Upload Button Icon Add office photos

Filter interviews by

MD Construction Field Supervisor Interview Questions and Answers

Updated 1 Mar 2022

MD Construction Field Supervisor Interview Experiences

1 interview found

Field Supervisor Interview Questions & Answers

user image vijay chinnabba

posted on 28 Feb 2022

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Tell me about yourself.
Round 3 - Aptitude Test 
Round 4 - Coding Test 
Round 5 - Group Discussion 
Pro Tip by AmbitionBox:
Don’t treat group discussions as an argument. Group discussion is about reaching a meaningful conclusion.
View all tips
Round 6 - HR 

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Frequency of cube casting & testing per cubic meter
  • Ans. 

    The frequency of cube casting and testing per cubic meter varies depending on the project requirements and specifications.

    • The frequency of cube casting and testing is determined by the project specifications and quality control requirements.

    • In general, cube casting and testing may be done at regular intervals during the construction process.

    • For example, in a large construction project, cube casting and testing may be d...

  • Answered by AI
  • Q2. PEB structure Erection process
  • Q3. Rate analysis of each items of construction
  • Ans. 

    Rate analysis of each item of construction involves determining the cost of materials, labor, and equipment for each construction activity.

    • Rate analysis helps in estimating the total cost of a construction project.

    • It involves breaking down the project into various activities and determining the cost of each activity.

    • Factors considered in rate analysis include material costs, labor costs, equipment costs, and overhead c...

  • Answered by AI
  • Q4. Testing of concrete, sieve analysis fine aggregates, course aggregates
  • Q5. Tremix flooring process

Interview Preparation Tips

Interview preparation tips for other job seekers - Be relaxed & confident during interview
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed before Aug 2023. There were 2 interview rounds.

Round 1 - HR 

(4 Questions)

  • Q1. All about your resume .
  • Q2. Why you want to change job
  • Ans. 

    Seeking new challenges and opportunities for growth in a different environment.

    • Desire for career advancement

    • Seeking new challenges

    • Opportunity for growth

    • Change in work environment

  • Answered by AI
  • Q3. Reloaction related
  • Q4. Work experience and my past companies job responsbility
Round 2 - Technical 

(10 Questions)

  • Q1. Questions from Is code 456
  • Q2. Acceptance criteria of cube
  • Ans. 

    Acceptance criteria of cube includes dimensions, material, weight, and quality standards.

    • Dimensions must meet specified measurements (e.g. 10cm x 10cm x 10cm)

    • Material should be durable and suitable for intended use (e.g. plastic, wood, metal)

    • Weight should be within acceptable range based on material and size

    • Quality standards must be met in terms of finish, edges, and overall construction

  • Answered by AI
  • Q3. Colomn cover tolerance
  • Q4. Stripping time of shutterings
  • Ans. 

    Stripping time of shutterings refers to the time required for removing the formwork from concrete structures.

    • Stripping time depends on factors like type of formwork material, concrete mix design, ambient temperature, and curing method.

    • For example, timber formwork may require longer stripping time compared to steel formwork.

    • In hot weather, concrete may set faster, reducing the stripping time.

    • Proper curing can also affec...

  • Answered by AI
  • Q5. Construction Materials and there site test
  • Q6. Design mix questions
  • Q7. Quality related questions of concrete
  • Q8. Is code 1200 for billing purpose
  • Ans. 

    Code 1200 is not specifically for billing purposes.

    • Code 1200 is typically used in reference to a specific task or action, not billing.

    • It could be related to a specific product, service, or process within a company.

    • For example, code 1200 might indicate a specific troubleshooting step in a technical manual.

  • Answered by AI
  • Q9. Manpower output for works like shuttering,steel,blockwork,plaster etc
  • Ans. 

    Manpower output varies depending on the type of work, with factors such as skill level, equipment availability, and project timeline playing a role.

