Upload Button Icon Add office photos

Filter interviews by

Mesura Nirmal Gas Controls Lead Engineer Interview Questions and Answers

Updated 13 Apr 2020

Mesura Nirmal Gas Controls Lead Engineer Interview Experiences

1 interview found

Lead Engineer Interview Questions & Answers

user image Anonymous

posted on 13 Apr 2020

Interview Questionnaire 

1 Question

  • Q1. What is role & responsibility , skill you have to take action while machine setup & system development ( as I am the candidate of lean engineer ) .

Interview Preparation Tips

Interview preparation tips for other job seekers - Introduces your role & responsibility along with skill while introducing your self please ensure skill which are you mention are actually used by you while problem solving.
& the most important dicussed a project which was solved systematically like DMAIC Concept , using 7 QC tool to prioritized your & to analysis & what are action the control implemented after decide the root cause & action & last one are the - benefit to organization after complete the project.

Interview questions from similar companies

I applied via Referral and was interviewed in Oct 2020. There was 1 interview round.

Interview Questionnaire 

5 Questions

  • Q1. Working procedure of Ultrasonic level transmitter?
  • Ans. 

    Ultrasonic level transmitter uses sound waves to measure the level of liquid or solid in a container.

    • The transmitter sends high-frequency sound waves towards the surface of the liquid or solid.

    • The waves bounce back and are received by the transmitter.

    • The time taken for the waves to return is measured and used to calculate the distance to the surface.

    • The distance is then converted into a level measurement and transmitte...

  • Answered by AI
  • Q2. What is the execution plan during emergency shutdown?
  • Ans. 

    During emergency shutdown, the execution plan involves immediate identification of the problem and taking necessary steps to mitigate it.

    • Identify the cause of the emergency shutdown

    • Initiate the emergency shutdown procedure

    • Isolate the affected equipment or area

    • Notify relevant personnel and authorities

    • Implement emergency response plan

    • Conduct post-shutdown analysis and investigation

  • Answered by AI
  • Q3. How measure the level of a vertical vessel for a magnetic LT calibration ?
  • Ans. 

    Use a magnetic level gauge to measure the level of a vertical vessel for calibration.

    • Install a magnetic level gauge on the vertical vessel.

    • Ensure the gauge is properly calibrated and zeroed.

    • Take readings at various levels and record the corresponding magnetic field strengths.

    • Compare the readings to a calibration curve to determine the actual level of the vessel.

    • Adjust the gauge if necessary and repeat the process until

  • Answered by AI
  • Q4. How prepared a JSA?
  • Ans. 

    A JSA is prepared by identifying potential hazards and developing controls to mitigate them.

    • Identify all potential hazards in the work area

    • Determine the likelihood and severity of each hazard

    • Develop controls to mitigate or eliminate the hazards

    • Communicate the JSA to all workers involved in the job

    • Review and update the JSA as needed

  • Answered by AI
  • Q5. How prepared a RFQ?
  • Ans. 

    Preparing an RFQ involves gathering requirements, creating a detailed scope of work, and identifying potential suppliers.

    • Identify the requirements for the project

    • Create a detailed scope of work

    • Identify potential suppliers and send the RFQ to them

    • Include all necessary information in the RFQ, such as project timeline and budget

    • Review and evaluate the responses from suppliers

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Appearance is your first stroke and always confidence about your answer ,don't answering that one which is your out of your knowledge, admit it .If you are belongs from Electrical or Instrumentation then you must have a little bit knowledge about International code of E&I. I answered almost 80% question ,its all about technical question & management type question .
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Coding Test 

Sliding window leet code style

Round 2 - Assignment 

Computer vision task. Image segmentation

Round 3 - One-on-one 

(2 Questions)

  • Q1. What was the algorithm you used in the task
  • Ans. 

    I used the Random Forest algorithm for the task.

    • Random Forest is an ensemble learning method that builds multiple decision trees and merges them together to get a more accurate and stable prediction.

    • It is commonly used for classification and regression tasks.

    • Example: RandomForestClassifier in scikit-learn library.

