I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.
The main reason for belt joint failure is usually due to improper installation or maintenance.
Improper installation of the belt joint, such as incorrect alignment or tensioning
Lack of proper maintenance, leading to wear and tear of the joint
Use of low-quality materials for the joint
Excessive load or stress on the belt joint
Environmental factors like temperature or humidity affecting the joint
The alignment maximum tolerance refers to the maximum allowable deviation from the specified alignment.
Alignment maximum tolerance is the maximum allowable deviation from the specified alignment.
It is typically expressed in terms of a percentage or a specific measurement unit.
For example, a machine part may have an alignment maximum tolerance of +/- 0.005 inches.
Exceeding the alignment maximum tolerance can lead to per
To replace the bucket wheel reclaimer luffing cylinder, follow these steps.
1. Shut down the machine and ensure all power sources are disconnected.
2. Remove any surrounding components that may obstruct access to the luffing cylinder.
3. Use appropriate tools to disconnect the hydraulic hoses and fittings from the cylinder.
4. Support the weight of the cylinder as it is removed to prevent damage to surrounding components.
5...
JSA stands for Job Safety Analysis, focusing on specific job tasks, while HIRA stands for Hazard Identification and Risk Assessment, focusing on overall workplace hazards.
JSA is task-specific, focusing on individual job tasks and potential hazards
HIRA is broader, looking at overall workplace hazards and assessing risks
JSA involves breaking down a job into steps and identifying potential hazards for each step
HIRA involv...
To create a PR in SAP, you can use transaction code ME51N or ME21N.
Use transaction code ME51N to create a purchase requisition in SAP.
Enter the necessary details such as material, quantity, delivery date, etc.
Save the purchase requisition and it will be created in the system.
Alternatively, you can also use transaction code ME21N to create a purchase order directly.
The procedure of pulley replacement involves identifying the faulty pulley, removing the old pulley, installing the new pulley, and testing the system.
Identify the faulty pulley by checking for any signs of wear or damage.
Use appropriate tools to remove the old pulley, such as a pulley puller or wrench.
Install the new pulley by aligning it properly and securing it in place.
Test the system to ensure the new pulley is fu...
PTW stands for Permit to Work, a procedure used to ensure that work is carried out safely in potentially hazardous environments.
PTW is a formal written system used to control certain types of work that are identified as potentially hazardous.
Before starting work, a permit must be obtained from a designated authority.
The permit outlines the work to be done, the hazards involved, and the necessary precautions to be taken...
posted on 30 Nov 2024
I applied via Approached by Company and was interviewed before Dec 2020. There was 1 interview round.
Grid code defines technical requirements for connecting to the grid. Critical path is the longest sequence of tasks determining project duration. Project performance measures how well project objectives are being met.
Grid code sets out technical standards and requirements for connecting power plants to the grid
Critical path is the longest sequence of tasks that determines the overall duration of a project
Project perfor...
Managing clients involves clear communication, setting expectations, building relationships, and delivering results.
Establish clear communication channels with the client to ensure understanding of project goals and timelines
Set realistic expectations and manage client's expectations throughout the project
Build a strong relationship with the client based on trust and transparency
Regularly update the client on project p...
NTPC GE Power Services interview questions for popular designations
Get interview-ready with Top NTPC GE Power Services Interview Questions
I have 5 years of experience in substation maintenance, including incident response and resolution.
Managed regular maintenance schedules for substation equipment
Responded to and resolved incidents such as power outages or equipment failures
Implemented safety protocols to prevent future incidents
Trained team members on proper maintenance procedures
Collaborated with engineers to improve substation efficiency
I applied via Company Website and was interviewed in Jun 2024. There was 1 interview round.
Dm plant testing and Boiler water testing
I applied via Naukri.com and was interviewed before May 2023. There was 1 interview round.
Top trending discussions
Interview experience
based on 271 reviews
Rating in categories
Assistant Manager
142
salaries
| ₹5 L/yr - ₹14.5 L/yr |
Senior Engineer
120
salaries
| ₹4.1 L/yr - ₹10.3 L/yr |
Deputy Manager
72
salaries
| ₹8.5 L/yr - ₹18 L/yr |
Engineer
59
salaries
| ₹3.6 L/yr - ₹8.1 L/yr |
Manager
51
salaries
| ₹9.1 L/yr - ₹26.4 L/yr |
BHEL
Siemens
Thermax Limited
Larsen & Toubro Limited