I applied via Company Website and was interviewed before Dec 2021. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Which principal Transformers work.
  • Ans. 

    Transformers work on the principle of electromagnetic induction.

    • Transformers work on the principle of mutual induction between two coils.

    • The primary coil induces a magnetic field which in turn induces a voltage in the secondary coil.

    • Transformers are used to step up or step down voltage levels in electrical systems.

    • Examples of transformers include power transformers, distribution transformers, and instrument transformer

  • Answered by AI
  • Q2. About HT,LT,MCC, DC GENERATOR Transform.

Interview Preparation Tips

Interview preparation tips for other job seekers - This what i know.Becaus I had worked in power generation company.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Approached by Company and was interviewed in Dec 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Electrical questions
  • Q2. Technical

Interview Preparation Tips

Topics to prepare for Adani Group Electrical Engineer interview:
  • Electrical Maintenance
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Technical stuff
Round 2 - Technical 

(1 Question)

  • Q1. Technical stuff related to current job
Round 3 - HR 

(2 Questions)

  • Q1. Background and about your self
  • Q2. Why looking for change
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

About General knowledge Electrical related

Round 2 - Group Discussion 

Projects, HT< line

Round 3 - Technical 

(1 Question)

  • Q1. EHV line & substations & 100MVA transforms, breakers&CT&PT's and Wind power plant related
Round 4 - One-on-one 

(1 Question)

  • Q1. Electrical Techincal wind power plant EHV&HT&BOP related

Interview Preparation Tips

Interview preparation tips for other job seekers - Dear sir/madam,
I have searching for vacancys
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Sep 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(4 Questions)

  • Q1. Any questions in MPPTCL
  • Q2. Any questions in madhya Pradesh power transmission company limited
  • Q3. Madhya Pradesh power transmission company limited
  • Q4. Anything in substation
  • Ans. 

    A substation is a part of an electrical generation, transmission, and distribution system that transforms voltage levels.

    • Substations are used to control and distribute electrical power.

    • They contain transformers to change voltage levels.

    • Substations may have circuit breakers to protect against faults.

    • They can be indoor or outdoor installations.

    • Substations play a crucial role in the power grid.

    • Examples of substations incl...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - 220/132/33/11kv substation operating system
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Newspaper Ad and was interviewed in Jul 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Aptitude Test 

Returned test about Electrical field

Round 3 - Technical 

(2 Questions)

  • Q1. Technical assessments done
  • Q2. About breaker type of breaker fuses and type of fuse etc
Round 4 - HR 

(2 Questions)

  • Q1. Discussed about certificates ans salary package
  • Q2. About salary package
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jun 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. What is the use of star delta connection
  • Ans. 

    Star delta connection is used in electrical engineering to reduce starting current and torque in induction motors.

    • Reduces starting current by starting the motor in star connection and then switching to delta connection

    • Reduces starting torque to prevent mechanical stress on the motor

    • Commonly used in applications where high starting current or torque could be damaging, such as large industrial motors

  • Answered by AI
  • Q2. What do you do before starting electrical activity
  • Ans. 

    Before starting electrical activity, I ensure all safety precautions are in place and equipment is functioning properly.

    • Perform a safety check on all equipment and tools

    • Verify that all connections are secure and wires are properly insulated

    • Double check the circuit design and calculations for accuracy

    • Ensure proper grounding is in place to prevent electrical hazards

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Don' giveup
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Sep 2023. There was 1 interview round.

Round 1 - Case Study 

Electrical engineering

Interview Preparation Tips

Topics to prepare for Uttar Pradesh Power Corporation Electrical Engineer interview:
  • Substitution
  • Power System
  • Power Transmission
  • Switch gear
  • Operations
  • Supply Chain
  • Distribution
  • Distribution Network
Interview preparation tips for other job seekers - Good job
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. All electrical ralated questions
  • Q2. Motor transformer panel circuit all related equipment
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed in Dec 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. FGD plant DDCMIS DCS control of FGD plant.
  • Q2. Electrical system

MPPGCL Interview FAQs

How many rounds are there in MPPGCL ITI Electrician, Electrical Maintenance interview for experienced candidates?
MPPGCL interview process for experienced candidates usually has 2 rounds. The most common rounds in the MPPGCL interview process for experienced candidates are Resume Shortlist and Technical.
What are the top questions asked in MPPGCL ITI Electrician, Electrical Maintenance interview for experienced candidates?

Some of the top questions asked at the MPPGCL ITI Electrician, Electrical Maintenance interview for experienced candidates -

  1. Which principal Transformers wo...read more
  2. About HT,LT,MCC, DC GENERATOR Transfo...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 MPPGCL interview
Company Website
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

Adani Power Interview Questions
4.0
 • 201 Interviews
Adani Group Interview Questions
3.9
 • 175 Interviews
NTPC Interview Questions
4.2
 • 158 Interviews
Tata Power Interview Questions
3.9
 • 158 Interviews
Torrent Power Interview Questions
3.8
 • 123 Interviews
Suzlon Group Interview Questions
4.1
 • 123 Interviews
Eaton Corporation Interview Questions
4.0
 • 115 Interviews
BHEL Interview Questions
4.2
 • 104 Interviews
GE Vernova Interview Questions
4.1
 • 87 Interviews
Vestas Interview Questions
4.3
 • 81 Interviews
View all
Assistant Engineer
6 salaries
unlock blur

₹10 L/yr - ₹15.5 L/yr

Junior Engineer
5 salaries
unlock blur

₹3.2 L/yr - ₹5.5 L/yr

Computer Operator
5 salaries
unlock blur

₹0.9 L/yr - ₹4.8 L/yr

Executive Engineer
4 salaries
unlock blur

₹9 L/yr - ₹12 L/yr

Junior Mechanical Engineer
4 salaries
unlock blur

₹0.3 L/yr - ₹12 L/yr

Explore more salaries
Compare MPPGCL with

NTPC

4.2
Compare

Tata Power

3.9
Compare

Adani Power

4.0
Compare

Reliance Power

4.1
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview