i
Mersen
Filter interviews by
I applied via Company Website and was interviewed in Nov 2021. There were 4 interview rounds.
I appeared for an interview before Feb 2024.
Daily Routine Management (DRM) optimizes productivity by structuring daily tasks and priorities effectively.
Establishing clear goals: Setting daily, weekly, and monthly objectives helps maintain focus.
Time blocking: Allocating specific time slots for tasks can enhance concentration and efficiency.
Prioritization: Using methods like the Eisenhower Matrix to distinguish between urgent and important tasks.
Regular reviews: ...
I follow a structured approach to new process development, ensuring thorough analysis, testing, and implementation.
Conduct a needs assessment to identify the problem or opportunity for improvement.
Research existing processes and technologies to gather insights and best practices.
Develop a detailed project plan outlining objectives, timelines, and resources required.
Prototype the new process and conduct pilot testing to...
PFMEA is a systematic approach to identify and mitigate potential process failures and their effects.
1. Define the scope: Identify the process to be analyzed, such as assembly or manufacturing.
2. Assemble a team: Include cross-functional members like engineers, quality, and production staff.
3. Identify potential failure modes: List ways the process could fail, e.g., incorrect assembly.
4. Determine effects of failures: ...
I applied via Walk-in and was interviewed in Jun 2022. There were 5 interview rounds.
Mesuments og products
Customer satisfaction
Any case done to satisfy customer needs and how we resolve
I applied via Recruitment Consulltant
I applied via Recruitment Consulltant and was interviewed in Mar 2023. There were 4 interview rounds.
My previous job KPI was to increase sales revenue by 20% within a year.
My KPI was to increase sales revenue by 20% within a year
I achieved this by implementing targeted marketing campaigns
I also optimized the sales process to improve efficiency
Regularly analyzed sales data to identify areas for improvement
Interview with Plant Chairman
I applied via Referral and was interviewed in Oct 2024. There was 1 interview round.
7QC tools are a set of quality control tools used to identify and solve quality problems in manufacturing processes.
7QC tools include Pareto chart, cause-and-effect diagram, control chart, histogram, scatter diagram, flowchart, and check sheet.
They help in identifying and analyzing quality problems, determining root causes, and implementing corrective actions.
They are used to improve product quality, reduce defects, an...
PPAP and APQP are quality management systems used in manufacturing.
PPAP stands for Production Part Approval Process and is used to ensure that manufactured parts meet customer requirements.
APQP stands for Advanced Product Quality Planning and is used to plan and manage the design and development of new products.
Both systems are commonly used in the automotive industry but can be applied to other manufacturing industrie...
Pareto is a principle that states 80% of effects come from 20% of causes.
Also known as the 80/20 rule
Used in business to identify the most important factors
Can be applied to various fields such as economics, engineering, and social sciences
Example: 80% of a company's profits come from 20% of its customers
OEE can be calculated by multiplying Availability, Performance, and Quality percentages.
Calculate Availability by dividing Operating Time by Planned Production Time.
Calculate Performance by dividing Actual Production by Maximum Production.
Calculate Quality by dividing Good Units by Total Units Produced.
Multiply Availability, Performance, and Quality percentages to get OEE.
I applied via Company Website and was interviewed in Sep 2021. There was 1 interview round.
Six Sigma Black belt implementation project is a process improvement methodology that aims to reduce defects and improve quality.
Identify the problem and define the project scope
Measure the current process performance
Analyze the data to identify root causes of defects
Improve the process by implementing solutions
Control the process to sustain the improvements
Use statistical tools and techniques to drive decision-making
Production Engineer
17
salaries
| ₹3.2 L/yr - ₹6.2 L/yr |
Quality Engineer
14
salaries
| ₹3 L/yr - ₹5.6 L/yr |
Assistant Manager
10
salaries
| ₹8 L/yr - ₹12.5 L/yr |
Store Associate
8
salaries
| ₹3.1 L/yr - ₹4.2 L/yr |
CAM Engineer
8
salaries
| ₹3.6 L/yr - ₹5.5 L/yr |
Dhoot Transmission
Amphenol Interconnect
Saud Bahwan Group
Toyoda Gosei Minda