Filter interviews by
I appeared for an interview in Mar 2025, where I was asked the following questions.
posted on 21 Mar 2025
I appeared for an interview before Mar 2024, where I was asked the following questions.
I applied via Naukri.com and was interviewed in Sep 2023. There were 2 interview rounds.
I have completed various projects at NWDA related to business development.
Developed new business strategies to increase revenue
Identified potential clients and formed partnerships
Analyzed market trends and competitor activities
Implemented marketing campaigns to promote products/services
Some problems of irrigation projects include water scarcity, inefficient water distribution, environmental impact, and maintenance issues.
Water scarcity leading to insufficient supply for irrigation needs
Inefficient water distribution systems causing uneven water distribution
Environmental impact such as soil salinization and water pollution
Maintenance issues like clogging of irrigation channels or equipment breakdowns
The latest model for solving sewage and drainage problems involves implementing green infrastructure solutions such as rain gardens and permeable pavement.
Green infrastructure solutions help manage stormwater runoff by allowing water to infiltrate into the ground instead of overwhelming sewer systems.
Examples of green infrastructure include rain gardens, bioswales, permeable pavement, and green roofs.
These solutions ca...
Currently involved in large-scale irrigation projects in rural areas
Implementing drip irrigation systems to conserve water
Utilizing solar-powered pumps for efficient water distribution
Working with local communities to educate on sustainable irrigation practices
posted on 7 Dec 2024
Over all performance
Project work related
MSV International interview questions for popular designations
I applied via Referral and was interviewed in May 2022. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed before Apr 2019. There was 1 interview round.
Transmission lines should be laid at a distance from the centre line of roads based on pavement width to ensure safety and efficiency.
Transmission lines should be laid at a distance that allows for safe maintenance and operation without interfering with road traffic.
For roads with narrow pavement width, transmission lines should be placed further away from the centre line to avoid potential hazards.
In contrast, for roa...
Top trending discussions
I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.
The neutral axis is the line where the stress is zero in a reinforced concrete structure.
The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.
The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.
The position of the neutral axis affects the amount of reinforcement required in the tension zone.
The n...
I applied via Walk-in and was interviewed before Mar 2021. There were 2 interview rounds.
I applied via Campus Placement and was interviewed in Apr 2024. There was 1 interview round.
I am from a small town in the Midwest and I am passionate about environmental conservation.
I grew up in a close-knit community in the Midwest
I have always been interested in protecting the environment
I enjoy outdoor activities like hiking and gardening
I have a Bachelor's degree in Computer Science from XYZ University.
Bachelor's degree in Computer Science
Graduated from XYZ University
Specialized in software development
Some of the top questions asked at the MSV International interview for experienced candidates -
based on 3 interviews
Interview experience
based on 119 reviews
Rating in categories
Assistant Highway Engineer
20
salaries
| ₹3 L/yr - ₹6.1 L/yr |
Quantity Surveyor
16
salaries
| ₹3.6 L/yr - ₹10.5 L/yr |
Assistant Bridge Engineer
14
salaries
| ₹3.6 L/yr - ₹7.2 L/yr |
Assistant Highway Maintenance Engineer
11
salaries
| ₹3.6 L/yr - ₹4.8 L/yr |
Civil Site Engineer
10
salaries
| ₹2.2 L/yr - ₹3.1 L/yr |
GAMMON INDIA
McNally Bharat Engineering
ABCI Infrastructures
Military Engineer Services