Filter interviews by
I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.
I applied via Referral and was interviewed in Jul 2024. There was 1 interview round.
I am a recent graduate with a degree in Business Administration, passionate about marketing and eager to learn and grow in a dynamic work environment.
Recent graduate with a degree in Business Administration
Passionate about marketing
Eager to learn and grow in a dynamic work environment
I choose this company because of its strong reputation, innovative projects, and opportunities for growth.
Strong reputation in the industry
Innovative projects that challenge and excite me
Opportunities for growth and development
Positive company culture and values
Great benefits and perks for employees
Quantitative reasoning
posted on 22 Dec 2024
The output voltage of an AAAC Rabbit conductor is typically around 600 volts.
The output voltage of an AAAC Rabbit conductor is usually around 600 volts.
The exact output voltage may vary depending on the specific application and conditions.
It is important to consult the manufacturer's specifications for accurate information.
My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.
Set clear goals and objectives for the project
Create a detailed timeline with milestones and deadlines
Assign tasks to team members based on their strengths and expertise
Regularly monitor progress and make adjustments as needed
Communicate effectively with team members and stakeholders
Ut...
Job safety analysis is a process of identifying potential hazards in a job task and implementing controls to mitigate risks.
Involves breaking down a job task into steps
Identifying potential hazards for each step
Determining preventive measures to reduce risks
Ensures workers are aware of safety procedures
Examples: construction site JSA, manufacturing plant JSA
Hazard identification is the process of identifying potential sources of harm in the workplace, while risk assessment involves evaluating the likelihood and severity of those hazards.
Hazard identification involves identifying potential sources of harm such as chemicals, machinery, or ergonomic factors.
Risk assessment involves evaluating the likelihood and severity of harm from these hazards.
The goal is to implement con...
Fire safety refers to measures taken to prevent and protect against the risks of fire.
Fire safety includes having working smoke detectors in place.
It also involves creating and practicing a fire escape plan.
Proper storage and handling of flammable materials is crucial for fire safety.
Regular maintenance of fire extinguishers and other fire safety equipment is important.
Training employees on fire safety protocols is ess
A hazard site is a location where there is a potential risk of harm to people, property, or the environment.
Hazard sites can include industrial facilities, chemical plants, nuclear power plants, and construction sites.
These sites may contain hazardous materials, dangerous equipment, or unsafe conditions.
Proper safety measures and protocols must be followed at hazard sites to prevent accidents and injuries.
Examples of h...
I applied via LinkedIn and was interviewed in Dec 2024. There was 1 interview round.
posted on 12 Oct 2024
I applied via Approached by Company and was interviewed in Sep 2024. There was 1 interview round.
posted on 19 Sep 2024
There are mainly four grades of bitumen commonly used in construction: VG-10, VG-20, VG-30, and VG-40.
VG-10: Suitable for low-traffic roads
VG-20: Suitable for medium-traffic roads
VG-30: Suitable for high-traffic roads
VG-40: Suitable for heavy-duty traffic areas like airports and container terminals
The compressive strength of cement mortar cube at 3 days is typically around 20-25 MPa.
Compressive strength of cement mortar cube is an important parameter to assess its quality and durability
The strength of cement mortar increases with age, so 3 days is an early testing point
Typical compressive strength values for cement mortar cubes at 3 days range from 20-25 MPa
posted on 27 Jul 2024
My notice period is 30 days.
My notice period is standard 30 days as per company policy.
I am required to serve a 30-day notice period before leaving my current position.
I can start the new role after completing the 30-day notice period.
posted on 4 May 2024
We have ask about civil engineering topics
based on 26 reviews
Rating in categories
Quantity Surveyor
9
salaries
| ₹3 L/yr - ₹5 L/yr |
Site Engineer
7
salaries
| ₹2 L/yr - ₹5.6 L/yr |
Purchase Executive
6
salaries
| ₹2.5 L/yr - ₹5.5 L/yr |
Planning Engineer
6
salaries
| ₹4.5 L/yr - ₹7.5 L/yr |
Administration Executive
6
salaries
| ₹2 L/yr - ₹7.2 L/yr |
TCS
Infosys
Wipro
HCLTech