Filter interviews by
I applied via Referral and was interviewed before Dec 2020. There were 3 interview rounds.
Sales is the process of selling products or services to customers in exchange for money or other valuable considerations.
Sales involves identifying potential customers and persuading them to make a purchase.
It includes activities such as prospecting, lead generation, product demonstration, negotiation, and closing deals.
Sales can be conducted through various channels like direct selling, online platforms, retail stores...
I applied via Referral and was interviewed before Apr 2021. There were 2 interview rounds.
posted on 28 Feb 2025
Current CTC refers to the total compensation package an employee receives, including salary and benefits.
CTC stands for Cost to Company, which includes all expenses incurred by the employer.
It encompasses basic salary, allowances, bonuses, and benefits like health insurance.
For example, if your basic salary is $50,000, and you receive $10,000 in bonuses and $5,000 in benefits, your CTC would be $65,000.
Understanding yo...
I applied via Naukri.com and was interviewed in Jun 2020. There were 3 interview rounds.
Arial cable is a type of cable used for transmitting audio and video signals.
Arial cable is commonly used in television broadcasting and home theater systems.
It is designed to transmit high-quality audio and video signals over long distances.
The cable is made up of multiple wires and is shielded to prevent interference from other electronic devices.
It is often used in conjunction with other cables, such as HDMI or coax...
Unormode cable is required for Ariel section.
Unormode cable is a type of cable that is used for high voltage transmission.
It is designed to withstand extreme weather conditions and is suitable for use in aerial sections.
The cable is made up of multiple layers of insulation and is highly resistant to damage.
Examples of applications where unormode cable is used include power transmission lines, wind turbines, and solar p
posted on 1 Apr 2023
I applied via Approached by Company and was interviewed before Apr 2022. There were 2 interview rounds.
To improve network availability in 4G architecture, we can implement redundancy, load balancing, and network optimization techniques.
Implementing redundancy by adding backup components such as routers, switches, and servers to ensure network availability in case of failure.
Load balancing can be achieved by distributing network traffic across multiple servers to prevent overloading of a single server.
Network optimizatio...
SMPS stands for Switched Mode Power Supply. It converts AC to DC voltage using high-frequency switching.
SMPS uses a high-frequency switching circuit to convert AC to DC voltage
It is more efficient than traditional linear power supplies
New rollouts can be deployed by following a structured project management approach
This includes planning, testing, and implementation phases
Regular communication with stakeholders is impo
One problem faced in the operation of network is frequent network outages.
Frequent network outages disrupt the workflow and productivity.
It leads to communication breakdown and delays in completing tasks.
Network outages can result in loss of important data and affect customer satisfaction.
Troubleshooting network issues takes time and resources.
Implementing backup systems and redundancy can help mitigate the impact of n
posted on 25 May 2022
I applied via Naukri.com and was interviewed before May 2021. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in Jul 2019. There were 5 interview rounds.
I applied via LinkedIn and was interviewed before Apr 2023. There were 3 interview rounds.
Java Collections - Hash map and Hash table.
Stakeholder management and escalation/conflict management.
I applied via LinkedIn and was interviewed before Aug 2022. There were 2 interview rounds.
Cloud project implementation challenges include security concerns, integration issues, and lack of expertise.
Security concerns related to data privacy and compliance regulations
Integration issues with existing systems and applications
Lack of expertise in cloud technologies and best practices
Cost management and budget constraints
Data migration and transfer challenges
Vendor lock-in and interoperability issues
based on 1 review
Rating in categories
Manager
7
salaries
| ₹10 L/yr - ₹11.5 L/yr |
HSE Specialist
6
salaries
| ₹5 L/yr - ₹6.3 L/yr |
Assistant Manager
5
salaries
| ₹6 L/yr - ₹10.9 L/yr |
Assistant Manager HSE
5
salaries
| ₹6.8 L/yr - ₹9.7 L/yr |
HSE Manager
5
salaries
| ₹11.3 L/yr - ₹14 L/yr |
Ericsson
Nokia
BT Group
Verizon