  • Answered by AI
  • Q2. What are metrics you can use for this task
  • Ans. 

    Metrics for evaluating machine learning tasks

    • Accuracy

    • Precision

    • Recall

    • F1 Score

    • ROC AUC

    • Confusion Matrix

  • Answered by AI
Round 4 - Technical 

(2 Questions)

  • Q1. A presentation of a past project with followup questions
  • Q2. Some questions on text classification

Skills evaluated in this interview

I applied via Referral and was interviewed in Oct 2020. There was 1 interview round.

Interview Questionnaire 

5 Questions

  • Q1. Working procedure of Ultrasonic level transmitter?
  • Ans. 

    Ultrasonic level transmitter uses sound waves to measure the level of liquid or solid in a container.

    • The transmitter sends high-frequency sound waves towards the surface of the liquid or solid.

    • The waves bounce back and are received by the transmitter.

    • The time taken for the waves to return is measured and used to calculate the distance to the surface.

    • The distance is then converted into a level measurement and transmitte...

  • Answered by AI
  • Q2. What is the execution plan during emergency shutdown?
  • Ans. 

    During emergency shutdown, the execution plan involves immediate identification of the problem and taking necessary steps to mitigate it.

    • Identify the cause of the emergency shutdown

    • Initiate the emergency shutdown procedure

    • Isolate the affected equipment or area

    • Notify relevant personnel and authorities

    • Implement emergency response plan

    • Conduct post-shutdown analysis and investigation

  • Answered by AI
  • Q3. How measure the level of a vertical vessel for a magnetic LT calibration ?
  • Ans. 

    Use a magnetic level gauge to measure the level of a vertical vessel for calibration.

    • Install a magnetic level gauge on the vertical vessel.

    • Ensure the gauge is properly calibrated and zeroed.

    • Take readings at various levels and record the corresponding magnetic field strengths.

    • Compare the readings to a calibration curve to determine the actual level of the vessel.

    • Adjust the gauge if necessary and repeat the process until

  • Answered by AI
  • Q4. How prepared a JSA?
  • Ans. 

    A JSA is prepared by identifying potential hazards and developing controls to mitigate them.

    • Identify all potential hazards in the work area

    • Determine the likelihood and severity of each hazard

    • Develop controls to mitigate or eliminate the hazards

    • Communicate the JSA to all workers involved in the job

    • Review and update the JSA as needed

  • Answered by AI
  • Q5. How prepared a RFQ?
  • Ans. 

    Preparing an RFQ involves gathering requirements, creating a detailed scope of work, and identifying potential suppliers.

    • Identify the requirements for the project

    • Create a detailed scope of work

    • Identify potential suppliers and send the RFQ to them

    • Include all necessary information in the RFQ, such as project timeline and budget

    • Review and evaluate the responses from suppliers

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Appearance is your first stroke and always confidence about your answer ,don't answering that one which is your out of your knowledge, admit it .If you are belongs from Electrical or Instrumentation then you must have a little bit knowledge about International code of E&I. I answered almost 80% question ,its all about technical question & management type question .

Tell us how to improve this page.

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 428 Interviews
Thermax Limited Interview Questions
4.2
 • 238 Interviews
ABB Interview Questions
4.1
 • 228 Interviews
BHEL Interview Questions
4.1
 • 109 Interviews
GE Interview Questions
4.2
 • 106 Interviews
View all
Deputy Qa Manager
4 salaries
unlock blur

₹14.1 L/yr - ₹17.8 L/yr

QC Engineer
3 salaries
unlock blur

₹3.1 L/yr - ₹3.1 L/yr

Senior Executive - Stores
3 salaries
unlock blur

₹3.6 L/yr - ₹4.5 L/yr

Fitter
3 salaries
unlock blur

₹2 L/yr - ₹2 L/yr

Explore more salaries
Compare Mesura Nirmal Gas Controls with

Emerson Electric Co.

4.1
Compare

Honeywell International India

4.0
Compare

Siemens

4.1
Compare

ABB

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview