install the new injector properly

    • Check for any leaks or damages

    • Test the injector to ensure proper functioning

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Remove checking work engine testing assemble in December

I applied via Walk-in and was interviewed in Jan 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - One-on-one 

(5 Questions)

  • Q1. What is the centrifugal pump internal part.
  • Ans. 

    The internal parts of a centrifugal pump include impeller, casing, shaft, bearings, and seals.

    • Impeller is the rotating component that imparts energy to the fluid.

    • Casing is the stationary component that encloses the impeller and directs the flow of fluid.

    • Shaft connects the impeller to the motor and transmits power.

    • Bearings support the shaft and reduce friction.

    • Seals prevent leakage of fluid along the shaft.

    • Other interna...

  • Answered by AI
  • Q2. Why in a centrifugal pump alignment dial gauge using.
  • Ans. 

    Centrifugal pump alignment dial gauge is used to ensure proper alignment of the pump shaft and motor shaft.

    • Dial gauge helps in measuring the misalignment between the pump and motor shafts.

    • It ensures that the pump operates smoothly and efficiently.

    • Misalignment can cause vibration, noise, and premature wear and tear of the pump components.

    • Dial gauge readings are used to adjust the pump and motor positions for proper alig...

  • Answered by AI
  • Q3. What is the safety, In a plant.
  • Ans. 

    Safety in a plant refers to the measures taken to prevent accidents and injuries to workers and damage to equipment.

    • Safety protocols and procedures should be established and followed strictly

    • Workers should be trained on safety measures and provided with appropriate safety gear

    • Regular maintenance and inspection of equipment and machinery

    • Emergency response plans should be in place and practiced

    • Regular safety audits and a...

  • Answered by AI
  • Q4. What is the cooling tower purpose.
  • Ans. 

    Cooling tower is used to remove heat from the water-cooled system and release it into the atmosphere.

    • It is used in industries to cool down the water used in various processes.

    • It works on the principle of evaporation.

    • It helps in conserving water by recycling it.

    • It is commonly used in power plants, chemical plants, and oil refineries.

    • The tower is designed to maximize the contact between air and water to facilitate heat t

  • Answered by AI
  • Q5. What is the centrifugal extranal part name.
  • Ans. 

    The centrifugal external part is called impeller.

    • The impeller is the rotating component of a centrifugal pump.

    • It is responsible for transferring energy from the motor to the fluid being pumped.

    • Examples of centrifugal pumps that use impellers include water pumps, chemical pumps, and sewage pumps.

  • Answered by AI
Round 3 - Group Discussion 

100000

Interview Preparation Tips

Interview preparation tips for other job seekers - Good job in a experience in a subject.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Company Website and was interviewed in Nov 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Questions that are designed to assess your specific knowledge and skills related to the technical aspects of a job.
  • Q2. I have done Apprenticeship fitter in Logging Services in ONGC , Palavasana, Mahesana. (Year-2022-23)

Interview Preparation Tips

Topics to prepare for Oil And Natural Gas Corporation Technician Fitter interview:
  • Fitter
  • Technical
Interview preparation tips for other job seekers - Aim to apply to three to five jobs per week and connect with at least two people daily, even on LinkedIn. Self-care matters: Don't forget to take care of yourself during the job search. Take breaks, eat well, exercise, and make time for activities you enjoy.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Sep 2023. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. Pipe Fittings and erection, supporting work, hydrotest, grinding, torch cutting ,pug cutting, drilling,air testing, numeric test, Nitrogen filling,and mentence work
  • Q2. Sam as par questions
Interview experience
4
Good
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Feb 2023. There were 2 interview rounds.

Round 1 - Case Study 

Checking all pipe lines for crude,petrol,diesel,and other chemicals if present opening automatic and manual valves for release,applying grease on valve gates changing,gaskets, commissioning units for crude processing. Steam vapour water and air, Safety belts, scaffolding,fire extinguishers monitor control room.constructing storage tanks, autocad site plan etc.

Round 2 - Technical 

(5 Questions)

  • Q1. What is the first rule on any industrial zone or sector?
  • Ans. 

    The first rule on any industrial zone or sector is safety first.

    • Safety should always be the top priority in any industrial setting.

    • Workers should be trained on safety procedures and provided with appropriate safety equipment.

    • Regular safety inspections and maintenance should be conducted to identify and address potential hazards.

    • Emergency response plans should be in place to handle any accidents or incidents.

    • Examples of...

  • Answered by AI
  • Q2. What is the goal of every employee or worker?
  • Ans. 

    The goal of every employee or worker is to contribute to the success of the organization and achieve personal growth.

    • To contribute to the success of the organization

    • To achieve personal growth and development

    • To provide value and make a positive impact

    • To maintain job security and financial stability

    • To foster teamwork and collaboration

    • To continuously learn and improve skills

  • Answered by AI
  • Q3. Why is bronze used in most oil and gas units?
  • Ans. 

    Bronze is used in most oil and gas units due to its excellent corrosion resistance, high strength, and thermal conductivity.

    • Bronze has superior corrosion resistance compared to other metals, making it ideal for oil and gas units exposed to harsh environments.

    • It has high strength and can withstand heavy loads and pressure, ensuring the durability and reliability of the units.

    • Bronze also has good thermal conductivity, al...

  • Answered by AI
  • Q4. Why is a fire extinguisher so important?
  • Ans. 

    A fire extinguisher is important because it helps to control and extinguish fires, preventing them from spreading and causing further damage.

    • Fire extinguishers are essential safety devices that can be used to suppress small fires before they become large and uncontrollable.

    • They are designed to release a chemical agent or suppressant that can quickly extinguish flames.

    • Fire extinguishers are crucial in preventing the spr...

  • Answered by AI
  • Q5. Use of Gaskets in a van
  • Ans. 

    Gaskets are used in vans to create a seal between two surfaces, preventing leakage and ensuring proper functioning of various components.

    • Gaskets are typically made of materials like rubber, silicone, or metal.

    • They are used in various parts of a van, such as the engine, transmission, and exhaust system.

    • Gaskets help to prevent fluid or gas leaks, ensuring efficient operation and reducing the risk of damage.

    • Examples of ga...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Dear seekers it's a pleasures sharing my experience with you,every day that we leave our homes for this adventure it's a risk we take and puting in mind that our safety, your safety and that of your families and colleagues solely depends on the efforts time and dedication you put to archive a positive outcome 🫴 In the oil and gas sector there are rules that governs the every day operation that must be respected not just based on an individual but a collective effort from everyone, A clear example from Chernobyl that happened years back in Russia due to negligence caused many lose of life's, aside from all this, your job should be your passion or something that makes you feel happy even when sad, and be rest assured God will handle the rest, Thanks & Good luck®️

Oil Country Tubular Interview FAQs

What are the top questions asked in Oil Country Tubular ITI Fitter interview?

Some of the top questions asked at the Oil Country Tubular ITI Fitter interview -

  1. Experience an job mate Su coolipcast...read more
  2. Iti fitter mechanical.his compu...read more
  3. Colipcastion job tit mechanic...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Shell Interview Questions
4.0
 • 188 Interviews
Jindal Saw Interview Questions
4.0
 • 97 Interviews
ExxonMobil Interview Questions
3.8
 • 68 Interviews
Linde India Interview Questions
4.0
 • 45 Interviews
Adani Gas Interview Questions
3.3
 • 28 Interviews
Welspun Corp Interview Questions
4.1
 • 27 Interviews
Mahanagar Gas Interview Questions
4.3
 • 27 Interviews
View all
Senior Engineer
4 salaries
unlock blur

₹5.2 L/yr - ₹7 L/yr

Deputy Manager
4 salaries
unlock blur

₹8.4 L/yr - ₹11 L/yr

Assistant Engineer
4 salaries
unlock blur

₹2.2 L/yr - ₹2.5 L/yr

HR Manager
3 salaries
unlock blur

₹6.6 L/yr - ₹9.2 L/yr

Company Secretary and Compliance Officer
3 salaries
unlock blur

₹16 L/yr - ₹19 L/yr

Explore more salaries
Compare Oil Country Tubular with

Tenaris

4.7
Compare

Vallourec

4.4
Compare

TMK Group

5.0
Compare

Jindal Saw

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview