Filter interviews by
I applied via Referral and was interviewed in Aug 2023. There were 2 interview rounds.
1 inch = 2.54 cm, 1 cm = 0.39 inch, 1 mm = 0.039 inch
1 inch is equal to 2.54 centimeters
1 centimeter is equal to 0.39 inches
1 millimeter is equal to 0.039 inches
Instruments name and its least count are essential for accurate measurements in quality engineering.
Vernier caliper - 0.02 mm
Micrometer - 0.01 mm
Dial indicator - 0.01 mm
Height gauge - 0.02 mm
Our company policy focuses on continuous improvement, customer satisfaction, and adherence to quality standards.
Continuous improvement is encouraged through regular training and feedback sessions.
Customer satisfaction is a top priority, with a focus on meeting and exceeding customer expectations.
Adherence to quality standards is mandatory to ensure product reliability and safety.
ISO:9001:2016 & IATF 16949 are quality management system standards. GD&T symbols are used in engineering drawings for precise communication.
ISO:9001:2016 is a standard for quality management systems, focusing on meeting customer requirements and continuous improvement.
IATF 16949 is a standard specifically for the automotive industry, emphasizing defect prevention and reduction of variation.
GD&T symbols are geometric di...
Top trending discussions
I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.
Process engineering involves designing, optimizing, and managing industrial processes to improve efficiency and productivity.
Process engineering focuses on analyzing and improving processes in various industries such as manufacturing, chemical, and pharmaceutical.
It involves identifying bottlenecks, reducing waste, and implementing process improvements to enhance productivity.
Process engineers use tools like process fl...
cp and pp are both commands in Unix-like operating systems, but they have different functionalities.
cp stands for 'copy' and is used to copy files or directories from one location to another.
pp stands for 'print and pause' and is used to print files with pagination, pausing after each page.
cp can be used to create a duplicate of a file or directory, while pp is used for printing files in a controlled manner.
Example: cp...
A control plan is a documented procedure that outlines the steps and measures taken to ensure quality and consistency in a manufacturing process.
Control plans are commonly used in industries such as automotive, aerospace, and electronics.
They include details on the process steps, key characteristics, measurement methods, and acceptable tolerances.
Control plans help identify potential risks, prevent defects, and ensure ...
SMED stands for Single Minute Exchange of Die. It is a lean manufacturing technique used to reduce the time it takes to change over a production process.
SMED is used to minimize downtime during changeovers
It focuses on separating internal and external setup tasks
The goal is to convert as many internal setup tasks to external setup tasks
By reducing setup time, production flexibility and efficiency are improved
Capex stands for capital expenditure, which refers to the funds used by a company to acquire, upgrade, or maintain physical assets.
Capex is an investment made by a company to purchase or improve long-term assets such as buildings, equipment, or technology.
It is different from operational expenses (opex) which are ongoing costs to run the business.
Capex is typically planned and budgeted for in advance.
Examples of capex ...
posted on 14 Dec 2021
I applied via Walk-in and was interviewed before Dec 2020. There were 3 interview rounds.
The diameter of what? Please provide more context.
Please provide more information about what you are referring to.
Without context, it is impossible to answer this question.
Are you asking about the diameter of a specific object or component?
Please clarify your question so I can provide an accurate answer.
posted on 10 Apr 2022
I applied via Recruitment Consulltant and was interviewed before Apr 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Oct 2022. There were 3 interview rounds.
Technical,skill development program
I appeared for an interview in Sep 2024, where I was asked the following questions.
The first was a technical screening, where I was asked to solve coding problems on a shared platform. The questions tested my ability to think on my feet, focusing on optimizing solutions and writing clean, maintainable code.
This was more interactive, involving a whiteboard session where I had to design a system from scratch. The interviewer challenged my assumptions and pushed me to consider edge cases, scalability, and performance. It was intense, but it made me appreciate the importance of clear, structured thinking.
posted on 18 Jan 2023
I applied via Company Website and was interviewed in Dec 2022. There were 4 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Jul 2024. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in Mar 2021. There were 3 interview rounds.
SAP is an enterprise resource planning software used for managing business operations and customer relations.
SAP stands for Systems, Applications, and Products in Data Processing
It is used by companies to manage their business operations such as finance, sales, procurement, and inventory management
SAP also offers customer relationship management (CRM) software to manage interactions with customers
It is widely used in i...
I use various Tcodes depending on the task at hand.
For material master data maintenance, I use MM01, MM02, and MM03.
For purchase order creation and maintenance, I use ME21N and ME22N.
For inventory management, I use MIGO and MB51.
For production planning, I use MD61 and MD04.
For quality management, I use QA32 and QE51.
For sales and distribution, I use VA01, VA02, and VA03.
To punch production in SAP, follow these steps:
Create a production order in SAP
Release the production order
Confirm the production order
Perform goods receipt for the production order
Perform goods issue for the production order
based on 1 interview
Interview experience
based on 11 reviews
Rating in categories
Quality Engineer
33
salaries
| ₹1.4 L/yr - ₹3.2 L/yr |
Design Engineer
24
salaries
| ₹1.2 L/yr - ₹3.1 L/yr |
Production Engineer
24
salaries
| ₹1.5 L/yr - ₹3.7 L/yr |
Production Supervisor
13
salaries
| ₹1.2 L/yr - ₹4 L/yr |
Quality Inspector
12
salaries
| ₹1.2 L/yr - ₹2.5 L/yr |
Knorr-Bremse
Greaves Cotton
Sanden Vikas
Victora Auto Private Limited