Filter interviews by
I appeared for an interview before Apr 2023.
BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars in a structural element.
BBS stands for Bar Bending Schedule
It is a detailed list of reinforcement bars in a structural element
It includes information like bar size, number of bars, length, shape, and placement
Concrete cube size refers to the dimensions of the cubes used for testing the compressive strength of concrete.
Standard concrete cube sizes are 150mm x 150mm x 150mm or 100mm x 100mm x 100mm.
These cubes are cast and cured for a specified period before being tested in a compression machine.
The compressive strength of concrete is determined by testing these cubes.
Different cube sizes may be used for specific projects or
Top trending discussions
Google Sheets is a cloud-based spreadsheet program offered by Google as part of the Google Drive office suite.
Allows users to create and edit spreadsheets online
Offers collaboration features for real-time editing and commenting
Can import and export various file formats, including Microsoft Excel
Offers add-ons and scripts for automation and customization
Accessible from any device with internet connection
MDD & OMC are important parameters for soil compaction and moisture content.
MDD stands for Maximum Dry Density, which is the maximum density that can be achieved for a given soil compaction effort.
OMC stands for Optimum Moisture Content, which is the moisture content at which the maximum dry density can be achieved.
These parameters are important for determining the appropriate moisture content and compaction effort for...
The velocity of steel varies depending on the type and conditions.
The velocity of steel can range from 5000 to 6000 meters per second
The velocity of steel can be affected by factors such as temperature and pressure
The velocity of steel is important in industries such as construction and manufacturing
The cube test result in 7 days depends on the purpose of the test and the specific cube being tested.
The cube test can refer to various tests in different fields such as construction, engineering, and materials science.
For example, in construction, the cube test is used to determine the compressive strength of concrete cubes after 7 days of curing.
The result of the cube test can vary depending on factors such as the ty...
It was just a aptitude test
Managed a team to implement a new customer relationship management system
Led a team of 5 employees to successfully implement a new CRM system
Coordinated with IT department to ensure smooth integration of the system
Provided training to staff on how to use the new system effectively
I want to join the firm because of its strong reputation, opportunities for growth, and alignment with my career goals.
Strong reputation in the industry
Opportunities for career growth and development
Alignment with my career goals and values
I applied via Approached by Company and was interviewed before Apr 2021. There was 1 interview round.
I applied via Referral and was interviewed before May 2021. There were 3 interview rounds.
I received a video call link and in that link will get the accounting basic questions for that we have to answer after a beep.
I applied via Naukri.com and was interviewed in Jan 2021. There were 4 interview rounds.
Yes, I have experience in handling RVNL projects.
I have previously managed a similar railway project
I am familiar with the processes and regulations involved
I have a strong team to support me
I am confident in my ability to deliver the project on time and within budget
posted on 2 May 2021
posted on 1 Jun 2021
I applied via Walk-in and was interviewed in Feb 2021. There were 3 interview rounds.
posted on 28 Sep 2021
I applied via Naukri.com and was interviewed in Mar 2021. There was 1 interview round.
based on 1 interview
Interview experience
based on 20 reviews
Rating in categories
Civil Site Engineer
5
salaries
| ₹1.2 L/yr - ₹5 L/yr |
Project Manager
4
salaries
| ₹18.6 L/yr - ₹24 L/yr |
Structural Engineer
4
salaries
| ₹1.7 L/yr - ₹5 L/yr |
Accounts Manager
4
salaries
| ₹5.6 L/yr - ₹7.2 L/yr |
Store Keeper
4
salaries
| ₹1.8 L/yr - ₹3.6 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Megha Engineering & Infrastructures