Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Nandivardhan Group Team. If you also belong to the team, you can get access from here

Nandivardhan Group Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Nandivardhan Group Site Engineer Interview Questions and Answers

Updated 3 Jul 2022

Nandivardhan Group Site Engineer Interview Experiences

1 interview found

I applied via Referral and was interviewed in Jun 2022. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. 1)tell me 5 nos of IS code. 2)floor drop. 3) Gypsum activity procedure. 4)gypsum area consumption,density. 5) waterproofing procedure. 6)which area comes in toilet bath. 7)Is code for BBS. 8)kitchen platfo...
  • Ans. 

    A Site Engineer interview with questions on IS codes, floor drop, gypsum activity, waterproofing, kitchen platform size, safety measures, and more.

    • IS codes: IS 456, IS 800, IS 1200, IS 383, IS 10262

    • Floor drop: The difference in height between two adjacent floors

    • Gypsum activity procedure: Mixing gypsum powder with water to form a paste and applying it to the surface

    • Waterproofing procedure: Applying a waterproofing membr...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Show positivity on every answers,if ypu don't know answer then direct say don't know.

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jul 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be honest with your years of experience. All information you share will be verified at the time of joining.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Just construction activities
Round 3 - HR 

(1 Question)

  • Q1. Just Salary negotiations
Round 4 - Behavioral 

(1 Question)

  • Q1. Position and Salary Finalisation

Interview Preparation Tips

Topics to prepare for Ashar group Site Engineer interview:
  • Construction Activity
  • finishing
  • Billing
  • Site Supervision
Interview preparation tips for other job seekers - Just be confident and prompt
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Aug 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Technical questions
Round 3 - Technical 

(1 Question)

  • Q1. Technical questions
Round 4 - HR 

(1 Question)

  • Q1. Salary discussion
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

Written paper as per site and codes

Round 2 - Group Discussion 

It’s about Quality and execution with VP and audit team

Round 3 - HR 

(2 Questions)

  • Q1. Salary discussion
  • Q2. Joining procedures and company policy

Interview Questionnaire 

1 Question

  • Q1. Technical Civil Execution engineering with finishing RCC experience

I applied via Naukri.com and was interviewed before Oct 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Deduction in shuttering criteria
  • Ans. 

    Deduction in shuttering criteria refers to the reduction in the amount of shuttering material used in construction.

    • Deduction in shuttering criteria is done to reduce the cost of construction.

    • It is also done to reduce the time taken for construction.

    • The deduction is usually done based on the strength of the concrete being used.

    • For example, if the concrete strength is high, less shuttering material is required.

    • The deduct...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepared yourself for interview to get selection
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jun 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. How is stone/Tile flooring /Cladding is measured
  • Ans. 

    Stone/Tile flooring/Cladding is measured in square meters or square feet depending on the unit of measurement used.

    • Measure the length and width of the area to be covered with stone/tile flooring/cladding

    • Multiply the length by the width to get the total square meters or square feet

    • Account for any cuts or wastage in the calculation

    • Consider the pattern or design of the flooring/cladding when measuring

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't join their Site billing profile.They suck at their system and there is nothing such Client approach towards the project.It's kind of In-house and chosen vendors for their projects are so bad that site billing will suffer and you will be blamed.

I applied via Job Portal

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. What are you doing this company is looking for an interview.

Interview Preparation Tips

Interview preparation tips for other job seekers - This company is good working condition and new income certificate 👍
Interview experience
1
Bad
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Mar 2022. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. About civil engineering for site and billing Quantity surveying and rate analysis .actual site quantity measurements and check contractor bill and certification
  • Q2. Concrete quantity calculations
  • Q3. As per site and as per drawing calculated

Interview Preparation Tips

Interview preparation tips for other job seekers - No future and no skill and no development and no life balance
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
-

I applied via Walk-in and was interviewed in Mar 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Qty of cement in M25 grade concrete
  • Ans. 

    The quantity of cement in M25 grade concrete is 350 kg/m³.

    • M25 grade concrete has a mix proportion of 1:1:2 (cement:sand:aggregate).

    • The total volume of concrete is taken as 1 m³.

    • Therefore, the quantity of cement required for 1 m³ of M25 grade concrete is 350 kg.

    • This is calculated by multiplying the volume of concrete by the proportion of cement in the mix.

  • Answered by AI
  • Q2. Exact weight of different dia of steel
  • Ans. 

    The weight of steel varies with its diameter.

    • The weight of steel can be calculated using the formula: weight = volume x density

    • The density of steel is approximately 7850 kg/m³

    • The volume of steel can be calculated using the formula: volume = pi x (diameter/2)² x length

    • For example, a 10mm diameter steel rod with a length of 1 meter would weigh approximately 0.393 kg

  • Answered by AI
  • Q3. Process of waterproofing
  • Ans. 

    Waterproofing is the process of making a structure or object resistant to water penetration.

    • Identify the areas that need waterproofing such as roofs, walls, and foundations.

    • Clean and prepare the surface to be waterproofed.

    • Apply a waterproofing membrane or coating such as bituminous, acrylic, or polyurethane.

    • Ensure proper drainage and slope to prevent water accumulation.

    • Test the waterproofing system for leaks and make n...

  • Answered by AI
  • Q4. Conversion of brass to Cum
  • Ans. 

    Conversion of brass to Cum

    • Brass is an alloy of copper and zinc, while Cum is not a known substance

    • It is not possible to convert brass to Cum

    • Perhaps the question is referring to a different substance or material

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Worst management. My interview was scheduled on Friday but on Wednesday they email me to come on Thursday. When I reached the mentioned location in email , i was given another location which was 2-3 km away. However when I reached the venue, interview time was 11 Am but it started at 1. Pm . After interview Hr called and told me that you are selected for so and so position but there will be no hike on your current salary, and you have to come for second round . After 15 days they replied me that you are not selected.

Nandivardhan Group Interview FAQs

How many rounds are there in Nandivardhan Group Site Engineer interview?
Nandivardhan Group interview process usually has 1 rounds. The most common rounds in the Nandivardhan Group interview process are Technical.

Tell us how to improve this page.

Interview Questions from Similar Companies

Pittie Group Interview Questions
2.7
 • 17 Interviews
Ambience Group Interview Questions
3.3
 • 16 Interviews
91springboard Interview Questions
3.7
 • 11 Interviews
Reliable Spaces Interview Questions
2.8
 • 10 Interviews
Ashar group Interview Questions
3.5
 • 9 Interviews
Isprava Interview Questions
3.4
 • 8 Interviews
Akshaya Interview Questions
3.6
 • 7 Interviews
View all
Nandivardhan Group Site Engineer Salary
based on 6 salaries
₹3 L/yr - ₹4.8 L/yr
17% more than the average Site Engineer Salary in India
View more details
Site Engineer
6 salaries
unlock blur

₹3 L/yr - ₹4.8 L/yr

Billing Engineer
6 salaries
unlock blur

₹2.4 L/yr - ₹2.8 L/yr

Senior Manager
5 salaries
unlock blur

₹11 L/yr - ₹16 L/yr

Store Keeper
5 salaries
unlock blur

₹3.7 L/yr - ₹4.2 L/yr

HR Manager
4 salaries
unlock blur

₹7 L/yr - ₹10 L/yr

Explore more salaries
Compare Nandivardhan Group with

Signature Global

4.0
Compare

Pittie Group

2.7
Compare

Advance India Projects

3.6
Compare

Vestian Global Workplace Services

3.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview