Filter interviews by
posted on 28 Jun 2024
I applied via Recruitment Consulltant and was interviewed before Jun 2023. There was 1 interview round.
Top trending discussions
posted on 12 Dec 2024
I applied via Walk-in and was interviewed in Jun 2024. There were 2 interview rounds.
posted on 19 Mar 2024
I applied via Campus Placement
Mechanical engineering technical besis question
I was interviewed in Jan 2025.
Core tools and techniques used in quality engineering include 5 core tools, 7 QC tools, 8D methodology, and the Why-Why analysis.
5 Core Tools: APQP, PPAP, FMEA, MSA, SPC
7 QC Tools: Check sheets, Pareto charts, Cause-and-effect diagrams, Histograms, Scatter diagrams, Control charts, Flowcharts
8D Methodology: Eight disciplines problem solving approach used to identify, correct, and prevent recurring problems
Why-Why Analy...
The role of a company in Design for Manufacturability (DWM) is to ensure that products are designed in a way that makes them easy and cost-effective to manufacture.
Ensuring that product designs are optimized for efficient manufacturing processes
Collaborating with design and manufacturing teams to identify and address potential manufacturing challenges early in the design phase
Implementing design guidelines and best pra...
MSA stands for Measurement System Analysis and SPC stands for Statistical Process Control.
MSA is a method used to assess the measurement system variation to ensure data accuracy.
SPC is a method used to monitor and control a process through statistical analysis.
MSA includes Gage R&R studies to evaluate the measurement system's repeatability and reproducibility.
SPC involves using control charts to detect any variatio...
Process quality refers to the level of consistency, accuracy, and effectiveness in the execution of a particular process.
Process quality is about ensuring that a specific process consistently meets the desired standards and requirements.
It involves identifying and eliminating defects, errors, and variations in the process to improve overall quality.
Process quality can be measured using metrics such as defect rates, cyc...
8D is a problem-solving methodology used in quality management to identify, correct, and prevent recurring problems.
8D stands for 8 disciplines, each representing a step in the problem-solving process
Steps include defining the problem, forming a team, identifying root causes, implementing corrective actions, and preventing recurrence
Example: A manufacturing company uses 8D to address a recurring defect in their product
I applied via Campus Placement and was interviewed in Sep 2024. There were 3 interview rounds.
Quality Engineers need to have strong skills in process improvement and problem-solving.
Strong understanding of quality control processes
Ability to analyze data and identify areas for improvement
Experience with root cause analysis techniques
Knowledge of statistical tools and methods
Effective communication skills to work with cross-functional teams
Team management involves leading, motivating, and coordinating a group of individuals to achieve common goals.
Effective communication is key in team management
Setting clear goals and expectations for team members
Providing support and resources to help team members succeed
Recognizing and rewarding team members for their contributions
Resolving conflicts and addressing issues within the team
Encouraging collaboration and f
Rules company is a term used to describe the set of guidelines and regulations that a company follows in order to ensure quality and compliance.
Rules company refers to the policies, procedures, and standards that govern the operations of a company.
These rules are put in place to ensure consistency, quality, and compliance with regulations.
Examples of rules company include ISO standards, FDA regulations, and company-spe
I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.
The 7 QC tools are a set of basic statistical tools used for quality control and improvement in manufacturing and service industries.
Check sheet: Used to collect and organize data in a systematic way.
Histogram: Represents data distribution visually.
Pareto chart: Helps identify the most significant factors contributing to a problem.
Cause-and-effect diagram (Ishikawa or fishbone diagram): Identifies potential causes of a...
5S is a methodology used to organize a workplace for efficiency and effectiveness by identifying, sorting, setting in order, shining, and sustaining.
Sort: Remove unnecessary items from the workplace
Set in order: Organize remaining items in a logical manner
Shine: Clean and inspect the workplace regularly
Standardize: Establish procedures and schedules for maintaining the first 3 S's
Sustain: Ensure the practices are consi...
4M is a method used in quality management to identify and address potential issues in a process.
4M stands for Man, Machine, Material, and Method.
It is used to analyze and improve processes by considering the impact of these four factors.
For example, in manufacturing, 4M can help identify if a quality issue is due to human error, machine malfunction, material defects, or the method of production.
TPM stands for Total Productive Maintenance, a proactive approach to maintenance involving all employees to improve equipment effectiveness.
TPM focuses on maximizing equipment effectiveness through proactive maintenance
The pillars of TPM include autonomous maintenance, planned maintenance, quality maintenance, focused improvement, early equipment management, and training & education
Example: Implementing autonomous main...
JH stands for Job Hazard Analysis, a process used to identify and mitigate potential hazards in the workplace.
JH is a systematic process for identifying potential hazards in a job task or process.
It involves breaking down the job into steps, identifying potential hazards at each step, and implementing controls to mitigate those hazards.
Examples of hazards that may be identified through JH include exposure to harmful ch...
I applied via Company Website and was interviewed in Aug 2024. There were 2 interview rounds.
Department of quality (PDI Quality)
Pre dispatch audit , testing , kitting etc.
posted on 3 Apr 2024
I applied via Company Website and was interviewed in Mar 2024. There were 2 interview rounds.
Quality inspector fainal lain part cheking
Standard online aptitude tests with some written questions
Group assessment day, lasted 4 hours, group tasks followed by one-on-one
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Production Engineer
49
salaries
| ₹2 L/yr - ₹4 L/yr |
Engineer
46
salaries
| ₹2.2 L/yr - ₹5 L/yr |
Quality Engineer
44
salaries
| ₹2.2 L/yr - ₹3.8 L/yr |
Senior Engineer
24
salaries
| ₹3.5 L/yr - ₹5.1 L/yr |
Graduate Engineer Trainee (Get)
14
salaries
| ₹1.6 L/yr - ₹3 L/yr |
Flipkart
Amazon
Paytm Mall
Snapdeal