i
Nandan Petrochem
Filter interviews by
I applied via Walk-in and was interviewed before Oct 2021. There were 2 interview rounds.
QA is quality assurance, QAP is quality assurance plan, and Kaizen is continuous improvement.
QA is the process of ensuring that a product or service meets the required quality standards.
QAP is a document that outlines the quality assurance procedures to be followed for a project.
Kaizen is a Japanese term that means continuous improvement. It involves making small, incremental changes to improve processes and products.
E...
6S is a methodology for workplace organization and standardization. QC focuses on identifying defects, while QA focuses on preventing defects.
6S stands for Sort, Set in Order, Shine, Standardize, Sustain, and Safety.
QC (Quality Control) is a reactive process that focuses on identifying and correcting defects in a product or service.
QA (Quality Assurance) is a proactive process that focuses on preventing defects by ensu...
Six Sigma is a data-driven methodology used to improve business processes by reducing defects and variability. PDCA is a continuous improvement cycle.
Six Sigma aims to achieve a process that produces only 3.4 defects per million opportunities.
It involves five phases: Define, Measure, Analyze, Improve, and Control (DMAIC).
PDCA stands for Plan, Do, Check, Act and is a continuous improvement cycle used in quality manageme...
PDCA is a continuous improvement cycle consisting of Plan, Do, Check, and Act. Poka Yoke is a mistake-proofing technique to prevent errors.
PDCA is a problem-solving method used to improve processes and products
Plan: Identify the problem and plan a solution
Do: Implement the solution on a small scale
Check: Evaluate the results and analyze the data
Act: Standardize the solution and implement it on a larger scale
Poka Yoke i...
VSM stands for Value Stream Mapping and SMED stands for Single Minute Exchange of Die.
VSM is a lean manufacturing tool used to analyze and improve the flow of materials and information required to bring a product or service to a customer.
SMED is a lean manufacturing technique used to reduce the time it takes to perform a setup or changeover on a machine.
VSM and SMED are both used to eliminate waste and improve efficien...
Top trending discussions
posted on 3 May 2022
I applied via Naukri.com and was interviewed before May 2021. There was 1 interview round.
Various types of valves are used in chemical industries for different purposes.
Gate valves are commonly used in chemical industries for on/off control of flow.
Globe valves are used for regulating flow and controlling pressure.
Ball valves are suitable for high-pressure applications and provide tight shut-off.
Butterfly valves are used for throttling and controlling flow.
Diaphragm valves are used for handling corrosive an...
I'm sorry, but I don't understand the question. Could you please rephrase it?
Please clarify the question
Provide more context
Specify what you mean by 'handle line' and 'associate'
I need more information to answer this question
Who r uu ,how do it,
You are solve any problem
Quality circle
GK
Coding test oil
posted on 25 Jul 2024
I applied via Walk-in and was interviewed before Jul 2023. There were 2 interview rounds.
Question Related to Diploma Mechanical engineering
Experienced production executive with a background in managing film and television projects.
Over 10 years of experience in the entertainment industry
Strong leadership and organizational skills
Proven track record of successfully delivering high-quality productions on time and within budget
Managed a team of production staff and crew on various projects
Collaborated with directors, writers, and other key stakeholders to en
I have 5 years of experience as a Production Executive at XYZ Company.
Managed production schedules and ensured timely delivery of products.
Implemented cost-saving measures resulting in a 10% reduction in production expenses.
Led a team of 20 production staff members and provided training and guidance.
Collaborated with other departments to streamline production processes and improve efficiency.
I have 10 years of experience in production management roles.
Started as a production assistant and worked my way up to production manager
Managed teams to meet production goals and deadlines
Implemented process improvements to increase efficiency and reduce costs
Collaborated with other departments to ensure smooth production flow
posted on 16 Feb 2024
I was interviewed in Jan 2024.
I was interviewed in Apr 2017.
My favourite sportsperson is Serena Williams.
Serena Williams is a professional tennis player
She has won numerous Grand Slam titles
She is known for her powerful serve and aggressive playing style
Crude oil is separated from water through a process called oil-water separation.
Oil-water separation is achieved by using various techniques such as gravity separation, centrifugation, and filtration.
Gravity separation involves allowing the mixture of crude oil and water to settle, with the oil rising to the top due to its lower density.
Centrifugation utilizes the centrifugal force to separate the oil and water by spin...
I was interviewed in Apr 2017.
I was interviewed before Jul 2016.
I applied via Referral and was interviewed before Jul 2021. There were 3 interview rounds.
General information about electronic products which is used in daily life and technical questions related about the electronic equipments.
Executive Production
21
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Supervisor
19
salaries
| ₹0 L/yr - ₹0 L/yr |
Executive
18
salaries
| ₹0 L/yr - ₹0 L/yr |
QC Executive
18
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
16
salaries
| ₹0 L/yr - ₹0 L/yr |
Reliance Industries
Indian Oil Corporation
Bharat Petroleum
Hindustan Petroleum