Filter interviews by
I applied via Company Website and was interviewed in Nov 2023. There were 2 interview rounds.
Motor bearings can be damaged due to various reasons such as lack of lubrication, contamination, overloading, misalignment, or improper installation.
Lack of lubrication can cause increased friction and heat, leading to bearing failure.
Contamination from dirt, dust, or moisture can accelerate wear and tear on the bearings.
Overloading the motor can put excessive stress on the bearings, causing them to fail prematurely.
Mi...
VFD controls motor speed by varying frequency, while soft starter reduces voltage during motor start to limit current.
VFD adjusts motor speed by changing frequency of input power
Soft starter limits current during motor start by reducing voltage
VFD provides precise control over motor speed and torque
Soft starter is simpler and cheaper option for reducing motor start-up current
VFD is more energy efficient compared to sof
Electrostatic Tar Precipitator uses electrostatic forces to remove tar particles from gas streams.
Uses high voltage to ionize gas particles
Charged particles are attracted to oppositely charged plates
Tar particles stick to plates and are removed
Commonly used in industrial applications like power plants and refineries
Earthing is the process of connecting the non-current carrying part of electrical equipment to the earth, while grounding is the process of connecting the current carrying part of electrical equipment to the earth.
Earthing is used to protect against electrical shock by providing a path for fault currents to flow safely into the ground.
Grounding is used to ensure proper functioning of electrical systems by providing a r...
Main causes of communication failure in DCS include network issues, hardware failures, software glitches, and human error.
Network issues such as poor connectivity or network congestion can lead to communication failure.
Hardware failures like malfunctioning cables, routers, or switches can disrupt communication.
Software glitches in the DCS system can cause communication breakdowns.
Human error, such as incorrect configur...
HV transmission lines are not grounded to prevent unwanted current flow and ensure safety.
HV transmission lines operate at high voltages, typically above 69 kV, to efficiently transmit electricity over long distances.
Grounding HV transmission lines can lead to unwanted current flow, power losses, and safety hazards.
Insulation and proper design of HV transmission lines help prevent electrical faults and ensure reliable ...
Amendment bill is a change or addition to an existing bill, while supply and adjust bill is a bill that authorizes the government to spend money.
Amendment bill involves making changes or additions to an existing bill, while supply and adjust bill authorizes government spending.
Amendment bill typically revises specific provisions of a bill, while supply and adjust bill deals with budget allocations.
Basic parameters to c...
Proprietary indent is for specific brand products while single tender indent is for any brand products.
Proprietary indent is used when a specific brand or product is required for a project.
Single tender indent allows for multiple brands or products to be considered for the project.
Proprietary indent may limit competition and increase costs, while single tender indent promotes competition and potentially lowers costs.
Ex...
Top trending discussions
posted on 18 May 2023
I applied via Approached by Company and was interviewed before May 2022. There were 4 interview rounds.
Technical questions related job titles and experiences and job role
posted on 24 Dec 2024
I applied via LinkedIn and was interviewed before Dec 2023. There were 3 interview rounds.
PF can be corrected by updating the details in the PF portal and submitting necessary documents.
Update personal details in the PF portal
Submit required documents for correction
Contact HR or PF department for assistance
Energy saving procedures include optimizing lighting, HVAC systems, and equipment usage.
Implement energy-efficient lighting such as LED bulbs
Regularly maintain and tune HVAC systems for optimal performance
Use programmable thermostats to control heating and cooling
Turn off equipment when not in use to reduce standby power consumption
TPM procedures refer to Total Productive Maintenance practices aimed at maximizing equipment effectiveness and minimizing downtime.
TPM involves proactive maintenance to prevent breakdowns
Focuses on improving overall equipment efficiency
Involves training employees on equipment maintenance
Includes regular inspections and cleaning schedules
Utilizes tools like OEE (Overall Equipment Effectiveness) to measure performance
Criticality of machines can be identified based on their impact on production, safety, and downtime. They can be categorized as critical, essential, or non-essential.
Identify machines critical to production processes, where failure can lead to significant downtime or loss of revenue.
Consider machines critical to safety, where failure can pose a risk to employees or the environment.
Categorize machines as critical, essen...
Seeking new challenges and opportunities for professional growth.
Looking for new challenges and opportunities to learn and grow
Desire for career advancement and development
Seeking a more supportive work environment or better company culture
In about five years, I see myself leading a team of engineers, implementing innovative solutions, and contributing to the growth of the organization.
Leading a team of engineers in executing projects
Implementing innovative solutions to improve efficiency and quality
Contributing to the growth and success of the organization
Continuing professional development and learning new technologies
posted on 16 May 2024
There are 40 questions
Timming for test is 40 minutes
1 minute for each question
posted on 17 Jun 2023
The main objects of the project are to achieve specific goals, deliverables, and outcomes within a set timeframe and budget.
Define clear project objectives and scope
Identify key deliverables and milestones
Allocate resources effectively
Monitor progress and adjust plans as needed
Ensure project goals align with organizational objectives
I applied via Company Website and was interviewed in Mar 2022. There were 3 interview rounds.
I applied via Company Website and was interviewed before Jan 2022. There were 2 interview rounds.
The optimal equipment for running depends on individual preferences and needs.
Running shoes with proper support and cushioning are essential
Comfortable and breathable clothing is recommended
Some runners prefer using wearable technology such as fitness trackers or smartwatches
Hydration packs or belts can be useful for longer runs
Treadmills or elliptical machines can be used for indoor running
Resistance bands or weights ...
I have worked at multiple companies and have attended various types of breakdowns.
I have worked at XYZ Corporation as an Executive for 5 years.
During my time at XYZ Corporation, I attended breakdowns related to supply chain management, financial analysis, and team management.
I also worked at ABC Industries as a Senior Executive for 3 years.
At ABC Industries, I handled breakdowns related to project management, client re...
I applied via Campus Placement and was interviewed in Feb 2023. There were 3 interview rounds.
Was easy mathematical case. Not any preparation required prior to the process
I applied via Recruitment Consulltant and was interviewed in Jul 2022. There were 5 interview rounds.
Lambi fakenge company ke bare me
Tan man dhan se samrpit hone ki kasme khayenge
I applied via Campus Placement and was interviewed in Mar 2024. There were 2 interview rounds.
It was based on personality traits, data analysis, logical reasoning, and some psychometric analysis.
Employee embezzlement of assets has a negative accounting effect on the company's financial statements.
Reduction in assets on the balance sheet
Increase in expenses on the income statement
Potential decrease in net income
Impact on cash flow statement due to loss of assets
Possible need for restatement of financial statements
Legal and regulatory implications
Some of the top questions asked at the Mecon Senior Executive Engineer interview -
based on 1 interview
Interview experience
Assistant Project Engineer
371
salaries
| ₹2.6 L/yr - ₹7 L/yr |
Executive
171
salaries
| ₹6 L/yr - ₹13.5 L/yr |
Executive Engineer
96
salaries
| ₹6 L/yr - ₹12 L/yr |
Project Engineer
83
salaries
| ₹3.5 L/yr - ₹10 L/yr |
Senior Manager
50
salaries
| ₹13 L/yr - ₹30 L/yr |
Hindustan Zinc
Vedanta Aluminium
Vedanta Resources
Carborundum Universal Limited