    • Manpower output for shuttering can range from 10-20 sqm per day depending on complexity

    • Steelwork output can vary from 50-100 kg per worker per day

    • Blockwork output can range from 50-100 blocks per worker per day

    • Plastering output can vary from 10-20 sqm per worker per day

    • Fact...

  • Answered by AI
  • Q10. Last question was about my salary expectation

Interview Preparation Tips

Interview preparation tips for other job seekers - Whatever the work you are doing you have to deep knowledege about there tests, codes, etc and focus on is codes like 456 ,1200
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Breif discussion on your CV/Resume. Experience and Salary structure.
Round 3 - Technical 

(3 Questions)

  • Q1. Related to Electrical field (Questions on Transformer, Generator, Isolator, Sub-Station equipment and Transmission line)
  • Q2. Rating of Transformer (kVA, How to find the current in T/f)
  • Ans. 

    The rating of a transformer is in kVA and the current can be found using the formula: Current (A) = kVA / (1.732 x Voltage)

    • Transformer rating is in kVA (kilo-volt-ampere)

    • To find the current in a transformer, use the formula: Current (A) = kVA / (1.732 x Voltage)

    • For example, if a transformer has a rating of 100 kVA and operates at 480V, the current would be 100 / (1.732 x 480) = 120.7A

  • Answered by AI
  • Q3. Question on Transmission line (structure capacity sagging and length of line)

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to focus on Technical round (Breif knowledge what you have write in your CV/Resume)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. All about your studies and experiences

Interview Preparation Tips

Interview preparation tips for other job seekers - Go through your resume

Interview Questionnaire 

1 Question

  • Q1. QA/QC regarding things

Interview Questionnaire 

1 Question

  • Q1. Water spply scheme project
  • Ans. 

    A water supply scheme project involves designing and implementing a system to provide clean water to a community.

    • Identify the water source and assess its quality

    • Design a treatment system to remove impurities

    • Construct pipelines and storage tanks

    • Implement a distribution system to deliver water to households

    • Train community members on maintenance and operation of the system

  • Answered by AI

I applied via Naukri.com and was interviewed before Mar 2020. There were 4 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Drawing knowedge and competence
  • Q2. Be ready with full knowledge of isometric drawing druing interview..... Mainly isometric be a detail knowledge
  • Q3. Eye contact
  • Q4. Dress code

Interview Preparation Tips

Interview preparation tips for other job seekers - Your time given is almost 1 hour try to answer every answer spontaneous and rigid and comfirm answers

I applied via Walk-in and was interviewed before Aug 2019. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Auto level me TBM kese shift krte hai.
  • Q2. Water supply me DI and HDPE pipe ka Full form kya hai?

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview me concrete se related,Auto level, lab technician se relative questions puchna chaiye.

MD Construction Interview FAQs

How many rounds are there in MD Construction Field Supervisor interview?
MD Construction interview process usually has 6 rounds. The most common rounds in the MD Construction interview process are HR, Resume Shortlist and Aptitude Test.

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 696 Interviews
Tata Projects Interview Questions
4.3
 • 401 Interviews
Tata Technologies Interview Questions
3.7
 • 251 Interviews
TCE Interview Questions
3.8
 • 241 Interviews
Saint-Gobain Interview Questions
4.0
 • 170 Interviews
View all
Project Manager
4 salaries
unlock blur

₹7 L/yr - ₹12 L/yr

Site Incharge
4 salaries
unlock blur

₹2.4 L/yr - ₹5.7 L/yr

Senior Engineer
3 salaries
unlock blur

₹6 L/yr - ₹8.4 L/yr

Civil Site Engineer
3 salaries
unlock blur

₹3.1 L/yr - ₹3.8 L/yr

Safety Officer
3 salaries
unlock blur

₹1.9 L/yr - ₹4.8 L/yr

Explore more salaries
Compare MD Construction with

L&T Construction

4.0
Compare

Shapoorji Pallonji Group

4.2
Compare

Tata Projects

4.3
Compare

Hindustan Construction Company

4.2
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview