I applied via LinkedIn and was interviewed in Apr 2023. There were 3 interview rounds.
Top trending discussions
I applied via Naukri.com and was interviewed in Apr 2022. There were 2 interview rounds.
The sequence of toilet finishes refers to the order in which different materials and fixtures are installed in a toilet during construction or renovation.
The first step is usually to install the plumbing and drainage system for the toilet.
Next, the walls and floors are prepared and waterproofed.
After that, the fixtures such as toilets, sinks, and urinals are installed.
Following the installation of fixtures, the walls a...
posted on 5 Aug 2021
posted on 11 Aug 2021
Technical and administrative issues during construction execution and their solutions
Technical issues: delays due to weather, equipment breakdowns, design changes. Solutions: contingency plans, regular maintenance, clear communication with stakeholders
Administrative issues: budget constraints, permit delays, labor shortages. Solutions: cost-saving measures, proactive permit applications, subcontracting
Effective project...
The quantity of piping done at our location and the total duration for completion varied depending on the project.
The quantity of piping done at our location ranged from project to project.
The total duration for completion also varied based on the size and complexity of the project.
For example, in one project, we installed approximately 10,000 feet of piping, which took us around 6 months to complete.
In another project...
Answering questions on types of valves, hydrotesting pressure in pipe lines, and units of pressure and their conversions.
Types of valves include gate, globe, ball, butterfly, and check valves.
Hydrotesting pressure is the pressure used to test the strength and integrity of a pipeline.
Units of pressure include psi, bar, kPa, and MPa.
Conversions between units of pressure can be done using conversion factors.
For example, 1
posted on 15 Sep 2023
I applied via Newspaper Ad and was interviewed before Sep 2022. There were 2 interview rounds.
posted on 21 Jan 2022
I applied via Walk-in and was interviewed before Jan 2021. There were 4 interview rounds.
posted on 25 Dec 2023
I applied via Naukri.com and was interviewed before Dec 2022. There were 3 interview rounds.
Past Projects details to explain,
We used bored pile foundation method in our previous project.
Bored pile foundation method was used for piling in the previous project.
The method involved drilling a hole into the ground and filling it with concrete and steel reinforcement.
Bored pile foundation is commonly used for high-rise buildings and structures requiring deep foundations.
The pile rig task of a Rig Mech involves operating and maintaining equipment used for driving piles into the ground.
Operating pile driving equipment efficiently
Maintaining and repairing equipment as needed
Ensuring safety protocols are followed during pile driving operations
The density of a polymer refers to its mass per unit volume.
Density of a polymer is typically measured in grams per cubic centimeter (g/cm^3).
The density of a polymer can vary depending on factors such as its chemical composition and structure.
For example, the density of polyethylene can range from 0.91 to 0.96 g/cm^3.
Higher density polymers tend to be more rigid and have higher melting points.
The viscosity of polymer before pile boring, pH value before boring, and water test details are important factors in construction management.
Viscosity of polymer should be within specified range to ensure proper drilling and stability of the pile.
The pH value of the water should be neutral (around 7) to prevent corrosion of the equipment and ensure the effectiveness of the polymer.
Water test details should include para...
posted on 2 Feb 2025
I was interviewed in Jan 2025.
posted on 6 May 2022
I applied via Approached by Company and was interviewed in Nov 2021. There were 3 interview rounds.
based on 1 interview
Interview experience
QA QC Engineer
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Draughtsman Mechanical
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Piping Designer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
HSE Officer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Water Treatment Plant Operator
4
salaries
| ₹0 L/yr - ₹0 L/yr |
VA Tech Wabag
Ion Exchange India
Thermax Limited
Triveni Engineering & Industries