Filter interviews by
I applied via Company Website and was interviewed in Sep 2021. There was 1 interview round.
Six Sigma Black belt implementation project is a process improvement methodology that aims to reduce defects and improve quality.
Identify the problem and define the project scope
Measure the current process performance
Analyze the data to identify root causes of defects
Improve the process by implementing solutions
Control the process to sustain the improvements
Use statistical tools and techniques to drive decision-making
Normal class 12th standard level type
I applied via Recruitment Consulltant and was interviewed before Apr 2021. There was 1 interview round.
I have experience in fuel system layout, solving top complaints, and understanding how sensors work.
Fuel system layout involves designing and arranging components such as fuel tanks, pumps, filters, and injectors.
I have successfully resolved customer complaints related to fuel efficiency, engine performance, and fuel leaks.
Sensors work by detecting changes in physical or chemical properties and converting them into ele...
I applied via LinkedIn and was interviewed before Feb 2020. There was 1 interview round.
I applied via Shine and was interviewed before Dec 2020. There was 1 interview round.
I applied via Naukri.com and was interviewed before Dec 2019. There were 5 interview rounds.
Implementing lean manufacturing principles, optimizing machine utilization, and investing in automation can improve productivity in machine shops.
Implementing lean manufacturing principles such as 5S, Kaizen, and Kanban can help reduce waste and improve efficiency.
Optimizing machine utilization by scheduling preventive maintenance, reducing setup times, and improving workflow can increase productivity.
Investing in auto...
ABC costing is a method of assigning costs to products based on their consumption of resources. Industrial engineers play a key role in implementing and optimizing ABC costing systems.
ABC costing stands for Activity-Based Costing
It is a method of assigning costs to products based on the resources they consume
Industrial engineers play a key role in implementing and optimizing ABC costing systems
They help identify the ac...
VA/VE stands for Value Analysis/Value Engineering. It is a systematic approach to improve the value of a product or service.
VA/VE aims to reduce costs while maintaining or improving the quality of the product or service.
It involves analyzing the functions of a product or service and identifying areas where costs can be reduced without compromising quality.
Examples of VA/VE projects include redesigning a product to use ...
I applied via Campus Placement and was interviewed before Dec 2020. There were 4 interview rounds.
I was interviewed in Jun 2021.
I applied via Recruitment Consulltant and was interviewed before Feb 2023. There were 2 interview rounds.
Project management process involves planning, executing, monitoring, and closing projects to achieve specific goals.
Initiating: Define project scope, objectives, and stakeholders.
Planning: Develop project plan, schedule, and budget.
Executing: Implement project plan and manage resources.
Monitoring: Track project progress and make adjustments as needed.
Closing: Finalize project deliverables and evaluate project success.
E...
based on 6 reviews
Rating in categories
Product Specialist
34
salaries
| ₹0 L/yr - ₹0 L/yr |
Software Engineer
30
salaries
| ₹0 L/yr - ₹0 L/yr |
Market Intelligence Analyst
27
salaries
| ₹0 L/yr - ₹0 L/yr |
Service Advisor
18
salaries
| ₹0 L/yr - ₹0 L/yr |
Software Developer
15
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Motors
Mahindra & Mahindra
Maruti Suzuki
Ashok Leyland