Filter interviews by
I applied via LinkedIn and was interviewed before May 2022. There were 2 interview rounds.
Top trending discussions
I applied via Company Website and was interviewed in Mar 2024. There was 1 interview round.
I applied via Job Portal
Management of marketing involves creating and implementing strategies to promote products or services.
Identifying target market and customer needs
Developing marketing campaigns and materials
Analyzing market trends and competitor strategies
Measuring and evaluating marketing effectiveness
Collaborating with sales and product development teams
I applied via Job Fair and was interviewed in Mar 2023. There were 2 interview rounds.
Indian wire coloring follows a specific standard for electrical design.
Indian wire coloring is based on the IS 694 standard
As per the standard, the color codes for wires are as follows:
- Phase wires: Red, Yellow, Blue
- Neutral wire: Black
- Earth wire: Green or Green with Yellow stripes
These color codes help in identifying and distinguishing different types of wires in electrical installations.
Green color wire is commonly used for grounding purposes in electrical systems.
Green color wire is used for grounding electrical circuits to prevent electrical shock and protect equipment.
It is typically connected to the ground terminal of an electrical outlet or the grounding bus bar in a distribution panel.
Green color wire is also used for bonding metal parts of electrical equipment and structures to ensure electrica...
A maltmeter is a device used by electrical technicians to measure the malt content in a substance.
A maltmeter is typically used in the brewing industry to measure the malt content in beer or other malt-based beverages.
It works by analyzing the specific gravity of the liquid, which is affected by the amount of malt present.
The maltmeter provides accurate measurements that help ensure the quality and consistency of the f...
Difficult but get prepared to face it
A short circuit can be diagnosed by checking for signs of damage, using a multimeter, and tracing the circuit.
Check for signs of damage such as melted wires or blown fuses
Use a multimeter to test for continuity and resistance
Trace the circuit to locate the point of the short circuit
Isolate the affected area and repair or replace damaged components
Interview experience
Analyst
33
salaries
| ₹4.5 L/yr - ₹6.2 L/yr |
Project Manager
11
salaries
| ₹5 L/yr - ₹11.1 L/yr |
Senior Analyst
11
salaries
| ₹5.7 L/yr - ₹8.2 L/yr |
Assistant Manager
9
salaries
| ₹6 L/yr - ₹9.5 L/yr |
Assistant Officer
8
salaries
| ₹1.8 L/yr - ₹3 L/yr |
Nielsen Holdings
Kantar
GfK MODE
IQVIA